Amaal Ventures Limited & Anor v Eros Limited

[2026] EWHC CH 2259 · High Court (Chancery Division) · 2026

Get your free legal insight →Email to a colleague
Get your free legal insight on this case →

The verbatim text of this UK judgment. Sourced directly from The National Archives Find Case Law. Not an AI summary, not a paraphrase — every word below is the original ruling, under Crown copyright and the Open Government Licence v3.0.

Full judgment

1. On 17 April 2026 I handed down judgment in this claim (“the Main Judgment”). The neutral citation number of the Main Judgment is [2026] EWHC 870 (Ch) . I held that the Claimants were entitled to an order for the specific performance of contracts they had entered into with the Defendant in October 2020 for the grant of long leases of flats in Mayfair.

2. On handing down the Main Judgment on 17 April 2026, I made an order adjourning the hearing to a date to be fixed for consideration of what consequential orders ought to be made, including an order for specific performance, costs and ruling on any application for permission to appeal. I directed that the parties must seek to agree the appropriate terms of the order and must inform the Court of the extent of any agreement and identify the outstanding issues in dispute; and that if the parties could not agree, they should file and exchange written submissions on outstanding matters of dispute, together with a time estimate for the hearing and dates of counsel's availability. I also directed that any application to this Court for permission to appeal shall be intimated to this Court not later than 4 p.m. on 30 April 2026. In the end, no such application was made.

3. The parties did not agree the order. The main issue was whether the Claimants were entitled to compensation for late completion – the Claimants claimed that sums totalling around £2.569 million should be deducted from the prices for the Flats, and there were also other issues. After reading correspondence between their solicitors, I directed that a hearing was to be fixed to determine the issues in dispute as to the order that I should make (“the Consequentials Hearing”). On 12 June 2026, I gave directions for the Consequentials Hearing. I directed that the parties were each to serve any evidence on which they wished to rely at the hearing with a draft of the order that they proposed the Court should make.

4. During the hearing it became clear that there were additional issues that needed to be resolved. I directed written submissions on those and they were filed on 5 August 2026.

5. I will address each of the issues on which submissions were made at the Consequentials Hearing, or subsequently in writing, and give my decision on those that need to be determined in order to make an order giving effect to my decisions in the Main Judgment. I will use the expressions defined in the Main Judgment. Are the Claimants entitled to claim compensation for late completion without amending the Particulars of Claim? The relevant provisions of the Contract

6. The Claimants say that they are entitled to late completion compensation under condition 7.2 of the Standard Conditions (5 th edition), which I will refer to as “SC 7.2”. I did not refer to that condition in the Main Judgment because it was not mentioned in the Particulars of Claim or Reply, nor in the submissions made during the trial.

7. The Contracts provided for completion to take place once the Flats were substantially completed. The Defendant was then to serve on the Claimants a Completion Notice and completion was to take place 10 working days later – the “Completion Date”.

8. Clause 11 of the Contracts provided: “ 11 Vacant Possession 11.1 The sale is with vacant possession of the Flat. 11.2 Apportionment is to be made with effect from the Completion Date”.

9. Clause 17 incorporated the Standard Conditions of Sale (5 th edition) with amendments. The relevant Standard Conditions read as follows, with the amendments made by the Contracts shown: “6.3 Apportionments On evidence of proper payment being made, income and outgoings of the property are to be apportioned between the parties so far as the change of ownership on completion will affect entitlement to receive or liability to pay them. 6.3.2 If the whole property is sold with vacant possession or the seller exercises his option in condition 7.2.4, apportionment is to be made with effect from the date of actual completion; otherwise, it is to be made from completion date In apportioning any sum, it is to be assumed that the seller owns the property until the end of the day from which apportionment is made and that the sum accrues from day to day at the rate at which it is payable on that day. For the purpose of apportioning income and outgoings, it is to be assumed that they accrue at an equal daily rate throughout the year. When a sum to be apportioned is not known or easily ascertainable at completion, a provisional apportionment is to be made according to the best estimate available. As soon as the amount is known, a final apportionment is to be made and notified to the other party. Any resulting balance is to be paid no more than ten working days later, and if not then paid the balance is to bear interest at the contract rate from then until payment... 6.4 Amount payable The amount payable by the buyer on completion is the purchase price and the contents price (less any deposit already paid to the seller or his agent) adjusted to take account of: (a) apportionments made under condition 6.3 (b) any compensation to be paid or allowed under condition 7.2 (c) any sum payable under condition 5.1.3. 7.2 Late completion If there is default by either or both of the parties in performing their obligations under the contract and completion is delayed, the party whose total period of default is the greater is to pay compensation to the other party. Compensation is calculated at the contract rate on an amount equal to the purchase price, less (where the buyer is the paying party) any deposit paid the Deposit and any Stage Payments paid , for the period by which the paying party's default exceeds that of the receiving party, or, if shorter, the period between completion date and actual completion. Any claim for loss resulting from delayed completion is to be reduced by any compensation paid under this contract. Where the buyer holds the property as tenant of the seller and completion is delayed, the seller may give notice to the buyer, before the date of actual completion, that he intends to take the net income from the property until completion. If he does so, he cannot claim compensation under condition 7.2.1 as well.”

10. It was common ground that the “contract rate” for these purposes was the “Interest Rate” defined in the Contracts, 4% above the base rate of the Royal Bank of Scotland plc from time to time in force.

11. The Defendant says that the Claimants are not entitled to claim late completion compensation under SC 7.2 without an amendment, because no such claim is pleaded. The Claimants dispute that, saying that the claim form and Particulars of Claim are sufficient to enable them to claim such compensation without amendment. The rules on the contents of the claim form and Particulars of Claim

12. CPR r.16.2(1) provides that a part 7 claim form must: “(a) contain a concise statement of the nature of the claim; (b) specify the remedy which the claimant seeks; (c) contain a statement of value in accordance with rule 16.3, where the claimant is making a claim for money; (d) contain a statement of the interest accrued on that sum, where the only claim is for a specified sum; and (e) contain such other matters as may be set out in a practice direction.”

13. R.16.4 says, insofar as is relevant: “Particulars of claim must include— (a) a concise statement of the facts on which the claimant relies; (b) if the claimant is seeking interest, a statement to that effect and the details set out in paragraph (2) … (2) If the claimant is seeking interest they must— (a) state whether they are doing so— (i) under the terms of a contract; (ii) under an enactment and, if so, which; or (iii) on some other basis and, if so, what that basis is…”.

14. Although the CPR do not require this, it is normal practice for Particulars of Claim to include at the end a list of the remedies that the claimant is seeking – this is generally referred to as “the prayer” and follows the words “And the Claimant claims”. The effect of an omission to specify a remedy or plead facts

15. The CPR do not specify the effect of failing to specify a remedy in the claim form, or of failing to plead in the Particulars of Claim the facts needed to entitle a party to a remedy. R.16.2(5) says: “The court may grant any remedy to which the claimant is entitled, even if that remedy is not specified in the claim form.” No explicit guidance is given as to when that will be appropriate, and there is no equivalent provision in r.16.4 in relation to an omission to plead material facts.

16. Under r.1.2, the rules governing the contents of the claim form and Particulars of Claim, like all of the CPR, have to be interpreted and applied consistently with the overriding objective in CPR r.1.1 of “enabling the court to deal with cases justly and at proportionate cost”, which includes “enforcing compliance with rules”.

17. In order that a case is dealt with justly, it is important that the claim form and Particulars of Claim inform the defendant of the claim being made against them. That is for two reasons. First, so that the defendant can decide what evidence they need to rely on at the trial. Second, so that they know what order will be made against them if they lose, which will inform their decision about whether to try and settle the claim and, if so, on what terms.

18. If it is apparent at the trial that both sides have come to court ready to deal with an issue despite its omission from the statements of case, then there will be no injustice in the Court determining that issue: see Gibson v New [2021] EWHC 1811 (QB) at §92 and §§104-111. But otherwise, a claimant will only be allowed to advance a claim of which the defendant has not had prior notice if an amendment is made to raise the claim, or the parties agree that the claim can proceed without an amendment. As Stanley Burnton LJ said in Dean & Dean v Dionissiou-Moussaoui [2011] EWCA Civ 1331 at §35: “It is the responsibility of the advocates for the parties, but also of the trial judge, to ensure that the trial proceeds on the basis of allegations and issues that are identified in writing. That identification is the function of the pleadings. If the pleadings do not represent the parties' cases, they must be amended or the basis on which the trial is to proceed set out in an agreed document.” The statements of case here

19. The claim form said that the Claimants were claiming: “(a) a declaration that the Contracts have not been determined but remain in force (b) specific performance of the Contracts (c) in the alternative to (b), an order to return the Deposits and/or Stage Payments (as defined in the Claimants' Particulars of Claim) (d) interest (e) further or other relief (f) costs.” Under “Value” it said: “The Claimants seek something other than money” and the court fee of £626 reflected that.

20. The Particulars of Claim did not refer to a claim to late completion compensation. They pleaded a number of the contractual provisions, but not SC 7.2. Nor did they plead the periods during which the parties had been in default in performing their obligations under the Contracts leading to a delay in completion. The prayer claimed the same relief as in the claim form. Discussion

21. On the face of it, the claim form and Particulars of Claim did not plead a claim to late completion compensation under SC 7.2. However, the Claimants argue that the claim to specific performance of the Contracts was sufficient, by itself, to enable them to claim such compensation. They say that is enough to entitle them to claim an order directing the carrying out of all the contractual obligations, including the obligation to pay late completion compensation under SC 7.2 which forms part of the Contracts.

22. I reject that submission, both as a matter of principle and on authority. As a matter of principle, it seems to me to be obvious that fairness to the Defendant required the Claimants to make clear in the claim form and prayer to the Particulars of Claim that they claimed late completion compensation. That is a distinct claim to financial compensation and not merely part of giving effect to the contractual machinery for the grant of the leases. The Claimants also, in my view, needed to plead as material facts the periods of delay in completion for which they asserted each party was responsible, to enable SC 7.2 to be applied.

23. As a matter of authority, there is the decision of Vaisey J in Palmer v Lark [1945] 1 Ch 182 . The principle applied in that case was that when a claimant (then referred to as a “plaintiff”) applied to the court for judgment in default of defence, the court could only grant relief on the basis of the facts claimed in what was then called the “statement of claim”, and is now called the “particulars of claim”. Order 27 rule 11 of the Rules of the Supreme Court at the time said that if the defendant failed to serve a defence within the time allowed by the rules, the plaintiff could set down the action on motion for judgment, and then “such judgment shall be given as upon the statement of claim the Court or a Judge shall consider the plaintiff to be entitled to.” In Young v. Thomas [1892] 2 Ch 134 , Lindley LJ said at p.136, that when dealing with such a motion: “… so far as the rights of the Plaintiff and the relief claimed in the action are concerned, the Judge is to look to the statement of claim, and nothing else”.

24. Palmer v Lark was a claim for specific performance of a contract for the sale of a house. The defendant failed to serve a defence, and the plaintiff applied and obtained judgment in default of defence. The issue was the form of the order to be made. The draft minute of order put forward by the plaintiff included payment of interest on the unpaid balance of the purchase price at the rate of 5%, based on a contractual provision entitling the plaintiff to interest at that rate. Vaisey J held that interest should be awarded at the rate of 4%, that being the usual rate then allowed by the court apart from special agreement. That was because there was no mention of interest in the statement of claim, and: “… though the contract no doubt stipulates for five per cent. I am precluded from acting on that, which involves a reference (which I am not entitled to make) to the contract itself, the rule being that I can only give the relief which the pleading justifies on the face of it; nothing else may be looked at…”.

25. That makes it clear that, under the Rules of the Supreme Court, merely pleading a contract for the sale of land is not sufficient to entitle the claimant to an order for specific performance which includes an award of compensation for late completion based on a contractual provision which had not been pleaded.

26. The Claimants argued that the position is different under the CPR, but I disagree. Part 12, “Default Judgment”, governs the position where no acknowledgment of service or defence is served within the time allowed by the rules. In the case of certain types of claim, judgment may be obtained by an administrative procedure rather than a judicial decision. But in other claims, including a claim for specific performance, the claimant must apply for judgment, and then CPR r.12.12 applies: “Where the claimant makes an application for a default judgment, the court shall give such judgment as the claimant is entitled to on the statement of case.” That requires the Court to consider the claim form and Particulars of Claim, and to award such remedy as the claimant is entitled to on the basis of what is pleaded there.

27. So if the Defendant had failed to serve a defence in this claim, and the Claimants had applied for judgment under CPR r.12.12, I do not think the Claimants would have been entitled to an order providing for them to be paid compensation under SC 7.2, because no such claim is pleaded. That is because a reasonable reader of the claim form and Particulars of Claim would not understand that a claim to such compensation was being made. The fact that the claim has been defended does not alter the fact that claim form and Particulars of Claim do not include a claim for such compensation.

28. The Claimants referred to a number of illustrations from textbooks or decided cases of orders for specific performance which included an account to be taken of what was due to the seller including compensation for late completion. But none of them included an order for compensation for late completion calculated under a contractual provision. In any event they provide no assistance as to what a claimant needs to plead in order to obtain such an order. In most of them, there is no indication of what was pleaded or, in the case of the textbooks, what needs to be pleaded. In one of the cases relied on, Burton v Todd (1818) 1 Swans 255, where the order did include compensation for late completion, the report makes it clear that such a claim was pleaded.

29. The Claimants then argued that the directions which I gave on 12 June 2026, properly construed, meant that I had determined that the claim to compensation did not need to be pleaded. That is plainly not what the directions mean, and it is certainly not what I intended them to mean, so that if necessary I would correct them under the slip rule.

30. The Claimants next relied on the fact that the pleadings refer to a completion statement which included late completion compensation in favour of the Defendant. The Particulars of Claim plead that the figures in the first version of the completion statement sent on 30 August 2023, at 3.19 pm, were incorrect in respect of the apportionment of the service charges and that this invalidated the Completion Notices. The Defence at §16 admitted that the figures in the completion statement sent at that time were incorrect, in that interest was calculated from 21 June 2023 rather than 16 August 2023, and the service charge and ground rent were apportioned from 21 June 2023 rather than 16 August 2023, and said that a correct completion statement had been provided at 5.23 pm on 30 August. The Reply admitted that.

31. The Claimant submitted that this made it clear that both parties were proceeding on the basis that compensation for late completion was payable under SC 7.2. They argued that there was a consensus on the pleadings that the correct completion statement included compensation for late completion by an adjustment of the purchase price. Therefore it could have come as no surprise to the Defendant that the Claimants were making such a claim.

32. I disagree. The Particulars of Claim said nothing about compensation for late completion – the allegation was that the first completion statement on 30 August incorrectly stated the service charges. The Defence did refer to interest, but only for the purpose of accepting that the first completion statement on 30 August was incorrect. The Reply did no more than admit that. Nothing in the pleadings would have alerted a reasonable person in the Defendant’s position to the fact that the Claimants proposed to claim late completion compensation.

33. The completion statements provided on 30 August 2023 and the response to them do indicate that the parties were proceeding on the basis of a common assumption that the calculation of the amount payable by the Claimants to the Defendant in September 2023 should include interest for late completion. But that is quite insufficient to establish that the Claimants gave notice to the Defendant that the Claimants proposed to claim late completion compensation or that the Defendant came to the trial ready to deal with such a claim.

34. Accordingly, I conclude that the Claimants cannot claim compensation under SC 7.2 unless I grant them permission to amend to plead such a claim. Should the Claimants be given permission to amend to claim late completion compensation? The application for permission to amend

35. On 24 June 2026, the Claimants issued an application notice claiming permission to amend their Particulars of Claim to claim late completion compensation. That was accompanied by a witness statement of the same date by Akhil Markanday, a partner in BCLP, which dealt with a number of issues, including the amendment application. On that topic, the witness statement simply said: “However, whilst the Claimants consider this unnecessary, for the sake of good order and in the event the Court considers there ought to be an amendment, the Claimants are, on today’s date, making an application for permission to amend their Particulars of Claim accordingly and will request that such application be dealt with at the Consequentials Hearing to the extent required.” The principles which apply to an application to amend a statement of case

36. A statement of case which has been served may be amended only with the written consent of all other parties or the permission of the court: CPR r.17.1.

37. The principles which apply to an application to amend a statement of case have been reviewed in a number of cases. I was referred to Quah Su-Ling v Goldman Sachs International [2015] EWHC 759 at §§36-38 (Carr J), Nesbit Law Group LLP v Acasta European Insurance Company Ltd [2018] EWCA Civ 268 at §41 (Sir Geoffrey Vos, Chancellor), Clarke v Guardian News and Media Limited [2025] EWHC 517 (KB) at §27 (Steyn J) and Tatneft v Bogolyubov [2020] EWHC 623 (Comm) at §15 (Jacobs J). I have also considered Vilca v Xstrata Ltd [2017] EWHC 2096 (QB) at §22-30 (Stuart-Smith J) which is referred to in Tatneft.

38. Those authorities all involved amendments being applied for before the trial. I was not referred to any authority on the correct approach where an application to amend is made after the handing down of judgment but before the making of the order giving effect to the judgment. However, I think that the same principles should apply, adapted to the fact that the application is made after judgment has been delivered.

39. From the above authorities, I consider that the following principles are applicable here: (a) An amendment must be pleaded with sufficient detail to enable the other party and the Court to understand the case that is being advanced, and must disclose a claim which has a real prospect of success. (b) Subject to that, the Court has to strike a balance, applying the overriding objective, between injustice to the applicant if the amendment is refused, and injustice to the opposing party and other litigants in general, if the amendment is permitted. On the one hand, it is, on the face of it, unjust to a claimant to be deprived of the opportunity of putting forward a claim with a real prospect of success. On the other hand, depending on when the amendment is made, and its effects, it may be unjust to the defendant to allow the claim to be raised late in the proceedings. (c) In striking that balance, it must be remembered that justice cannot always be measured in terms of money. The court should take into account the strain the litigation imposes on litigants, the anxieties occasioned by facing new issues, the raising of false hopes, and the legitimate expectation that the trial will determine the issues one way or the other. Further, if the failure to make the amendment earlier is the fault of the applicant’s lawyers, there will be cases where justice will be better served by allowing the consequences of the negligence of the lawyers to fall upon their own heads rather than by allowing an amendment at a very late stage of the proceedings. In Clarke , Steyn J said at §5: “Prejudice to the amending party which has come about by the amending party’s own conduct will be a less weighty factor.” (d) An amendment will be treated as being made “late” if it could have been advanced earlier, or involves the duplication of cost and effort, or if it requires the resisting party to revisit any of the significant steps in the litigation (such as disclosure or the provision of witness statements and expert's reports) which have been completed by the time of the amendment. An amendment will be treated as being made “very late” if permission to amend threatens the trial date. Further, in Clarke at §27, Steyn J said that an application served on the eve of the trial should be regarded as made “very late” because it was obvious that it should be so regarded, even if the court did not consider that the trial would have to be adjourned if it were granted. (e) Where a very late application to amend is made, “a heavy burden lies on a party seeking a very late amendment to show the strength of the new case and why justice to him, his opponent and other court users requires him to be able to pursue it”, per Carr J in Quah Su-Ling at §38(b). (f) If there is an explanation for the amendment e.g. a change in the law, or the discovery of new facts, then the applicant should provide that explanation. The presence or absence of an explanation is an important factor in the necessary balancing exercise. Some judges have said that there must be a good explanation for a late amendment – see per Carr J in Quah Su-Ling at §38(f): “… it is incumbent on a party seeking the indulgence of the court to be allowed to raise a late claim to provide a good explanation for the delay”; per Coulson J in CIP Properties (AIPT) v Galliford Try Infrastructure Limited [2015] EWHC 1345 (TCC) at 28(c): “… there must be a good reason for the delay” and per Steyn J in Clarke at §4: “… there must be a good reason for the delay.” But there are other authorities stating that an explanation for the delay, or its absence, is a factor to be taken into account rather than an essential requirement. The authorities on this were reviewed by Stuart-Smith J in Vilca at §29 and he concluded: “ I would not agree that there must be a good explanation for delay… I adopt the approach that the presence or absence of an explanation which justifies the delay is one of the factors to be considered in deciding where to strike a fair balance. ” That was applied by Jacobs J in Tatneft and I consider that is the correct approach. In many cases, the only explanation for an amendment is that a party’s lawyers have reviewed the case and have had a new idea about how it should best be presented. That is not a good reason for a late amendment, but unless the amendment causes prejudice to the other party, such an amendment is generally consented to and, if not consented to, permitted by the court. The position here

40. There is no doubt that the proposed amendment is pleaded with sufficient detail to enable the Defendant and the court to understand the case that is being advanced, and that it discloses a claim which has a real prospect of success. The Defendant did not suggest otherwise.

41. This application was made after the trial and after judgment had been handed down. Mr Seitler KC for the Defendant submitted that this was not just “very late” but “very, very late”. I agree with that, and I also agree with his submission that this means that there is a heavy burden on the Claimants to show why justice requires them to be able to pursue it.

42. Bearing that in mind, I have to strike a balance. I will do so by identifying the factors I consider should be taken into account and the weight to be given to them, and then conduct a balancing exercise.

43. First, if permission to amend is refused, the Claimants will be prevented from putting forward a claim with a real prospect of success which would lead to a reduction in the purchase price of around £2.569 million. For the purposes of the balancing exercise, I think I should assume that the Claimants will succeed in the claim, so that if I refuse permission to amend, it will mean that the Claimants end up paying around £2.569 million more for the Flats than they should. I give that factor very substantial weight.

44. Second, there is no explanation for the lateness of the amendment. None was provided in the witness statement in support of the application. In submissions, Ms Wicks KC for the Claimants did not offer an explanation, but pointed out that late completion compensation would only be due under the Contracts if the decision following the trial was that valid Completion Notices were served, but the notices to complete were invalid. That is true, but it does not get close to being an explanation for the lateness of the amendment. It must have been obvious to the Claimants, and certainly should have been, that one possible outcome of the trial would be that the Court would find that the Completion Notices which were served were valid, but that the notices to complete were not. I give that factor substantial weight.

45. Third, there is the fact that the hearing took 3 days (the first used for judicial pre-reading) and most of that was spent on the compensation claim. Mr Seitler for the Defendant submitted that this was an important factor, because it meant that other litigants had been deprived of the court’s resources. I agree that if the late completion compensation claim had been pleaded when it should, the trial would have dealt with that claim, the judgment would have determined it, and the issues about the order to be made would probably have been dealt with at a half day hearing. But in that case, the trial would have needed to have been longer, so overall the same amount of the court’s resources would have been used. In any event, I cannot, by refusing permission to amend, save the court’s resources which have already been expended. I therefore give this factor no weight.

46. Fourth, Mr Seitler argued that by only introducing this claim after the trial, the Claimants had secured a forensic advantage. At the trial, the Claimants were able to argue that the provisions in the Contracts for the forfeiture of the Deposit and Stage Payments were penalties. They were able to argue that without having to worry about whether that would make it difficult for them to argue that the right to late completion compensation was not a penalty. And at the Consequentials Hearing, the Claimants were able to argue that the provision for the payment of late payment compensation to the Claimants was not a penalty without having to worry about that cutting across the argument that the forfeiture provisions were penal. I reject that argument. The arguments which the Claimants put forward at the trial on the issue of whether the forfeiture provisions were penal were quite different in character to those advanced at the Consequentials Hearing as to why SC 7.2 was not penal. I do not consider that the Claimants gained any forensic advantage by delaying the compensation claim until after the judgment. So I give this factor no weight.

47. Fifth, Mr Seitler and Mr McCreath both submitted that the Defendant might have adduced additional evidence at the trial on the issue of whether SC 7.2 was penal. Mr Seitler suggested that there might have been evidence as to the Claimants’ expectation as to the rents they might receive, or as to increased tax liabilities resulting from late completion. I do not think such evidence would have been relevant as it would have shed no light on the meaning of the Contracts.

48. Mr McCreath, who addressed the penalty issue, said that evidence might have been called as to standard practice in contracts of this kind. He suggested that there might be evidence that in contracts of this kind – for an off-plan sale to an investor – SC 7.2 is routinely deleted or amended. Such evidence would, I think, have been admissible to rebut the Claimants’ argument that the use of SC 7.2 in contracts of this kind is standard practice, and therefore should be regarded as not penal: see Cavendish Square Holding BV v Makdessi [2015] UKSC 67 ; [2016] AC 1172 at §100 and §287.

49. The Claimants argued that no weight should be given to this factor, because the Defendant could have adduced any evidence it wanted to in response to the application for permission to amend. I reject that argument. I do not think it is incumbent on a party resisting an application for permission to amend to serve all the evidence that they would wish to rely on if the amendment was allowed.

50. However, I consider that any prejudice to the Defendant attributable to their having lost the opportunity to adduce evidence on standard practice could be avoided by my refusing to give any weight to the standard practice argument when determining if SC 7.2 is penal. I therefore give this factor no weight.

51. Sixth, the Defendant relied on the fact that the Defendant had been deprived of the opportunity of taking into account the compensation claim when making an evaluation of the risks and rewards of contesting the claim. The Defendant’s evaluation of whether to fight the case and what, if any, settlement offer to make had been made on the basis that: (a) if they won, they would keep the Deposit and Stage Payments and get a substantial contribution to their costs of the claim; (b) if they lost, they would have to sell the Flats at the contractual prices, and make a substantial contribution to the Claimants’ costs. The introduction of the compensation claim substantially changed the balance of risk and reward and did so at a time when the Court had determined the pleaded issues so that it was too late for the Defendant to make a settlement offer which took into account both the merits of the pleaded issues and the compensation claim.

52. The Claimants’ response to that was to say that there was no evidence that the Defendant would have made a settlement offer if the compensation claim had been pleaded originally, or by an amendment which was not made late, and I should find that the Defendant would have pressed on regardless.

53. It is true that there is no evidence that the Defendant would have made a settlement offer if the compensation claim had been pleaded before the trial. However, any such evidence could be no more than a reconstruction of what would have happened in a hypothetical world and it would be very difficult for the Defendant to do more than assert that it would have taken different action.

54. Where a person claims damages for loss they say was caused by a breach of duty, it is incumbent on them to prove what, on the balance of probabilities, they would have done if the duty had been performed. But that is not the situation here. The Defendant is not making a claim. Rather, it is asking the court to take into account that it lost the opportunity to make a different evaluation of the costs and benefits of defending the claim to the one it did make, because the compensation claim was not advanced until after judgment.

55. In my judgment, that is a relevant factor, and a very important one. I think it is self-evident that a reasonable person in the Defendant’s position would have made a very different assessment of the costs and benefits of defending the claim if the compensation claim formed part of the claim. It is true that I held in the Main Judgment that Mr Gehlaut’s decision to terminate the Contracts on 4 September 2023 was because of his frustration with the Claimants’ delays and excuses, when it was in the Defendant’s commercial interests to allow completion to take place late, and that decision was uncommercial and unreasonable. But it does not follow that the Defendant would have acted uncommercially and unreasonably in deciding whether to defend or settle the claim if a compensation claim had been made. On the contrary, although Mr Gehlaut acted uncommercially and unreasonably on one occasion, it seemed clear from his evidence given at trial that he is an experienced and successful entrepreneur with over 20 years’ experience of real estate development in both India and England. I think that there was a real and substantial chance that, faced with a compensation claim, and with access to first rate legal advice, he would have acted reasonably and would have caused the Defendant to make a settlement offer which took into account the severe downside of losing the claim if the compensation claim succeeded.

56. That is not to say that the settlement offer would have been accepted. It might not, and the Defendant might well have ended up having to pay the compensation. But I do think that, by delaying making the compensation claim until after judgment, the Defendant was deprived of a real and substantial chance of settling the claim on terms which would have left it very much better off than it will be if the compensation claim is now introduced by amendment and succeeds. I give that factor very substantial weight.

57. So discounting the factors that I give no weight, I am left with three matters to consider – the first, second and sixth factors identified above. Weighing those up, I am in no doubt that the balance comes down in the Defendant’s favour. It is true that, by refusing the amendment, I am depriving the Claimants of a very large amount of money. But, as Steyn J said in Clarke , at §5: “Prejudice to the amending party which has come about by the amending party’s own conduct will be a less weighty factor.” The absence of any explanation for the lateness of the amendment means that the prejudice to the Claimants must be regarded as prejudice which came about by their own conduct. That prejudice is, therefore, a less weighty factor. Against that, I must weigh what I consider to be substantial prejudice to the Defendant, in depriving it of the ability to evaluate the costs and benefits of the claim including the compensation claim, and to reflect that evaluation in its approach to settlement prior to the Main Judgment.

58. I therefore refuse permission to the Claimants to amend to claim late completion compensation. Issues which would arise if the Claimants were able to claim late completion compensation

59. If I had held that the Claimants could claim late completion compensation, either because no amendment was needed or because I permitted them to amend, a number of issues would have needed to be determined: (a) Is the obligation to pay late completion compensation to the Defendant under SC 7.2 void as a penalty? (b) If not, can the compensation be deducted from the purchase price? (c) What periods of delay were caused by the Claimants’ default and what by the Defendant’s default?

60. Given my decision on the amendment application, these issues do not arise, and I do not, therefore, have to decide them in order to determine the form of the order that I should make. Accordingly, I do not propose to decide them. The issue of whether SC 7.2 is void as a penalty is of general importance, and I think it would be wrong of me to determine it when that is unnecessary. Were the notices to complete served by the Defendant after the handing down of judgment valid?

61. Following the handing down of judgment, the Defendant served a number of notices to complete. The Claimants responded that these notices could be of no effect, because once the Court has determined that an order for specific performance should be made, a party may no longer serve a notice to complete. They also contended that the Defendant’s insistence on completing without a deduction for late completion compensation meant that the Defendant was not ready, able and willing to complete.

62. Accordingly, one of the issues which I directed should be tried at the Consequentials Hearing was whether those notices to complete were valid.

63. The Defendant has not elected to terminate the Contracts following the expiry of the notices to complete, so it might be thought that the issue is academic. Nonetheless, I consider I should decide the point, as there will be a short period of time between my circulating a draft of this judgment and of the order I propose to make, and the order being made. If the notices to complete are valid, then the Defendant would be able to elect to terminate during that period.

64. In Hasham v Zenab [1960] AC 316 , the Privy Council held that a party to a contract for the sale of land can obtain an order for specific performance before the completion date. Lord Tucker, delivering the judgment, said at p.329-330: “In equity all that is required is to show circumstances which will justify the intervention by a court of equity. The purchaser has an equitable interest in the land and could get an injunction to prevent the vendor disposing of the property. The order for specific performance often falls into two parts. The first can be of a declaratory nature and the second contain consequential directions. The first of the forms in volume 3 of the seventh edition of Seton's Forms of Judgments and Orders, at p. 2136, is clearly suitable to a case where the time for performance may not have arrived even at the date of the order, but in such a case, in the event of subsequent non-performance the court would not require the issue of a fresh writ before making the consequential directions for performance. The court will not, of course, compel a party to perform his contract before the contract date arrives, and would give relief from any order in the event of an intervening circumstance frustrating the contract.”

65. In Singh v Nazeer [1979] 1 Ch 474 , a seller entered into a contract to sell a property to a purchaser. The completion date was 23 June 1972. The seller failed to complete and the purchaser issued a writ claiming specific performance. An order for specific performance was made, and an appeal was dismissed. However, then the purchaser failed to take the steps necessary to enable completion to take place, and the seller served a notice to complete. The purchaser still did not complete, and after the notice expired, the seller applied to the court for an order forfeiting the deposit and giving the seller liberty to resell the property, and damages. Sir Robert Megarry VC dismissed the application, on the ground that once an order for specific performance of a contract has been made, a party cannot serve a valid notice to complete. He held that, by applying to the court for an order of specific performance, and obtaining it, a party puts into the hands of the court how the contract is to be carried out. As the court has become seised of the matter, and has made an order, subject to anything that the parties may then agree, the working out, variation or cancellation of that order is essentially a matter for the court. He said at p.481: “In my judgment, where, as in this case, an order for specific performance contains not only the declaratory part but also the consequential directions (I adopt the terminology of Hasham v. Zenab [1960] A.C. 316 ), those consequential directions regulate the performance of the contract so long as they stand and are not varied by the court. If those consequential directions are not complied with, then the court may make an appropriate order in respect of the default, that default being a breach not so much of the still subsisting contract as of the order of the court as to how that contract is to be carried out…”.

66. At p.482 he said that no notice to complete could be served once the order for specific performance had been made: “First, as a matter of construction I do not consider that general condition 19 can be intended to operate in any case where a full decree of specific performance has been made. I can see nothing in it which suggests that the parties intend to contract that a notice under that condition is to supersede or transcend or vary or interfere with an order of the court for specific performance. The condition seems to me to be a useful and beneficial provision which is to apply in all normal cases where the parties are carrying out the contract out of court, but it is not intended to apply where the contract is being carried out under the directions of the court, and those directions are not compatible with the operation of the condition. Second, quite apart from the construction to be put upon the condition, and even if the condition were to be intended to apply despite an order for specific performance, I do not think it would be operative unless the order of the court contained some saving provision which preserved its effect. The applicability of the condition is something that could and should be argued out when the court decides what order to make, and it may or may not help to shape the order that is made. Just as other provisions of the contract were superseded by the consequential directions given by the court, so I think that this condition will be superseded by these directions. I hold that the completion notice is bad.”

67. Sir Robert Megarry VC did not have to consider there what the position would be if the Court had determined that an order for specific performance should be made, and directed the parties to seek to agree the terms of the order with provision for a hearing if the order cannot be agreed, but no such order had yet been made. I was not shown any authority which considered that situation.

68. However, I think that the speech of Lord Wilberforce in Johnson v Agnew [1980] AC 367 does provide assistance on the issue. There, Lord Wilberforce, with whom the other Law Lords agreed, explained at pp.393-4 that when specific performance is ordered, the contract remains in effect and is not merged in the judgment. However, once such an order has been made, the seller cannot treat the contract as repudiated except by order of the court. If the order for specific performance is not complied with by the purchaser, the seller may either apply to the court for enforcement of the order, or may apply to the court to dissolve the order and ask the court to put an end to the contract. At p.399 he said: “Once the matter has been placed in the hands of a court of equity, or one exercising equity jurisdiction, the subsequent control of the matter will be exercised according to equitable principles. The court would not make an order dissolving the decree of specific performance and terminating the contract (with recovery of damages) if to do so would be unjust, in the circumstances then existing, to the other party, in this case to the purchaser.”

69. In my view, the contract should be treated as “placed in the hands of the court” for these purposes once the court determines that the claimant is entitled to an order for specific performance and has directed the parties to seek to agree the terms of that order, even though the court has not yet given directions as to how the contract is to be performed. I think both the reasons given in Singh v Nazeer apply at that point: (a) As a matter of interpretation of the Contracts, I do not think the right to serve a notice to complete under Standard Condition 6.8 is intended to apply once the Court has determined that an order for specific performance is to be made and has directed the parties to seek to agree the terms of that order, with provision for a hearing if the parties do not reach agreement. (b) Even if that is wrong, once the Court has determined that a specific performance order should be made and has directed the parties to seek to agree the terms of the specific performance order, I do not think that a valid notice to complete under Standard Condition 6.8 can be served in the period until the order is made. As Sir Robert Megarry said in Singh v Nazeer, the applicability of the condition is something that could and should be argued out when the court decides what order to make, and it may or may not help to shape the order that is made. It is not consistent with that for a party to be able to serve notice to complete during the period between the court’s determination to order specific performance and the order being made.

70. Accordingly, I determine that the Defendant was not entitled to serve notices to complete after 17 April 2026 and is not entitled to serve notices to complete now and I will so declare in the order I will make. Should the Court order that the Contracts be discharged?

71. It is clear from Johnson v Agnew that once an order for specific performance has been made, the party who obtained the order may apply to the Court to discharge the order and put an end to the contract. I can see no reason why the other party cannot also make such an application. Any such application ought to be made by application notice under CPR part 23. Here, the Defendant has issued no such application notice, but the Claimants were on notice that the Defendant would be seeking such an order, and fully able to deal with the point. I therefore think I should deal with the application on its merits.

72. I was shown two authorities on the correct approach where the party who obtained the order for specific performance seeks to have it revoked, and to have instead an order terminating the contract: Hillel v Christoforides (1991) 63 P & CR 301 (Millett J) and Ahmed v Wingrove [2007] EWHC 1777 (Ch) (Michael Furness QC sitting as a deputy High Court Judge).

73. In Hillel , the contractual completion date was 13 April 1988. The purchaser did not complete, and the seller obtained an order for specific performance on 4 May 1989 with an inquiry as to the amount due. On 18 July 1989, that inquiry resulted in an order that £47,000 was due with £3,000 by way of costs, and a further date for completion was fixed for 20 July 1989 with documents of title to be exchanged against the balance of the money. Completion did not take place on that date, and on 14 February 1990, the seller obtained what was referred to as a “four-day order”.

74. This form of order is explained in the judgment of Sir James Munby P in The Solicitor General v. JMJ (Contempt) [2013] EWHC 2579 (Fam) at §21: "A mandatory order is not enforceable by committal unless it specifies the time for compliance… If it is desired to make such an order enforceable in respect of some omission after the specified time, the order must go on to specify another, later, time by which compliance is required. Hence the form of 'four-day order' hallowed by long usage in the Chancery Division, requiring the act to be done 'by [a specified date] or thereafter within four days after service of the order'.”.

75. The order in Hillel required the seller to lodge in court the documents needed to complete the sale and for the purchaser to then pay the completion monies within 4 days thereafter. It was described by Millett J at p.305 as “a peremptory order of the court requiring him to complete within four days”. I think that by “peremptory”, what Millett J meant was that, because the order fixed a time for compliance, a breach potentially put the purchaser in contempt of court and that as it had been made after default in compliance with a previous order, it was an order of a character such that it would be unlikely that the court would grant an extension of time. That is why he said at p.304: “there has been a breach of a peremptory order of the court by the purchaser, who is in mercy”. There is nothing to indicate in the judgment that the four day order was an “unless” order, which says that a specified sanction applies if the order is not complied with. In Ahmed at §13 ¸ Mr Furness QC said that the four day order in Hillel was an “unless” order, but I do not think that is correct.

76. Following the four day order, the seller complied with the order and lodged the requisite documents in court, but the purchaser failed to complete. On 2 October 1990 the seller applied for an order dissolving the order for specific performance and treating the contract as discharged. Millett J made that order. He quoted from Lord Wilberforce’s speech in Johnson v Agnew and then said: “I take the relevant equitable principle to be the fundamental principle of equity which will not permit a party unconscionably to insist upon his legal rights. That is consistent with the decision in Johnson v. Agnew itself. Once the innocent party, having obtained a decree of specific performance, gives notice that he proposes to ask the court to permit him to rescind the contract, the other party is on notice. He should complete at once, for he can no longer rely upon the subsistence of the decree of specific performance to give him further time in which to fulfil his contractual obligations. The essential question which the court must ask itself is whether, in the circumstances as they obtained at the date when that notice was given, it would be unconscionable for the innocent party to exercise his legal right to treat himself as discharged by the other's breach. If not , it would be unjust to deny him his contractual right. Accordingly, I do not accept that the court has an unfettered discretion to consider what in all the circumstances of the case might be the fairest thing to do at the date of the hearing. The fundamental consideration must be that on a past date the applicant has given notice of his intention to treat the other's repudiatory breach of contract as discharging him from all further performance of the contract”. The law report says “If so”, but as Mr Furness QC said in Ahmed at §12, that is clearly an error and it should be read as “If not”.

77. It is not apparent from the report why Millett J considered that the purchaser was in repudiatory breach of the contract in failing to complete. The judgment does not record that time was originally of the essence for the completion date, nor that the seller served a notice to complete prior to applying for a specific performance order. However, it is clear that Millett J did consider that the purchaser’s failure to complete was not merely a breach of contract, but a repudiatory breach.

78. Millett J gave two reasons for granting the seller’s application: “I will first consider the case as a matter of contract, and disregard the existence of the decree of specific performance. The vendor kept the contract alive until he served the notice of motion to rescind. By doing so he ran the risk that the purchaser might, however late, turn up with the purchase money and insist upon completing. However, the purchaser did not do so and every day that the purchaser delayed completing he ran the risk that the vendor would accept his repudiatory breach. The vendor gave notice of rescission before the purchaser sought to complete and in my judgment it must be too late for the purchaser to complete unless the vendor has acted in some way to make it unconscionable for him to insist upon his legal rights. Next, the purchaser is in breach of a peremptory order of the court requiring him to complete within four days. It requires exceptional circumstances for the court to extend the time for compliance with a peremptory order after the time for compliance has expired. No special grounds have been put forward for extending the time for compliance with the order, and in my judgment to extend the time after the vendor has given notice of his wish to rescind and thus to alter the substantive rights of the parties, is out of the question. For those reasons, I would exercise my discretion in favour of permitting the vendor to rescind.

79. In Ahmed v Wingrove, an order for specific performance was made on 28 July 2006 in favour of the purchaser under an option agreement. This order provided for completion to take place on 20 October 2006. Completion did not take place on that date. The judgment records that the purchaser may not have had the funds in place to complete on that date, and that he had legitimate concerns about a right of way being claimed by the sellers and a reasonable outstanding request to visit and check that fences erected by the sellers were in the right place. On 25 October, the sellers’ solicitors wrote saying that the purchaser’s failure to complete on 20 October was a repudiatory breach, and the sellers accepted it and terminated the option agreement. The purchaser then pressed for completion but the sellers refused to engage.

80. The sellers asked the Court to discharge the contract because of the purchaser’s failure to complete on 20 October, but Mr Furness QC refused to do so. At §13, he said that neither of the two factors which Millett J relied on in Hillel were present in the Ahmed case. In Hillel the purchaser was in repudiatory breach but that was not the case in Ahmed. Nor had a peremptory order been made. He then said at §14: “In the circumstances I do not consider that I am compelled to reach the same conclusion as Millett J reached … Instead I propose to address the question whether Mr Wingrove should be allowed further time to complete the contract as I would any other application for an extension of time, that is to say having regard to the justice of the case and, so far as relevant, the overriding objective. In those circumstances I have no hesitation in this case in making an order extending the time for completion. I consider that in the face of the unwarranted claim by Mr and Mrs Ahmed to a right of way over the access strip it was not unreasonable for Mr Wingrove to try and get to the bottom of this issue before completion. Similarly his request to be allowed access to check the position of the fences was a reasonable one. I am not saying that had time been of the essence either of these issues would have justified failure to complete. But had time been of the essence no doubt Mr Wingrove and his solicitor would have thought more carefully about the need to complete first and, if necessary, argue later.”

81. Applying the principles to be derived from those cases: (a) The Claimants are not in repudiatory breach of the Contracts by refusing to complete without a deduction from the purchase price in respect of late completion compensation. I have held that the notices to complete served by the Defendant were invalid, so they did not make time of the essence. (b) Nor could the Claimants’ conduct, in claiming that they were entitled to refuse to complete without that deduction, be regarded as renouncing the contract: see Woodar v Wimpey [1980] 1 WLR 277 . (c) Accordingly, this is not a case where the Defendant has a right to treat the Contracts as terminated. Rather, it is a case where the Court has a discretion as to whether to order termination, and should make such order as it considers just in the circumstances. (d) No order fixing a date for completion has yet been made, let alone a peremptory order. The Claimants are therefore not in breach of any order in failing to complete. (e) The claim to deduct late completion compensation was a reasonable one, made in good faith, albeit that I have held that the Claimants were not entitled to make it.

82. That being so, I consider that it would be wrong to direct the termination of the Contracts, without first fixing a time for completion of the Contracts and so giving the Claimants the opportunity to comply with their obligations under the Contracts. The Defendant submitted that there are real doubts that the Claimants are in a position to raise the money to complete. The evidence on that is exiguous, but even if it is doubtful that the Claimants can raise the money, I think it right to give the Claimants the opportunity to try. I therefore refuse the Defendant’s application to discharge the Contracts. Should the order direct the surrender of the existing underleases of the Flats and the grant of new underleases, or the transfer of the existing underleases? The relevant facts

83. To understand this issue, it is necessary to set out some of the history.

84. Prior to 4 September 2023, the Defendant granted a lease to Eros Services Limited, an associated company, of premises which included the Flats. I was not shown a copy of that lease but was told of its existence. Although that meant that any lease that the Claimants were granted would be an underlease, the Claimants did not submit that this affected in any way the Defendant’s ability to complete the Contracts.

85. On 9 January 2024, Eros Services Limited granted an underlease of each of the Flats (“the 2024 Underleases”) to two associated companies Eros Services (Nominee 1) Limited and Eros Services (Nominee 2) Limited (“the Nominees”) and they were charged to Standard Chartered Bank to secure a loan from that bank to the Defendant. This was because as part of a refinancing with Standard Chartered in January 2024, the bank insisted on individual leases being granted to nominee companies with those leases charged to the bank. The 2024 Underleases were identical to the draft leases attached to the Contracts except that they reserved only a peppercorn rent, while the draft leases reserved rents of £3,000 p.a. and £4,000 p.a. doubling on every 25 th anniversary of the commencement of the term for the first 125 years of the term.

86. On 21 April 2026, Kingsley Napley, who were dealing with the conveyancing for the Defendant, sent BCLP engrossed copies of the underleases for both Flats. They sent one copy showing the tenant as the relevant Claimant, and another showing the tenant as Mr Aadinatha.

87. On 22 April 2026, BCLP replied saying that they proposed to proceed using the leases in the name of Mr Aadinatha, the beneficial owner of the Claimants (which had previously been agreed in 2023) and asked for confirmation that the Defendant remained content to do so. Kingsley Napley responded saying that the Defendant was willing to grant the leases to Mr Aadinatha on the basis that he completed within the currency of the current notices to complete.

88. On 23 April 2026, BCLP raised a query about how the Defendant proposed to deal with the 2024 Underleases and the charges over them.

89. On 27 April 2026, Mr Harbour of Kingsley Napley wrote to BCLP with two options. Either the 2024 Underleases could be surrendered and fresh leases granted, or they could be assigned to Mr Aadinatha.

90. On 5 May 2026, PCB Byrne, the Defendant’s litigation solicitors, wrote to BCLP saying that the Defendant was willing to grant Mr Aadinatha more time to complete personally, but that if he did not complete by 8 May 2026, the Defendant would be willing only to complete with the Claimants.

91. BCLP responded on 7 May 2026 saying that Mr Aadinatha was only willing to complete on the basis of deduction of late completion compensation, and completion did not take place on 8 May 2026.

92. BCLP then asserted that the Defendant was obliged to procure the grant of underleases to Mr Aadinatha personally, suggesting there was an estoppel. However, at the Consequentials Hearing, that contention was not pursued by the Claimants, who accepted that they had no right to require completion except in their own names. The position of the parties

93. At the Consequentials Hearing, the Claimants’ position in opening was that if the Defendant insisted on completion by the Claimants rather than Mr Aadinatha, the Claimants would insist on completion by the surrender of the 2024 Underleases and the grant of new underleases by Eros Services to the Claimants. If, however, the Defendant agreed to completion by Mr Aadinatha, the Claimants would agree that completion could take place by the assignment of the 2024 Underleases. I asked what the difference was in practice, apart from the fact that no rent was payable under the 2024 Underleases? Ms Wicks KC for the Claimants replied: “It isn't really a question of what difference it makes in practice; it’s a question of if the Defendant is going to be bloody-minded, then so are the Claimants”.

94. Mr Seitler for the Defendant responded that the Defendant insisted on completion by the Claimants, because it thought the Claimants could not raise the money to complete, whereas Mr Aadinatha could. The Defendant does not want completion to take place, because then it can forfeit the Deposit and Stage Payments. Mr Seitler submitted that Contracts, correctly interpreted, allowed the Defendant to complete by procuring the assignment of the 2024 Underleases to the Claimants. I suggested that perhaps the Court could order completion by the assignment of the 2024 Underleases even if that is not provided for in the Contracts, on the basis of the same power that allows the Court to order specific performance with abatement of the purchase price if there is a misdescription. Mr Seitler adopted that suggestion, but did not elaborate on it.

95. In reply, Ms Wicks submitted that the Contracts required the grant of a new lease rather than the assignment of an existing lease. She said that the Court has no power to order completion by assignment of the 2024 Underleases unless that is what the Contracts permitted. The position in the case of misdescription is different, because there the seller cannot convey what they have contracted to convey. Here, the Defendant can do what it agreed to do; it would just prefer not to. Discussion

96. I suspect that the Court does have power, when making an order for specific performance, to direct that completion takes place in a way different from that provided for in the contract if it is in the interests of justice to do so, even if the seller can perform the contract to the letter. However, given the way the points were argued, I think it would be wrong in this case to make an order for completion by the assignment of the 2024 Underleases unless the Contracts permit the Defendant to complete in that way. Although Mr Seitler adopted my suggestion that the Court might have power to direct completion in a way different to that provided for in the Contracts, he did not develop the point or cite any authorities on it, and Ms Wicks had no opportunity to properly deal with the point.

97. The point therefore turns on the correct interpretation of the Contracts. The Contracts define “Lease” as meaning “the lease of the Flat to be granted by the Seller to the Buyer in the form of the draft lease attached at Appendix 1 with such amendments as the Seller may from time to time reasonably require”. The following provisions are relevant: “1.10 (Subject to the provisions of clause 6.7 ) references to “Seller” include successors in title and any other person who is or becomes entitled to the reversion (whether immediate or not) expectant on the term to be created by the Lease… There is no clause 6.7 2.1 The Seller will sell, and the Buyer will buy, the Flat. 2.2 The interest to be sold is the Lease with vacant possession on Completion. 2.3 The Buyer cannot require the Seller to grant the Lease to any person other than the Buyer…. 15.1 The Grant of the Lease and Completion 15.1.1 Completion is to take place on the Completion Date and the Seller will grant and the Buyer will accept the grant of the Lease on the Completion Date and (if required) the Buyer shall enter into the Hotel Operator Disclaimer…. 15.1.4 The Seller will procure that the Seller’s Solicitors prepare the engrossments of the original and the counterpart of the Lease and (if required) a signing copy of the Hotel Operator Disclaimer and send the relevant documents to the Buyer or the Buyer’s Solicitors no less than five Working Days before the Completion Date. 15.1.5 The Buyer will promptly execute the counterpart of the Lease and (if required) the Hotel Operator Disclaimer preparatory to the grant of the Lease…. 15.2 Terms of the Lease 15.2.1 The rent, additional rent, term of years, covenants, provisions, conditions and other matters to be granted by and incorporated in the Lease of the Flat is that set out in the form of draft Lease annexed to this Agreement as Appendix 1. 15.2.2 The Seller reserves the right to make such changes to the Lease and the lease plan as it considers appropriate (acting reasonably) and to substitute a new lessor for that shown in the draft annexed hereto (subject to such lessor being entitled to the reversion immediately expectant upon the Lease).”

98. In my judgment, the Contracts unambiguously provide for the grant of a new lease, not the assignment of an existing lease. The Defendant submitted that the obligation in clause 15.1.1 to “grant” the Lease can be read as simply providing for the administrative mechanism for completion, and not in any way detracting from the basic commercial promise in clause 2. Provided that commercial promise is fulfilled, the Contract has "completed" regardless of the precise mechanism used to achieve it.

99. It is true that clause 15.1.1 provides contractual machinery by which the obligation in clause 2 is to be fulfilled. If it was impossible for that machinery to be operated the Court would undoubtedly grant specific performance by requiring the assignment of the 2024 Underleases. But it is not impossible for the Defendant to comply with clause 15.1.1, and just because it will be somewhat more inconvenient and expensive for it to do so, that does not justify reading the Contracts as giving the Defendant the right to complete in a way different to that provided for in clause 15.1.1.

100. The Defendant also argued that the words "or assign" could be read by implication into clause 15.1.1 after "will grant" because that was obvious. It argued that if an officious bystander at the time of the Contracts had asked the parties whether, if by the time for completion the Defendant had, for financing purposes, granted leases of the individual flats on the same terms as the Leases, it would have been acceptable to complete by way of assignment of those leases, they would have been testily suppressed with an 'Oh, of course!". They cited Marks and Spencer plc v BNP Paribas Securities Trust Company (Jersey) Limited [2015] UKSC 72 , [2016] AC 742 , at §16.

101. For a term to be implied on this basis it must be so obvious as to go without saying: see Marks and Spencer at §16 and §23. Further, at §21, Lord Neuberger said he thought it would be rare for a term to be implied on the basis it was so obvious as to go without saying unless it was also necessary to give business efficacy to the contract - if, without the term, the contract would lack commercial or practical coherence.

102. I do not think the suggested implied term is so obvious as to go without saying. I do not think that it is obvious that the obligation to grant the Lease is to be read as offering as an alternative procuring the assignment of an existing lease, which might raise different considerations, depending on the circumstances.

103. Accordingly, I determine that the completion is to take place by the Defendant procuring the surrender of the 2024 Underleases and the grant of new leases to the Claimants. What orders as to costs should be made in respect of the period up to 17 April 2026, the date of the Main Judgment? The Defendant’s primary submission

104. The Defendant’s primary submission was that the order as to the costs of the claim up to 17 April 2026 should be contingent on whether completion takes place. This was because if the Claimants fail to complete, this litigation will have been a waste of time and money.

105. I reject that submission. The costs of the claim were incurred because the Defendant contended that it had validly terminated the Contracts, and that in any event the Claimants were not entitled to specific performance. I held that the Contracts had not been terminated and that the Claimants were entitled to specific performance. Even if ultimately the Claimants are unable to raise the money to complete the purchase, overall the Claimants were undoubtedly the successful party and are entitled to an order for the payment of their costs up to the Main Judgment. The Defendant’s alternative submission and the Claimants’ position

106. The Defendant’s alternative submission was that I should make an order which reflects the fact that, although the Claimants were overall the successful party, they failed on some issues, and therefore I should order that the Defendant pays 60% of the Claimants’ costs.

107. The Claimants’ position was that the Defendant should pay all the Claimants' costs, or that if there was to be a discount, it should be a very low one. The principles which apply where the overall successful party has lost on one or more issues

108. CPR r.44.2(2) provides that if the court decides to make an order about costs, the general rule is that the unsuccessful party will be ordered to pay the costs of the successful party; but the court may make a different order.

109. The first question is therefore who is the “successful party”. Here, there is no doubt about that – it is the Claimants.

110. CPR r.44.2(4) then directs that, in deciding what order (if any) to make about costs, the court will have regard to all the circumstances, including the conduct of all the parties and whether a party has “succeeded on part of its case, even if that party has not been wholly successful”.

111. CPR r.44.2(5) says that the conduct of the parties includes “whether it was reasonable for a party to raise, pursue or contest a particular allegation or issue” and “the manner in which a party has pursued or defended its case or a particular allegation or issue”.

112. CPR r.44.2(6) sets out a range of different orders that the court can make: “(a) a proportion of another party's costs; (b) a stated amount in respect of another party's costs; (c) costs from or until a certain date only; (d) costs incurred before proceedings have begun; (e) costs relating to particular steps taken in the proceedings; (f) costs relating only to a distinct part of the proceedings; and (g) interest on costs from or until a certain date, including a date before judgment.”

113. CPR r.44.2(7) then says that before the court considers making an order under para (f) – costs relating only to a distinct part of the proceedings, it will consider whether it is practicable to make an order under para (a) – a proportion of the costs or (c) – costs from or until a certain date only.

114. There have been numerous cases where judges have commented on the circumstances in which it is appropriate to depart from the general rule to reflect the fact that the overall successful party has not won on all the issues. In Pigot v Environment Agency [2020] EWHC 1444 (Ch) , [2020] Costs LR 825 at §6, I set out my understanding of the principles to be derived from those cases as follows: “(1) The mere fact that the successful party was not successful on every issue does not, of itself, justify an issue-based cost order. In any litigation, there are likely to be issues which involve reviewing the same, or overlapping, sets of facts, and where it is therefore difficult to disentangle the costs of one issue from another. The mere fact that the successful party has lost on one or more issues does not by itself normally make it appropriate to deprive them of their costs. (2) Such an order may be appropriate if there is a discrete or distinct issue, the raising of which caused additional costs to be incurred. Such an order may also be appropriate if the overall costs were materially increased by the unreasonable raising of one or more issues on which the successful party failed. (3) Where there is a discrete issue which caused additional costs to be incurred, if the issue was raised reasonably, the successful party is likely to be deprived of its costs of the issue. If the issue was raised unreasonably, the successful party is likely also to be ordered to pay the costs of the issue incurred by the unsuccessful party. An issue may be treated as having been raised unreasonably if it is hopeless and ought never to have been pursued. (4) Where an issue based costs order is appropriate, the court should attempt to reflect it by ordering payment of a proportion of the receiving party's costs if that is practicable. (5) An issue based costs order should reflect the extent to which the costs were increased by the raising of the issue; costs which would have been incurred even if the issue had not been raised should be paid by the unsuccessful party. (6) Before making an issue-based costs order, it is important to stand back and ask whether, applying the principles set out in CPR rule 44.2 , it is in all the circumstances of the case the right result. The aim must always be to make an order that reflects the overall justice of the case."

115. I should make it clear that by “issue-based costs order”, I meant an order for costs which departed from the general rule because the successful party lost one or more issues, whatever the form of that order.

116. My summary in Pigot has been cited a number of times by High Court Judges and Deputy High Court Judges as correctly summarising the applicable principles. See e.g . Scales v Motor Insurers' Bureau [2020] EWHC 1749 (QB) (Cavanagh J) at §10; AB v The University of XYZ [2020] EWHC 2980 (QB) (Hugh Southey QC) at §7; Mathieu v Hinds [2022] EWHC 1624 (QB) (Hills J) at §15; Montres Breguet SA v Samsung Electronics Co Ltd [2022] EWHC 1895 (Ch) (Falk J); Galapagos Bidco Sarl v Kebekus [2023] EWHC 2348 (Ch) at §17 (Trower J); and Merricks v Mastercard [2024] CAT 57 (Roth J) at §20.

117. In South Tees Development Corporation v PD Teesport Limited [2024] EWHC 842 (Ch) (Rajah J) at §8, Rajah J quoted the summary and then made two comments on it: “9. I should make a couple of points about this passage. These are not rules which are being set out here by the learned Deputy High Court Judge but a summary, or compilation, of guidance derived from the authorities. I would add to that summary that whether or not an issue-based approach is justified is not a purely mechanistic exercise which turns upon whether a discrete issue can be identified which has given rise to additional costs. Also relevant is whether that issue is simply another basis or another argument for putting the principal claim or is one which would not have been litigated if the unsuccessful party had conceded the issue on which the successful party had won….

10. It is also relevant as to how reasonable it was for the successful party to take the failed point, bearing in mind, amongst other things, the extra costs associated with it. The failure to win on every issue that is argued at trial is a less fundamental failure than the failure to make an offer to meet the winner's true entitlement”. I respectfully agree with those observations.

118. In Vainker v Marbank Construction Ltd [2024] EWHC 1686 (TCC) (Jefford J) at §26, Jefford J said, after quoting the summary: “In my view, paragraph (3) is slightly overstated, but it may be that it is moderated by sub-paragraph (6) and the exhortation to stand back and consider the justice of the case. I say that it is slightly overstated because there may be many cases where a party is deprived of its costs on an issue on which it was unsuccessful and which can be regarded as a discrete issue, but it is a matter of discretion, and to say that a party may be deprived of its costs, rather than is likely to be deprived of its costs, is a principle of more general application.” I also respectfully agree with that comment.

119. Mr Seitler submitted that the Pigot summary was erroneous in two respects. The first was that it did not give enough weight to the desirability of making orders as to costs which reflect the successful party’s failure to succeed on some issues. He said that such an order should be made so far as it reasonably can be.

120. In support of that submission, he referred to SmithKlineBeecham Plc v Apotex Europe Ltd (No.2) [2004] EWCA Civ 1703 ; [2005] FSR 24 and DSM v Mara [2025] EWHC 1514 (Pat) .

121. SmithKlineBeecham was a patent action where the claimant claimed its patent was infringed. The defendant said the patent was invalid but that if it was valid, it had not been infringed. Pumfrey J held that the patent was invalid but, if valid, had not been infringed. The Court of Appeal agreed that the patent had not been infringed, but held it was valid. Those decisions were reached by what Jacob LJ called “a decision on a host of issues and sub-issues”. The costs issues were affected by two statutory provisions which provided for specific costs orders in patent actions – sections 63 and 65 of the Patents Act 1977 . Both parties contended that they should receive a percentage of their costs at first instance and on appeal – the debate was not about whether there should be an order that reflected success on different issues, but about the degrees of success and the correct way of reflecting the outcome.

122. On the general principles Jacob LJ said: “24. In respect of all intellectual property matters the general rule is that the CPR and associated practice directions apply, unless a rule in Pt 63 or its practice direction provides otherwise (CPR 63.2). There is no such rule. So, subject to the two statutory provisions discussed above, the general rules apply as much to patent actions as to any other action.

25. It follows that all the factors and matters set forth in CPR 44.3 apply to how the court should exercise its discretion as to costs. Prior to the CPR a party who was successful overall was not normally deprived of its costs of an issue it took unsuccessfully unless it has done so unreasonably, see Re Elgindata (No. 2) [1992] 1 WLR 1207 . But since the CPR a more issue-by-issue approach is appropriate, see Summit Property v Pitmans [2001] EWCA Civ 2020 , applied in a patent action, Stena v Irish Ferries [2003] EWCA Civ 214 . Even before the CPR an issue-by-issue approach was, as an exception to the Elgindata approach, applied in patent actions because of the “large number of issues and the very extensive costs that can be incurred” per Aldous LJ in Rediffusion v Singer Link [1993] FSR 369 at 410.

26. An issue-by-issue approach is therefore one that should be applied so far as it reasonably can. On the other hand such an approach is not the be-all and end-all. Whether or not “it was reasonable for a party to raise, pursue or contest a particular allegation” remains a relevant factor to be taken into account as part of the conduct of the parties (see CPR 44(3)(a) and (5)(b)”. The Impossibility of Great Precision

27. Before turning to this particular case I should say something about this. Although an issue-by-issue approach is likely to produce a “fairer” answer and is likely to make parties consider carefully before advancing or disputing a particular issue, it should not be thought that it is capable of achieving a “precise” answer. The estimation of costs, like that of valuation of property, is more of an art than a science. True it is that one can measure certain things (such as pages of witness statements or transcript devoted to a particular issue), but they can only be indicia to be taken into account. It would be dangerous to rely upon them as absolutes. Indeed, the brevity of a document, or a cross-examination, may be the result of great care: was it Hazlitt who apologised for the length of a letter, excusing himself on the grounds that he had not enough time to compose it?

28. It follows that there is no “precise” figure of costs which, in theory, with perfect measurement tools, one could reach. The best that can be achieved is an estimate which is necessarily going to be somewhat crude …”.

123. In DSM v Mara , Mellor J said at §20, after quoting from my judgment in Pigot with apparent approval: “The final point to note is Jacob LJ’s reminder in SmithKlineBeecham Plc v Apotex Europe Ltd (No.2) [2005] FSR 24 that ‘although an issue-by-issue approach is likely to produce a ‘fairer’ answer and is likely to make parties consider carefully before advancing or disputing a particular issue, it should not be thought that it is capable of achieving a ‘precise’ answer.’ And ‘The best that can be achieved is an estimate which is necessarily going to be somewhat crude.’ Underpinning this is the notion that the process of estimation will work both ways, perhaps favouring one party slightly on one point and the other party on others, which is why it is necessary to stand back and ask oneself whether the analysis has produced the right result and reflects the overall justice of the case”.

124. SmithKlineBeecham was a case where the parties were agreed that an issue-based approach to costs should be adopted, and where there were distinct issues making such an approach appropriate. In that context, Jacob LJ’s statement that “an issue-by-issue approach is therefore one that should be applied so far as it reasonably can” was understandable.

125. However, I do not think it is right to say that, as a general principle, an issue by issue approach is one that should be applied so far as it reasonably can. There are other authorities which I referred to in Pigot which make it clear that an issue-based order is often not appropriate. For example, in Fox v Foundation Piling Ltd [2011] EWCA Civ 790 , Jackson LJ, with whom the other members of the Court of Appeal agreed, said at §62 that there had been “a growing and unwelcome tendency by first instance courts and, dare I say it, this court as well to depart from the starting point set out in rule 44.3 (2) (a) [now r.44.2(2)] too far and too often. Such an approach may strive for perfect justice in the individual case, but at huge additional cost to the parties and at huge costs to other litigants because of the uncertainty which such an approach generates.”

126. A further important decision, which I did not refer to in Pigot , is the decision of the Court of Appeal in Webb v Liverpool Women’s NHS Foundation Trust [2016] 1 WLR 3899 , where the Court held that the trial judge had been wrong in failing to award the claimant the whole of the costs of the claim.

127. In that case, the claimant suffered injuries at birth. She sued the NHS Trust, making two distinct allegations of negligence. The first was that the Trust had been negligent in failing to perform a caesarean section. She succeeded on that. The second was that the Trust had managed the vaginal delivery inappropriately. She failed on that. The trial judge held that, as she had failed on the second allegation, she should not recover the fees of her midwifery expert, whose evidence was confined to the second allegation. He also held that she should not recover 25% of her solicitor’s time-based costs, which was his estimate of the proportion attributable to the second allegation.

128. Sir Stanley Burnton (with whom the other members of the Court agreed) held that the judge could not properly have deprived the claimant of her costs in respect of the second allegation: see his judgment at §§24-29. He said that the claimant had been reasonable in making and pursuing the second allegation, which was supported by expert evidence. He then said: “27. It is not unusual for a claimant to succeed on some, but not all, allegations, particularly in a personal injury case such as the present. In HLB Kidsons v Lloyd's Underwriters [2008] 3 Costs LR 427, para 11 Gloster J said: “There is no automatic rule requiring reduction of a successful party's costs if he loses on one or more issues. In any litigation, especially complex litigation such as the present case, any winning party is likely to fail on one or more issues in the case. As Simon Brown LJ said in Budgen v Andrew Gardner Partnership [2002] EWCA Civ 1125 at [35]: ‘the court can properly have regard to the fact that in almost every case even the winner is likely to fail on some issues.’ Likewise in Travellers' Casualty [2006] EWHC 2885 (Comm) , Clarke J said. at para 12: ‘If the successful claimant has lost out on a number of issues it may be inappropriate to make separate orders for costs in respect of issues upon which he has failed, unless the points were unreasonably taken. It is a fortunate litigant who wins on every point.’”

28. In Fox v Foundation Piling Ltd [2011] 6 Costs LR 961 , para 48 Jackson LJ said, in a judgment with which the other members of the court agreed: “In a personal injury action the fact that the claimant has won on some issues and lost on other issues along the way is not normally a reason for depriving the claimant of part of his costs: see Goodwin v Bennett UK Ltd [2008] EWCA Civ 1658 . For example, the claimant may succeed on some of the pleaded particulars of negligence, but not on others. Indeed the fact that the claimant has deliberately exaggerated his claim may in certain instances not be a good reason for depriving him of part of his costs: see Morgan v UPS [2008] EWCA Civ 1476 .”

29. I see nothing in this case to take it out of the ordinary or to justify the claimant being deprived of part of her costs.”

129. To justify an issue-based order, where the issues have been raised, pursued or contested reasonably, I consider that there should usually be what Arnold J in Hospira at §2 referred to as a “suitably circumscribed” issue – what r.44.2(6) calls “a distinct part of the proceedings”. In Getty Images (US) Inc v Stability AI [2025] EWHC 3419 (Ch) at §23, Joanna Smith J said: “… an issue for these purposes may be considered at any level of granularity as long as it is suitably circumscribed. Any significant degree of overlap with other issues would appear to take an issue out of this category.”

130. I therefore think that Jacob LJ’s statement in SmithKlineBeecham that: “An issue-by-issue approach is therefore one that should be applied so far as it reasonably can” , should be read as applying only where there is one or more suitably circumscribed issue. That can be reconciled with the decision of the Court of Appeal in Webb on the basis that the second allegation of negligence in Webb was not to be regarded as a suitably circumscribed issue – it was simply another way of supporting the claim for damages for the defendant’s negligence.

131. The second error which Mr Seitler identified in the Pigot summary was the correct approach where an issue-by-issue approach is adopted. He submitted that where an issue by issue approach is adopted, the overall successful party should be ordered to pay the costs of the overall unsuccessful party in respect of that issue, without any requirement that the issue was raised unreasonably.

132. In support, Mr Seitler referred me to Active Media Services Inc v Burmester, Duncker & Joly GMBH & Co KG [2021] EWHC 352 (Comm) at §6: “The willingness of the Court to order a party, even a successful party, to be deprived of his costs of a particular issue on which he has lost, and to pay those of his opponent, is not however dependent on establishing that that party has acted improperly or unreasonably: Summit Property Ltd v Pitmans [2001] EWCA Civ 2020 . If a party has acted improperly or unreasonably the Court will more readily make such an order. But, even if he has not, the Courts are now much more ready to make separate orders reflecting success on different issues than once they were.”

133. That is, of course, true. But what Calver J did not mention (because it was not relevant to the case he was dealing with) is that in Summit Property v Pitmans [2001] EWCA Civ 2020 at §17, Longmore LJ said: “It is thus a matter of ordinary common sense that if it is appropriate to consider costs on an issue basis at all, it may be appropriate, in a suitably exceptional case, to make an order which not only deprives a successful party of his costs of a particular issue but also an order which requires him to pay the otherwise unsuccessful party's costs of that issue, without it being necessary for the court to decide that allegations have been made improperly or unreasonably.”

134. The ordinary meaning of “exceptional” as in “exceptional case” or “exceptional circumstances” was explained by Lord Bingham CJ in R v Kelly [2000] QB 198 at 209, It is “… an ordinary, familiar English adjective” not a term of art. “It describes a circumstance which is such as to form an exception, which is out of the ordinary course, or unusual, or special, or uncommon. To be exceptional a circumstance need not be unique, or unprecedented, or very rare; but it cannot be one that is regularly, or routinely, or normally encountered.”

135. I think that is what Longmore LJ meant – there must be something out of the ordinary which makes it appropriate to order the overall successful party to pay the costs of the unsuccessful party in respect of a particular issue or issues. That is supported, I think, by the comment made by Arnold J in Hospira UK v Novartis AG : “… Longmore LJ was not intending when using the words "suitably exceptional" in the particular circumstances in which he did to impose a specific requirement of exceptionality. The question rather is one of whether it is appropriate in all the circumstances of the individual case not merely to deprive the winning party of its costs on an issue in relation to which it has lost, but also to require it to pay the other side's costs.” To the same effect, in Unwired Planet International v Huawei Technologies Co [2016] EWHC 410 (Pat) at §8, Birss J said: “The test today is whether it is appropriate, in all the circumstances in an individual case, to make whichever order one is thinking about. The test is appropriateness, not exceptionality.”

136. In the present case, the costs of the litigation were incurred because the Defendant refused to complete the sales of the Flats on 4 September 2023, because it wrongly contended that valid notices to complete had been served and had expired and it was therefore entitled to terminate the contracts. None of the issues would have been raised and contested but for that. In a case like this, it seems to me that it is only appropriate for the successful party to be ordered to pay the unsuccessful party’s costs of an issue where there is some reason which means that it is appropriate to make such an order, apart from the mere fact that the successful party has lost on the issue. One such reason is that the successful party acted unreasonably in raising or contesting the issue; there may be others. But if all that has happened is that the successful party has lost an issue which it raised or contested reasonably, that is insufficient by itself to justify ordering the successful party to pay the unsuccessful party’s costs of the issue. There must be something more.

137. That was the approach of Nugee J in R (Viridor Waste Management Ltd) v Revenue and Customs Commissioners [2016] EWHC 2502 (Admin) , one of the cases which I relied on to prepare my summary in Pigot. In that case, HMRC were the successful party, having defeated the taxpayer’s judicial review claim. However, HMRC lost on one discrete issue – what Nugee J called the “cards face up on the table issue”. HMRC had made serious allegations that the taxpayer had been guilty of a lack of candour in providing details of a transaction, and Nugee J rejected those allegations as being without substance. He held that the cards face up issue was not just an issue that HMRC lost along the way—it was a distinct issue that HMRC initiated and chose to pursue and which inevitably involved a wider inquiry into the facts than would otherwise have been necessary. Therefore it justified an adjustment to the costs order, by depriving HMRC of their costs of that issue. But it did not justify ordering HMRC to pay the taxpayer’s costs of the issue, because HMRC did not act unreasonably in raising the issue.

138. That, I think, encapsulates the correct approach unless there is some particular aspect of a case justifying a different approach.

139. Mr Seitler also cited the judgment of Nicholas Caddick KC, sitting as a Deputy High Court Judge, in Coloplast A/S v Salts Healthcare Ltd [2021] EWHC 107 (Pat) , a judgment on costs in a patent action, where Mr Caddick KC found that the claimant’s patent was invalid. After quoting the Pigot summary, Mr Caddick KC said at §5: “I found that passage from Pigot to be a helpful summary. However, I would make the following additional points: a. The approach to issue-based costs orders in patent litigation does not differ from the approach in other types of litigation (see Hospira UK Ltd v Cubist Pharmaceuticals, LLC [2016] 5 Costs LR 1011, per Henry Carr J. at [9]). However, patent cases lend themselves to issue-based costs orders because they often involve a large number of issues and a party can (as in the present case) lose on a number of issues but still be the overall winner. See SmithKline Beecham Plc v Apotex Europe Limited [2004] EWCA Civ 1703 , per Jacob LJ at [25]-[26]. Further, as Henry Carr J said in Cubist at [9]: “Patent litigation is very expensive, and it is important that parties should be encouraged only to pursue their best points, and to be aware of the cost implications of failing to do so.” A similar point was made by Birss J in Unwired Planet International Limited v Huawei Technologies Co. Limited [2016] EWHC 410 (Pat) at [13] although Birss J went on, (at [18]), to note that courts must be careful because: “If the court unduly penalises a party for dropping issues before trial, that may encourage parties to continue to run up issues all the way to trial, which will in turn increase the costs even further.” b. What constitutes a discrete or distinct issue (or, as it is often called in patent cases, a “suitably circumscribed” issue) will vary from case to case. In the patent context, it may involve the consideration of an individual piece of prior art but may equally be an issue arising within a broader issue, such as an issue as regards experiments arising in relation to the broader issue of infringement. See Unwired Planet at [6]. c. Where the overall winner has lost on a discrete issue, it is likely to be deprived of its costs of that issue even if it acted reasonably. However, that is not inevitable. It must still be appropriate to make such an order. d. Where the overall winner has lost on a discrete issue, it may also be ordered to pay the losing party’s costs of that issue. As appears from Pigot , such an order is likely to be made where the overall winner had acted unreasonably in relation to that issue. However, such an order can be made even where the overall winner had not acted unreasonably. It has been said that to make such an order requires “suitably exceptional” circumstances. However, in reality, the test is simply whether it would be appropriate and just in all the circumstances to make such an order. It is not intended that such orders should be extremely rare. See Unwired Planet at [6]-[8] and Cubist at [6]-[10]. e. Where an issue-based costs order is appropriate, the proportion of the winning party’s costs to be paid is often expressed in terms of a percentage of its total costs. This percentage reflects the deduction necessary to reflect the winning party’s costs in relation to an issue on which it lost and also, where appropriate, the losing party’s costs in relation to that issue. Such percentages orders “can usually be made in patent cases and should be made if they can be”. See Unwired Planet at [10]. f. In determining the level of reduction, the court is not expected to undertake a detailed assessment. Indeed, it is unlikely to have the benefit of a detailed bill of costs. See Cubist at [3]-[4]. In this regard, Pumfrey J in Monsanto Technology LLC v Cargill International SA [2008] FSR 417 at [5] commented that: “This brings me to the next problem confronting the judge who has to make an order for costs of the kind the parties want in this case. That problem is the doubts which their respective solicitors entertain as to the accuracy of the other side’s estimate of the costs expended on the client’s behalf upon the various issues …. I wish it to be clearly understood that parties cannot have it both ways. Either the case goes to detailed assessment, in which case issues of this description will fall by the wayside, or it is dealt with by the trial judge, who cannot resolve them. If the parties wish to take advantage of the benefits flowing from a comparatively rough-and-ready assessment by the judge, they cannot expect a detailed assessment of the correctness of each of the sums which they specify. This is a matter for the parties and not for the court. If neither seeks a detailed assessment, then the court will do its best with the material which is made available, and can only adjust figures deposed to by the solicitors concerned if there is a really good reason for doing so.” Birss J, having quoted that passage in Unwired Planet (at [11]), went on (at [12]) to conclude that: “In my judgment what the learned judge there said about the comparatively rough and ready assessment which these percentage orders represent remains true. It cannot be overemphasised that this exercise is very approximate.”

140. Mr Seitler relied particularly on what Mr Caddick said there in paragraph (d). I do not think that supports his submission. Rather, I read that paragraph as meaning that there needs to be something on top of the mere fact that the unsuccessful party overall won on a particular issue to make it appropriate to order that the successful party pays the costs of the unsuccessful party in respect of that issue.

141. In the light of the above, I summarise the principles which I consider that I should apply here as follows emphasising that these are not rules, but a summary, or compilation, of guidance derived from the authorities, and bearing in mind that whether or not an issue-based approach is justified is not a purely mechanistic exercise which turns upon whether a discrete issue can be identified which has given rise to additional costs: (1) The mere fact that the successful party was not successful on every issue does not, of itself, justify an issue-based cost order. In any litigation, there are likely to be issues which involve reviewing the same, or overlapping, sets of facts, and where it is therefore difficult to disentangle the costs of one issue from another. The mere fact that the successful party has lost on one or more issues does not by itself normally make it appropriate to deprive them of their costs. (2) Such an order is likely to be appropriate if there is a suitably circumscribed issue i.e. a discrete or distinct issue, which can be regarded as a distinct part of the proceedings, the raising of which caused additional costs to be incurred. An issue is likely to be treated as suitably circumscribed where there is not a significant degree of overlap with other issues. Such an order may also be appropriate if the overall costs were materially increased by the unreasonable raising of one or more issues on which the successful party failed. (3) Where there is a suitably circumscribed issue, if the issue was raised or contested reasonably, the successful party may be deprived of its costs of the issue. However, that is not inevitable. It must still be appropriate to make such an order. The Court should bear in mind that an issue-by-issue approach is likely to produce a fairer answer and is likely to make parties consider carefully before advancing or disputing a particular issue. However, the Court should also consider whether the issue is simply another basis or another argument for putting the principal claim or defence or is one which would not have been litigated if the unsuccessful party had conceded the issue on which the successful party had won. It is also relevant as to how reasonable it was for the successful party to take the failed point, bearing in mind, amongst other things, the extra costs associated with it. The failure to win on every issue that is argued at trial is a less fundamental failure than the failure to make an offer to meet the winner's true entitlement. (4) If the issue was raised unreasonably, the successful party may also be ordered to pay the costs of the issue incurred by the unsuccessful party. An issue may be treated as having been raised unreasonably if it is hopeless and ought never to have been pursued. There may also be other circumstances which make it appropriate for the successful party to be ordered to pay the costs of the issue incurred by the unsuccessful party. However, the simple fact that the successful party lost on an issue raised in the course of pursuing or defending the claim which the successful party won will not usually, by itself, be enough to make it appropriate to order them to pay the unsuccessful party’s costs of the issue. (5) Where an issue based costs order is appropriate, the court should attempt to reflect it by ordering payment of a proportion of the receiving party's costs if that is practicable, bearing in mind that this is necessarily a very approximate and rough and ready exercise. The percentage reduction in the successful party’s costs will aim to reflect the deduction necessary to reflect the successful party’s costs in relation to an issue on which it lost and also, where appropriate, the unsuccessful party’s costs in relation to that issue. (6) An issue-based costs order should reflect the extent to which the costs were increased by the raising of the issue; costs which would have been incurred even if the issue had not been raised should be paid by the unsuccessful party. (7) Before making an issue-based costs order, it is important to stand back and ask whether, applying the principles set out in CPR rule 44.2, it is in all the circumstances of the case the right result. The aim must always be to make an order that reflects the overall justice of the case. The position here

142. I summarised the issues in the claim and my conclusions on them in the Main Judgment at §212. In addition, there was a counterclaim by the Defendant for damages which was abandoned shortly before the trial, and a claim by the Claimants that an inaccurate completion statement provided by the Defendant invalidated the Completion Notice, which was abandoned at the start of the trial.

143. The issues the Defendant succeeded on were: (a) Whether the Completion Notices were invalid because no Certificate of Insurance was provided to the Claimants before the Completion Notices were served. This turned on the interpretation of the Contracts and a few documents. (b) Whether the Defendant’s obligation in respect of the Furniture Package was to install it rather than merely to supply it. This turned on the interpretation of the Contracts. (c) Whether the admitted inaccuracy in completion statements affected the validity of the Completion Notices. This was a point of law. (d) Whether the right to forfeit the Deposit and Stage Payments was a penalty. This turned on one paragraph in a witness statement, on which there was no cross-examination, and submissions. (e) Whether, if I had held that the Defendant was entitled to terminate the Contracts, it would have been right to order repayment of the Deposit or the Stage Payments under s.49(2) of the Law of Property Act 1925 or by way of granting relief against forfeiture. This turned on the evidence of two of the Claimants’ witnesses and an assessment of various factors.

144. In my judgment, the Defendant’s success on those issues does not justify a departure from the default position that the successful party is entitled to an order for their costs.

145. The first four of them were essentially short points of law, which it was reasonable for the Claimants to raise, and which added little to the overall costs of the claim, and I do not consider that they were suitably circumscribed issues.

146. As to the fifth issue, that did involve investigating facts and reviewing a number of documents and took some time at the trial. However, given the counterclaim, I do not think that the costs would have been substantially lower if the repayment claim had not been made. Much of the evidence relevant to the repayment claim was also relevant to the abandoned counterclaim. For that reason, I do not consider that this was a suitably circumscribed issue – it was not a discrete issue which caused discrete costs to be incurred; not a distinct part of the proceedings, except at the trial itself, by which time the counterclaim had been abandoned. The Claimants acted reasonably in making the repayment claim – I think that any contracting purchaser in their position would have made such a claim when faced with a wrongful claim by the seller that the sale contract had been terminated. Further, my decision on the repayment claim had no bearing on the relief to which the Claimants are entitled. I thought it right in the Main Judgment to say what my assessment was of the repayment claim in case there was a successful appeal on my decision to order specific performance. But it had no relevance to the outcome of the case. So one cannot say that the Claimants failed on part of their case – only that if the Claimants had lost on their claim for specific performance, they would then not have succeeded in their claim for repayment.

147. Considering the position in the round, I consider that this is a case where I should apply the principle that the mere fact that the successful party was not successful on every issue does not, of itself, justify an issue-based cost order. The justice of this case seems to me to require that the Defendant pays the Claimants’ costs, with no discount, and I will so order. Interest on costs

148. CPR r.44.2(6)(g) provides that the Court may make an order that a party must pay interest on costs from or until a certain date, including a date before judgment. This is an order routinely made: see Civil Procedure 2026 §36.17.3 and I consider that it is appropriate here.

149. The Claimants asked for interest at 4% over base, based on the rate of interest at which Access Bank was willing to lend money to fund the purchase on the security of registered charges over the Flats. The Defendant’s only objection to this rate was that this it was based on the rate at which the bank was willing to lend to Mr Aadinatha personally. I do not think that is a valid reason to reject that rate. The rate of interest which offshore shell companies can borrow at is likely to be the same as the rate which their beneficial owner can borrow at. So I will order interest at that rate.

150. I will order that the Defendant is to pay to the Claimants interest on the costs which it is agreed or determined are payable. The interest is to be calculated on each tranche of costs paid by the Claimants to their solicitors from the date each such tranche was so paid at the rate of 4% per annum above Bank of England base rate from time to time until 4 months after the date of the order, and at the Judgments Act 1838 rate thereafter. Any dispute as to the amount payable is to be determined by the costs judge at the same time as the detailed assessment. Payment on account of costs

151. CPR r.44.2(8) says: “Where the court orders a party to pay costs subject to detailed assessment, it will order that party to pay a reasonable sum on account of costs, unless there is good reason not to do so.”

152. The Defendant accepts that I should make such an order here; the issue is the amount. There is no costs budget – it seems that the parties agreed that the value of the claim was such that no costs budgets were required. The Claimants have incurred costs of £1,676,915 and seek a payment on account of £950,000. The Defendant says this is excessive and proposes £400,000.

153. If a costs budget for the Defendant had been approved by the Court in this case, I very much doubt it would exceed something in the order of £400,000 to £450,000. Mr Chew said that this was not a relevant question, because the Claimants had incurred costs far above those that could have been reasonably anticipated due to the Defendant’s repeated failures to make proper disclosure. That may be right – if so, then any challenge to the Claimants’ costs will be rejected by the costs judge. But at this stage, I need to be cautious, especially bearing in mind that the Claimants are shell companies, and minimise the risk that the payment on account may exceed the amount to which the Claimants are entitled.

154. I consider that a payment on account of £450,000 should be made by the Defendant in respect of the costs up to 17 April 2026, subject to any adjustment needed to reflect my order as to the costs of the Consequentials Hearing, which I address later in this judgment. Should the Claimants pay amounts in respect of rent and service charges from the Completion Date to the date on which the leases are granted? Introduction

155. The Claimants’ proposed draft order provided for completion to take place at a price to be calculated using a table which had a row in it labelled “apportionments” but with no figures, but rather “X” for flat N4.4 and “Y” for flat 8.1.

156. The Defendant’s draft had two alternative orders. Option A directed that the Contracts be dissolved. Option B directed that the Contracts be completed at specified sums, which were the balance of the purchase price after deducting the Deposit and Stage Payments, plus compensation for late completion up to 4 September 2023. There was no provision for any payment in respect of apportionments.

157. Neither party adduced any evidence about apportionments in the witness statements filed and served pursuant to my order dated 26 June 2026 and neither party said anything about them in their skeleton arguments for the hearing. At the hearing, I asked what the position was about apportionments, pointing out that if I declined to discharge the Contracts, I could not make an order for completion at a price calculated on the basis of “X” and “Y” for apportionments. At the end of the hearing, I directed that the parties notify the court by 29 July 2026 whether the apportionments had been agreed and if not, written submissions on the apportionments were to be filed and served by 5 August 2026.

158. I was notified on 29 July 2026 that the issue had not been agreed, and I was provided with a bundle of correspondence dealing with the issue and a spreadsheet summarising the amounts claimed by the Defendant. Written submissions were then filed and served on 5 August 2026. The submissions addressed the position both on the assumption that I would order the assignment of the 2024 Underleases and on the assumption that that I would order the grant of new leases. As I am going to order the grant of new leases, I will only refer to the submissions insofar as they address that situation. The Defendant’s position

159. The Defendant does not claim any apportionments in respect of outgoings such as council tax and utility bills under Standard Condition 6.3.1 (which is what I had thought was meant by apportionments in this context). Rather, the Defendant seeks payments in respect of ground rent and service charges under clauses 15.2.4 and 15.2.6 of the Contracts.

160. Clause 15.2 provides as follows: 15.2 Terms of the Lease 15.2.1 The rent, additional rent, term of years, covenants, provisions, conditions and other matters to be granted by and incorporated in the Lease of the Flat is that set out in the form of draft Lease annexed to this Agreement as Appendix 1. 15.2.2 The Seller reserves the right to make such changes to the Lease and the lease plan as it considers appropriate (acting reasonably) and to substitute a new lessor for that shown in the draft annexed hereto (subject to such lessor being entitled to the reversion immediately expectant upon the Lease). 15.2.3 The term of the Lease is to commence on such date as the Seller may reasonably stipulate (being a date after the date of this agreement and prior to the date of completion) to ensure that all of the flat leases in the Development start on the same date. 15.2.4 The liability to pay the rent reserved by the Lease is to commence on the Completion Date. 15.2.5 The liability to pay the contribution towards the insurance premiums under the Lease is to commence on the Completion Date. 15.2.6 The liability to pay the service charge under the Lease is to commence on the Completion Date such contribution to be an on account payment based on the Seller’s assessment of the estimated service charge liability for the Flat. 15.2.7 The “Premium” as stated in the Particulars of the Lease shall be the Price”.

161. The draft lease of Flat N4.4 reserves a rent of £4,000 p.a. equal to £10.96 per day, and the draft lease of Flat S8.1 reserves a rent of £3,000 p.a. equal to £8.22 per day. The Defendant claims rent at those rates from the Completion Date, 16 August 2023 until completion of the grant of the leases.

162. As to service charges, the Defendant claims: (a) For the calendar year 2024, £32,382 for Flat N4.4 and £24,696 for Flat S8.1. (b) For the calendar year 2025, £35,170 for Flat N4.4 and £36,823 for Flat S8.1. (c) For the calendar year 2026, the following daily rates from 1 January 2026 until completion - for Flat N4.4 £116.32 per day and for Flat S8.1 £88.71 per day.

163. The total claimed up to 31 July 2026 is £20,728 in respect of rent and £162,725 in respect of service charges, making £183,453 in all. The Claimants’ position

164. The Claimants do not claim any apportionment in respect of income received by the Defendant from the Flats. As to the claims in respect of ground rent and service charges, the Claimants first take a pleading point. The Claimants say that the Defendant’s claims to rent and service charges are consistent with the Claimants’ position that the Court can and should order the payment of sums payable under the Contracts as part of making an order for specific performance, even though no claim to such payment has been pleaded. But they are not consistent with the Defendant’s position that a claim to payments under the Contracts needs to be specifically pleaded.

165. Assuming the Defendant is entitled to advance the claims, the Claimants make a number of objections to the amounts claimed, which I will address below. The pleading issue

166. I agree with the Defendant’s response to the pleading point. As the Defendant says, the analogy with its position on the late compensation claim is a false one. That is because the Claimants are seeking specific performance from the Court and to obtain such an order they must be ready, willing and able to perform their own contractual obligations. There is no need for the Defendant to plead a claim to that effect, any more than it needs to plead a claim to receive the contractual price. The position is quite different to that of a claimant seeking to enforce a disputed contractual right to late completion compensation against a defendant. One would expect the parties to agree the amounts payable under clause 15.2.4 and 15.2.6 as part of the administrative arrangements for completion without any need for a pleaded claim. The Claimants’ argument that rent is only payable from the date on which the leases are granted

167. As I have said, clause 15.2.4 of the Contracts provides: “The liability to pay the rent reserved by the Lease is to commence on the Completion Date.”

168. However, the draft leases attached to the contracts provide at clause 2 that the Flat is demised: “… YIELDING AND PAYING during the Term the following sums as rent: 2.1 the Rent in advance by annual payments on 24th June or the next working day thereafter in every year the first proportionate payment in respect of the period from and including the date of this Lease to and excluding the payment day next following to be made on the date of this Lease” Under a lease granted on those terms, rent would be payable only in respect of the period from the date on which the lease was granted until the following 23 June.

169. The Claimants therefore say that rent is only payable on completion for the period from the grant of the lease until 23 June 2027. The Claimant says it would be unreasonable to alter those terms in the circumstances which have occurred – a long delay due to the Defendant’s wrongful assertion that the Contracts had been terminated, during which period the Defendant or associated companies have held possession of the Flats.

170. I disagree. In a situation where completion is delayed beyond the Completion Date – whether that is due to the fault of one party or the other, or due to the fault of neither – the effect of clause 15.2.4 is that, in addition to the reservation of rent by clause 2.1 of the leases, which only arises once the leases are granted, there is a contractual obligation on the Claimants to pay rent at the rate reserved by the lease from the Completion Date up to the grant of the leases. That does not require any amendment to the terms of the lease, so reasonableness is not relevant.

171. Accordingly, on completion the Claimants must pay rent from the Completion Date until the leases are granted under clause 15.2.4 of the Contracts, and then from the day the leases are granted until 23 June 2027 under clause 2.1 of the leases. The service charges

172. Schedule 7 of the draft leases contains the service charge provisions. Schedule 7 refers to a “Service Year” which is a calendar year expiring on 23 June or such other annual period as the landlord in its sole discretion decides – in the event, the Defendant determined that the Service Year would start on 1 January.

173. The tenant is liable to pay a “Service Charge” which comprises “Fair Proportions” of certain specified categories of expenditure incurred by the landlord during a Service Year, together with a reserve fund contribution. “Fair Proportion” means “a fair and reasonable proportion as shall be determined by the Landlord (acting reasonably) and notified to the Tenant from time to time”.

174. In each year, the tenant is to pay an “Estimated Service Charge” on account of the Service Charge, and then after the end of the Service Charge Year, the landlord is to send the tenant a statement of the costs incurred in the Service Year, and upon such statement being certified by the landlord's surveyor or its managing agents auditors or accountants it shall (as far as the law shall allow) be conclusive evidence for the purposes of all matters of fact referred to in the statement, except in the case of manifest error. Then if the Estimated Service Charge was lower than the actual Service Charge, the tenant has to pay the excess on demand; and if the Estimated Service Charge was higher than the actual Service Charge, the excess is credited against sums due or is repaid.

175. The Estimated Service Charge is “the amount which in the reasonable opinion of the Landlord shall from time to time represent a fair estimate of the Service Charge for the Service Year in question Provided that if it should appear necessary or appropriate to adjust the Estimated Service Charge during the Service Year the Estimated Service Charge may be increased or decreased (as the case may be) by the Landlord at any time”.

176. Schedule 7 paragraphs 4.1 and 4.2 provide: “4.1 The Tenant shall pay to the Landlord on account of the Service Charge on 25th March 24th June 29th September and 25th December in each year (or such other quarterly or half yearly days as shall be notified in writing to the Tenant) one quarter of the Estimated Service Charge (or one half where the Landlord shall specify half yearly days for payment) in advance 4.2 On the date of this Lease the Tenant shall pay to the Landlord the Estimated Service Charge for the period from the date of this Lease to the day before the next payment date”.

177. The Claimants argue that under Schedule 7 paragraph 4.2, service charges are only payable for the period starting on the grant of the lease. That is true so far as the terms of the lease are concerned. But in my view, the effect of clause 15.2.6 of the Contracts is that there is a contractual obligation to pay an additional amount in respect of the period from the Completion Date to the date on which the lease is granted.

178. The Claimants say that, having regard to those provisions, if clause 15.2.6 does require payment of sums in respect of the period prior to the grant of the lease, that can only be so in respect of the Service Year current at the date of completion.

179. I disagree. Rather, I think that the effect of clause 15.2.6 is that the Defendant must make a rational estimate in good faith of the amount of service charges payable under the provisions of Schedule 7 on the assumption that those provisions apply during the period from the Completion Date until the grant of the Lease. The Defendant must then, once the lease is granted, comply with the requirements of Schedule 7 on that assumption, including the obligation after the end of a Service Year to provide a certified statement of costs incurred in the Service Year. Then, if the on account payment made pursuant to clause 15.2.6 is higher than the actual Service Charge for the period from the Completion Date to the grant of the lease, the excess must be credited or refunded. The Claimants’ argument based on the definition of Fair Proportion

180. The Claimants argue that if they are liable to pay service charges, their liability is governed by the service charge provisions in Schedule 7 of the draft leases. I agree. As I have said, the liability under clause 15.2.6 is to pay such amount as the Defendant rationally estimates in good faith payable under Schedule 7 on the assumption that it applies during the period starting on the Completion Date.

181. Given the definition of “Fair Proportion” - “a fair and reasonable proportion as shall be determined by the Landlord (acting reasonably)” - the Claimants then say that no reasonable person in the Defendant’s position could determine that it was fair and reasonable for the Claimants to pay a proportion of the service charge costs during the period when the Defendant was wrongly refusing to complete, there were underleases in place granted to associated companies of the Defendant, and the Defendant made use of the Flats and received rent from them.

182. The Defendant’s written submissions did not engage with this argument, even though it was raised in BCLP’s letter dated 29 July 2026.

183. I accept the Claimants’ submission on this point in respect of 2024, 2025 and the period in 2026 up to 17 April 2026. During that period, the Defendant kept the Claimants out of possession of the Flats by wrongly contending that the Contracts had been terminated, and during that period, the Defendant made use of the Flats and received rent from them. In those circumstances, no person in the Defendant’s position acting fairly and reasonably could determine that it was fair and reasonable for the Claimants to pay a proportion higher than zero of the service charge costs. The position might very well be different if the Claimants were able to pursue a claim for late completion compensation, or were claiming the income from the Flats for the period up to completion. But that is not the case. Accordingly, I determine that no amount is payable under clause 15.2.6 in respect of that period.

184. I think the position is different in respect of the period since 17 April 2026. The reason that the leases were not granted after the Main Judgment was handed down was that the Claimants refused to complete without a deduction for late completion compensation. I think it is fair and reasonable for the Claimants to pay a contribution to the service charge costs for the period starting on 18 April 2026. From that time on, the delay in completion is primarily attributable to the Claimants’ insistence on a deduction for late completion compensation.

185. The Defendant’s estimate of the service charges payable for the current Service Year is £116.32 per day for Flat N4.4 and £88.71 per day for Flat S8.1. Therefore, subject to the points considered below, payment at those rates should be made under clause 15.2.6 on completion in respect of the period starting on 18 April 2026 up to completion, and under Schedule 7 paragraph 4.2 up to the next quarter day after completion, which will be 25 December 2026. The Claimants’ argument based on Schedule 4 paragraph 3 of the draft leases

186. Schedule 4 para 3 of the draft leases contains the following landlord’s covenant: “As to the other Apartments in the Building which are not from time to time let on leases granted at a premium to observe and perform or procure the observance and performance of covenants of a substantially similar nature to those contained in Schedule 2 and regulations of a substantially similar nature to those contained in Schedule 3 save that the Landlord shall not contribute towards any Service Charges which relate to a contribution to a reserve fund”.

187. The Claimants say that, in the case of Flat N4.4 this includes the 2024 Underlease of Flat S8.1, and in the case of Flat S8.1, this includes the 2024 Underlease of Flat N4.4. Therefore, the Claimants argue, each Claimant has a claim against the Defendant in the amount of any service charge liability (save for reserve fund liability) that would be due in respect of the other Flat.

188. This point was not addressed in the Defendant’s written submissions, even though it was raised in BCLP’s letter dated 29 July 2026. However, I think it is incorrect, because the Defendant can comply with its covenant with the Second Claimant in Schedule 4 paragraph 3 of the Flat N4.4 lease by requiring the First Claimant to pay the service charges due under the Contract relating to Flat S8.1, and the same is true in reverse of the covenant in the Flat S8.1 lease. The Claimants’ argument based on s.19 of the Landlord and Tenant Act 1985

189. The Claimants also rely on s.19 of the Landlord and Tenant Act 1985 , which provides: “(1) Relevant costs shall be taken into account in determining the amount of a service charge payable for a period— (a) only to the extent that they are reasonably incurred, and (b) where they are incurred on the provision of services or the carrying out of works, only if the services or works are of a reasonable standard; and the amount payable shall be limited accordingly. (2) Where a service charge is payable before the relevant costs are incurred, no greater amount than is reasonable is so payable, and after the relevant costs have been incurred any necessary adjustment shall be made by repayment, reduction or subsequent charges or otherwise”.

190. The Defendant says that the amount payable under clause 15.2.6 of the Contracts is not a “service charge” as defined in s.18 of the 1985 Act . A “service charge” is there defined as “an amount payable by a tenant of a dwelling as part of or in addition to the rent” which is payable, directly or indirectly, for services, repairs, maintenance, improvements or insurance or the landlord’s costs of management, and the whole or part of which varies or may vary according to the costs or estimated costs incurred or to be incurred by or on behalf of the landlord, or a superior landlord, in connection with the matters for which the service charge is payable. The Defendant says that neither Claimant is a tenant until the leases are granted.

191. I disagree. Where there is a specifically enforceable agreement for lease and the date for completion has passed, there is an equitable lease which constitutes a “tenancy” for the purposes of the 1985 Act : see s.36(2) (b), which provides: “(1) In this Act “lease” and “tenancy” have the same meaning. (2) Both expressions include— (a) a sub-lease or sub-tenancy, and (b) an agreement for a lease or tenancy (or sub-lease or sub-tenancy). (3) The expressions “lessor” and “lessee” and “landlord” and “tenant”, and references to letting, to the grant of a lease or to covenants or terms, shall be construed accordingly.”

192. As to s.19(1) , the Claimants have not argued that any of the service charge costs were not reasonably incurred, so s.19(1) is not relevant at this stage. Once the leases have been granted, and the Defendant has sent the Claimants certified statements of the service charge costs, it will be open to the Claimants to challenge service charge costs as having been unreasonably incurred. If such a challenge is made and succeeds, the Service Charge will be lower accordingly, and if the payment on account made under clause 15.2.6 is too high, a credit or repayment will be due.

193. As to s.19(2) , for the reasons I have given, I think that it is reasonable for the Claimants to pay an on account amount under clause 15.2.6 in respect of the period starting on 18 April 2026. The Claimants’ argument based on s.20 B of the Landlord and Tenant Act 1985

194. S.20 B of the Landlord and Tenant Act 1985 says: “(1) If any of the relevant costs taken into account in determining the amount of any service charge were incurred more than 18 months before a demand for payment of the service charge is served on the tenant, then (subject to subsection (2)), the tenant shall not be liable to pay so much of the service charge as reflects the costs so incurred. (2) Subsection (1) shall not apply if, within the period of 18 months beginning with the date when the relevant costs in question were incurred, the tenant was notified in writing that those costs had been incurred and that he would subsequently be required under the terms of his lease to contribute to them by the payment of a service charge”.

195. The Claimants say that this applies and therefore they cannot be required under clause 15.2.6. to contribute to any costs incurred more than 18 months prior to the notification by the Defendant on 27 July 2026 of the amounts of the costs incurred in 2024 and 2025.

196. The Defendant’s only answer to this was that clause 15.2.6 payments are not “service charges”. I disagree for the reasons given above.

197. That being so, the Defendant is not entitled to a payment under that clause in respect of service charge costs incurred before 28 January 2025. That is not, however, relevant to the amounts payable in respect of the period starting on 18 April 2026, which are based on the estimated amount payable in respect of costs incurred in the current Service Year. The date for completion

198. I will make an order fixing the date for completion as 6 October 2026, which will be 10 working days after the handing down of this judgment and the making of the order for specific performance. That will, I consider, give sufficient time for the parties to make the necessary arrangements for completion to take place, given the date on which the draft judgment was circulated. Matters addressed after circulation of a draft of the above parts of this judgment and a draft order

199. After circulating a draft of the above parts of this judgment, and a draft of the order I propose to make, the parties filed written submissions on the form of the order and the costs of Consequentials Hearing and certain other matters. I will give my decision on those other matters and then address the costs of the Consequentials Hearing. Permission to appeal

200. The Claimants apply for permission to appeal against my decision that they are not entitled to claim late completion compensation, and my refusal of permission to amend, on three grounds. I consider that each of those grounds has a reasonable prospect of succeeding and I grant permission to appeal on those grounds. Whether the 2024 Underleases should be surrendered only after the Claimants’ solicitors have been put in funds to complete

201. The Defendant asks that the order should provide that the 2024 Underleases are only to be surrendered after the Claimants’ solicitors have been put in funds to complete, because otherwise if the Claimants fail to complete the Defendant is at the risk of suffering significant losses. I reject that request because: (a) Simultaneous performance of the parties’ obligations on completion is what is required by the Contracts and there is no ground for departing from that in the order that those obligations be specifically performed. (b) The Defendant’s proposal may create practical problems for the Claimants, while the Defendant’s assertion that the surrender of the 2024 Underleases may cause it prejudice is inconsistent with the Defendant’s evidence filed for the Consequentials Hearing: see Mr Jain’s witness statement at §§12-13. (c) If the Claimants do not complete, the Defendant will be entitled to forfeit the Deposit and Stage Payments which will greatly exceed any possible loss that they may suffer by having to procure the surrender of the 2024 Underleases. Other minor issues on the drafting of the order

202. The Claimants requested certain changes to the form of the order, which the Defendant agreed subject to certain minor variations. These seem appropriate and I have incorporated them in the order, subject to including a time limit for notification that a Hotel Operator Disclaimer is required. The costs of the Consequentials Hearing The Defendant’s position

203. The Defendant position can be summarised as follows. It was overall the successful party in the Consequentials Hearing. Identifying the successful party is a matter of substance and reality: see per Sir Thomas Bingham MR in William Roache v News Group Newspapers Limited [1998] EMLR 161 at 168. The real issue at the Consequentials Hearing was whether the Claimants could claim late completion compensation. Financially, it was clearly by far the most significant issue. Cs were claiming over £2.5 million, a quarter of the entire purchase price, and almost six times the payment on account they won. The bulk of the correspondence leading up to the hearing addressed this issue. It was by far the most time-consuming issue at the hearing. Further, it was only because of the stance which the Claimants took on this point that completion had not occurred by the time of the hearing. The only reason that completion did not occur on 11 May 2026, by way of assignment of the 2024 Underleases to Mr Aadinatha, was because of the disagreement over late completion compensation. But for that point being taken, the only issue which would have been left between the parties for determination would have been costs. The sub-issues arising would have been narrower, as completion would have occurred. This could potentially have been dealt with on paper, and in any event within the half-day hearing posited in paragraph 45 above. The financial stakes would in any event have been far lower.

204. The starting point is therefore that the Defendant should have its costs. There should not be an issue-based order. To the extent that the Defendant lost on issues, they were issues that were only raised because completion did not occur on 11 May 2026 which was due to the Claimants refusing to complete without a deduction for late completion compensation. The issues on which the Defendant lost were in any event relatively narrow points of law reasonably raised. In considering the issues on which each party succeeded, the Defendant succeeded on some issues that were much debated in correspondence and were the subject of evidence, but which were conceded by the Claimants prior to the hearing. Although the Defendant lost on the argument as to the right order as to the costs up to the Main Judgment, it achieved a substantial reduction in the payment on account. One issue on which the Defendant lost - If, however, an issue-based order is appropriate, only a modest reduction in the Defendant’s costs could be appropriate.

205. A payment on account of the Defendant’s costs should be ordered of £175,000. In support, the Defendant filed a summary of its litigation costs incurred after the Main Judgment, not including conveyancing costs. The original version of this, and the Defendant’s written submissions, incorrectly said that these costs added up to £280,150. In fact, this was due to an error in the formula used to sum the various costs, and after this was pointed out by the Claimants, a corrected version was filed. The total in this is £319,150 made up as follows: Solicitors - attendances on client £11,120 Solicitors - attendances on opponents £1,520 Solicitors - attendances on others £10,860 Solicitors - time spent on documents £23,450 Solicitors - attendance at hearing £10,100 Total solicitors' costs £57,050 Leading counsel Fee for advice/conference/documents £123,700 Fee for hearing £78,500 Junior counsel Fee for advice/conference/documents £20,900 Fee for hearing £39,000 Total counsel's fees £262,100 Total £319,150

206. The Defendants recognise that this figure is at the higher end for the costs of a consequentials hearing, but point to the complexity of the issues. They also point to the fact that the Claimants’ schedule of costs filed prior to the Consequentials Hearing recorded costs of £380,914 from 17 April 2026 to 21 July 2026. The Claimants’ position

207. The Claimants’ position can be summarised as follows. The Claimants are the successful party in the litigation, and that includes dealing with consequential matters, including seeking to reach agreement on those matters and making submissions where they are not agreed. Thus, the starting point is that the Claimants should have their costs of dealing with the consequential matters as costs in the case.

208. The Claimants recognise that they have lost on an issue of significance which was part of those consequential matters: the late completion compensation issue. That justifies a departure from the starting position. However, it is important to begin the analysis in the right place, namely that it is the Defendant’s wrongful refusal to complete in 2023 which is the primary reason why the parties have incurred the costs of this litigation. Further, the Claimants won on a number of the issues debated at the Consequentials Hearing, or in the written submissions filed after the hearing. The issues on which the Claimants won were important, particularly the question of whether the notices to complete were valid, whether the Contracts should be discharged and the appropriate order as to costs.

209. The Court should not treat the time spent at the hearing on the late completion compensation issue as representing the time and cost spent on the issues in the litigation in total since the Main Judgment was handed down. Little time was spent on that issue in the correspondence. Much more time was spent on the notices to complete served by the Defendant and on dealing with the conveyancing mechanics. This is supported by the figures in the Defendant’s costs summary for counsel’s advice are so high that the advice cannot have been concerned only or predominantly with the late completion compensation issue. The schedule of work done on documents indicates that the bulk of the time and cost recorded on the documents was spent on issues on which D lost.

210. Accordingly, the appropriate order is that the Claimants pay the Defendant’s costs of the issue of late completion compensation. Otherwise, costs of the Consequentials Hearing be costs in the case such that the Defendant pay the Claimants' costs. It is not possible for the Court to make a percentage based order. To make such an order, the Court needs to be able to make a fair - if rough and ready - assessment of the costs of the litigation as a whole and take into account the parties' respective success in Court. The Court cannot do that. It cannot know at this distance what proportion of the time between April and July 2026 was spent dealing with late completion compensation and what was spent on other matters. The vast bulk of the non-hearing work was not related to the late completion compensation point, because the parties' position on that had crystallised within less than a week from the Main Judgment. Certain issues on which C succeeded which were more valuable - the invalidity of the notices to complete and the risk of discharge - by contrast, continued well beyond that, for months. The Defendant has not put the material before the Court in a manner which allows the Claimants or the Court to review and assess which costs are referable to which parts. Alternatively, there should be no order as to costs after 17 April 2026.

211. No payment on account should be ordered. Alternatively, if a payment is to be made, it should be no more than £50,000. My decision

212. I agree with the Claimants that the starting point is that issues arising consequential on my judgment form part of the costs of the litigation as a whole, and therefore the starting point is that the Claimants should have their costs of dealing with those issues. But, as the Claimants accept, that is not the case with costs incurred because the Claimants wrongly refused to complete without a deduction of over £2.5 million for late completion compensation.

213. I do not think it right to say that the Defendant was the successful party overall. Rather, each party was successful on different issues. I will summarise the issues which were either conceded or decided and my assessment of the parties’ success on them: No. Issue Successful party 1 Whether late completion compensation could be claimed without amendment D 2 Whether permission to amend should be granted D 3 Validity of the post-Main Judgment notices to complete Cs 4 Whether the Contracts should be discharged Cs 5 Should completion be in the name of Mr Aadinatha D 6 Should completion be by assignment or the grant of new leases Cs 7 The appropriate order as to costs up to the Main Judgment Cs 8 The amount of the payment on account D 9 Interest on costs Cs 10 The amount payable in respect of rent and service charges Partial success for each party, but much more so for Cs

214. The Defendant succeed on issues 1 and 2- the late completion compensation issue -which involved a claim to over £2.5 million and took over half the time at the Consequentials Hearing. That was a significant victory and the Claimants correctly acknowledge that it should be reflected in the costs order.

215. It is true that issues 3 and 4 were very significant issues. But I agree with the Defendant that if issues 1 and 2 had not been raised, issues 3, 4, 5 and 6 would never have arisen. The Defendant would not have served notices to complete after the Main Judgment and would not have applied for the Contracts to be discharged, and there would have been no issue about whether completion should take place by assignment of the 2024 Underleases or by the grant of new leases, nor about whether completion should be in the name of Mr Aadinatha or the Claimants. The Claimants conceded issue 5, and I consider that the Defendant’s position on issues 3, 4 and 6 was reasonably adopted in the circumstances. That being so, I do not think that the Claimants’ success on those issues should be given much weight in deciding on the appropriate costs order, although I have taken it into account.

216. If the Claimants had not claimed late completion compensation, it would not have avoided the need for a hearing to deal with issues 7-10. However, in financial terms, they were nothing like as significant as issues 1 and 2. I think that those issues could have been dealt with in a half-day hearing. The Claimants were largely successful on those issues, and the costs order should reflect that.

217. If the Claimants had not claimed late completion compensation, it would not have avoided the need for some costs to be incurred in dealing with conveyancing matters, but my assessment is that such costs would have been relatively small compared to the costs incurred by the parties in litigating the issues that were disputed.

218. I disagree with the Claimants’ submission that I cannot make even a rough and ready assessment of the proportion of costs incurred since the Main Judgment attributable to the Claimants having wrongly claimed late completion compensation. I consider that I can make such an assessment, although as Jacob LJ said in the passage in SmithKlineBeecham quoted in paragraph 122 above, it is necessarily somewhat crude.

219. I do not think that the figures in the Defendant’s costs schedule should guide me in determining the appropriate order. The sums claimed in respect of counsel’s fees other than for the hearing do seem, as the Claimants say, extremely high. But that will be dealt with as part of the detailed assessment of the costs.

220. Overall, my assessment, having regard to the correspondence since 17 April 2026 and the submissions made orally and in writing, and to the matters summarised aboev, is that the fair order is that the Claimants should pay 35% of the Defendant’s costs since 17 April 2026. As to a payment on account of those costs, I consider that the appropriate amount is £75,000.

221. The Claimants suggested that a different interest rate should apply to the Defendants’ costs than to the Claimants, but I do not think that degree of sophistication is required, especially given that the Defendants’ costs in question are only those incurred by in the last few months. Summary

222. I summarise the main conclusions I have reached as follows: (a) The Claimants are not entitled to claim compensation for late completion without amending the Particulars of Claim. (b) The Claimants should not be given permission to amend to claim late completion compensation. (c) It is therefore unnecessary to determine whether the Claimants would have been entitled to late completion compensation if they had claimed it, and if so, how much. (d) The notices to complete served by the Defendant after the handing down of the Main Judgment were not valid. (e) The Court should not order that the Contracts be discharged. (f) The Court should direct the surrender of the 2024 Underleases and the grant of new underleases and should not make that conditional on the Claimants’ putting their solicitors in funds to complete. (g) The Claimants should pay rent at the rate reserved in the draft leases from 16 August 2023 until 23 June 2027. (h) The Claimants should pay an amount on account of service charges from 18 April 2026 until 24 December 2026. (i) The Defendant should pay the Claimants’ costs up to the date of the Main Judgment and a payment on account of £450,000 in respect of those costs. (j) The Claimants should pay 35% of the Defendant’s costs from the Main Judgment to the date of this judgment, and a payment on account of those costs of £75,000. (k) The paying party is to pay to the receiving party interest on its costs on each tranche of costs paid by the receiving party to their solicitors from the date each such tranche was so paid at the rate of 4% per annum above Bank of England base rate from time to time until 4 months after the date of this order, and at the Judgments Act 1838 rate thereafter (l) The Claimants should have permission to appeal against paragraphs (a) and (b) above.