Her Honour Judge Melissa Clarke: A. Introduction

1. This is judgment on an appeal of a decision of District Judge Chataway of 8 December 2025 in determining preliminary issues relating to liability for service charges under a commercial lease in favour of the Respondent. Those preliminary issues were questions of law and contractual construction.

2. The lease was dated 16 November 2012 and demised the Ground Floor Premises at 41 High Road, Bushey Heath WD2 1EE (“ the Premises ”) to the Appellant for a term of years commencing on 22 October 2019 and expiring on 21 October 2027 (“ the Lease ”). It incorporated, save as modified, the provisions of an earlier lease between the parties dated 11 October 2005 as varied by a deed of variation dated 16 November 2012 (“ the Previous Lease ”). It is common ground that the modifications are not relevant for the purposes of this appeal. I will refer to the Lease and the Previous Lease together as “ the Leases ”.

3. The Respondent’s underlying claim is for £70,796.44 for service charge arrears relating to service charges incurred in respect of works undertaken to the building in which the Premises is situated, plus interest and costs (including contractual costs).

4. The particulars of claim allege that the Appellant’s liability arises under clause 3.23, Schedule 4 paragraph 4-4.1, and Schedule 5 of the Previous Lease (as incorporated into the Lease), and that it complied with these provisions by serving documents it alleged were provisional charge notices (as that term is defined at paragraph 5-1 of Schedule 5 to the Previous Lease (“ PCN ”)) on 11 May 2022, 27 July 2022 and 27 August 2022 followed by a final notice (as that term is defined at paragraph 5-3 of Schedule 5 to the Previous Lease (“ Final Notice ”)) on 11 January 2024; alternatively by serving both a PCN and a Final Notice on 14 June 2024 after the relevant works had been carried out.

5. The Appellant defended on the basis that, inter alia , the documents, individually or together, do not constitute PCNs; the Respondent’s ability to recover service charges under clause 3.23 and Schedule 4 paragraph 4-4.1 are subject to a condition precedent that the Respondent has served a valid PCN before the works commenced or were completed; and that the letters were not validly served.

6. The preliminary issues relevant to this appeal determined by the judge below were whether, on a true construction of the Lease: i. Schedule 5 provides the only route to recovery of costs, or whether Schedule 4 provides an alternative (“ Issue (a) ”) ; ii. prior service of a PCN pursuant to Schedule 5 is a precondition for serving a Final Notice (“ Issue (b) ”); and iii. a PCN can be served once the works have been completed (“ Issue (d) ”) .

7. The judge found that: i. in relation to Issue (a), Schedule 5 provides the only route; ii. in relation to Issue (b), prior service of a PCN is not a precondition; and iii. in relation to Issue (d), a PCN can be served after completion of the works.

8. There was also a preliminary issue (c), which was whether the letters of 11 May 2022, 27 July 2022 and 27 August 2022 served in 2022, individually or together, constitute a PCN, and the judge determined that they did not. No issue is taken with this decision in this appeal.

9. Permission to appeal was granted by HHJ Andrew Davies. B. The Lease

10. Clause 4.2 of the Previous Lease contains the Respondent landlord’s maintenance and repairing obligations. It provides at Clause 4.2.1 that the landlord “ must repair and keep in good repair and condition all parts of the Block for which neither the Tenant nor any other tenant is wholly responsible (or would be responsible if the relevant part of the Block had been let)” and then sets out a non-exhaustive list. Nothing turns on that list for the appeal. It provides at Clause 4.2.2 that the landlord “ must decorate the exterior of the Block and such of the Common Parts to a reasonable standard as and when reasonably required but not less often than every five (5) years ”.

11. By Clauses 5.1 and 5.2 of the Lease, each of the parties covenant “ …to observe and perform all the covenants and conditions… contained in the Previous Lease ”. The Previous Lease requires the Appellant to “…observe and perform the Shop Covenants ”. It defines the Shop Covenants as the covenants set out in Schedule 4 to the Previous Lease.

12. Schedule 4, paragraph 4-4.1 of the Previous Lease provides: “Subject to the provisions of Schedule 5 the Tenant must pay to the Landlord within twenty eight (28) days of receipt of a written demand a fair proportion to be determined by the Surveyor, acting as an expert and not as an arbitrator, of any sums that the Landlord may become liable to pay in connection with the performance of its covenants contained in clause 4.2 provided that where any costs that the Landlord becomes liable to pay in or incidental to the performance of those covenants are incurred only in relation to one or more of the units in the Block but not all of those units (the Premises being regarded for this purpose as one of those units) then the determination of the proportion by the Surveyor must be made in respect only of the units that are benefited or affected by the works in respect of which the costs were incurred, in exoneration of the units that are not so benefited or affected”.

13. It is convenient to set out Schedule 5 in full: “SCHEDULE 5: PROVISIONAL PAYMENTS 5-1 Service of a provisional charge notice If and whenever the Landlord believes or is advised that work should be carried out pursuant to clause 4.2 the Landlord must serve on the Tenant a notice (“a provisional charge notice”) indicating: 5-1.1 the nature of the work, 5-1.2 the estimated cost of the work, 5-1.3 the proportion of the cost of the work that the Surveyor has provisionally determined is payable by the Tenant in accordance with paragraph 4-4 (‘the Provisional Charge’) and 5-1.4 providing the Tenant with a copy of the necessary paperwork indicating how the expense in question has been calculated. 5-2. Payment of the Provisional Charge 5-2.1 If the Tenant reasonably believes that the Landlord's decision pursuant to clause 5-1 is fair and reasonable the Tenant will pay the Provisional Charge to the Landlord within twenty eight (28) days of the service of a provisional charge notice and the information referred to in clause 5-1.4 [P]ROVIDED THAT the Tenant shall not be obliged to pay any sums pursuant to this clause until the Landlord has commenced the works to which the sums relate 5-2.2 Once the Landlord has commenced the works in respect of which it has received payment from the Tenant it shall proceed diligently with the same and use all reasonable endeavours to complete the same as soon as reasonably practicable thereafter causing the minimum damage and interference to the Tenant's business 5-2.3 All monies received from the Tenant pursuant to this Schedule shall be placed in an interest-bearing account and shall be held in trust for the tenants (along with all accrued interest which shall [be] credited to the account at regular intervals) 5-2.4 Any sums received from the Tenant which have not been expended within three (3) months of receipt shall forthwith be returned to the Tenant and if not so returned within fourteen (14) days of the expiry of the said three (3) month period the Landlord shall pay to the Tenant Interest on any unpaid sums calculated from the expiry of the said three (3) month period to the date upon which the Tenant receives the sum properly due to it in cleared funds 5-3 The Final Notice As soon as convenient after the work has been carried out the Landlord must give to the Tenant a notice (“a final notice") setting out: 5-3.1 the actual cost of the work. 5-3.2 the proportion of the cost of the work that, is payable by the Tenant in accordance with paragraph 4-4 (‘the Actual Charge'), and 5-3.3 the difference between the Provisional Charge and the Actual Charge. 5-4 Excess or shortfall If the Provisional Charge exceeds the Actual Charge, the excess must be refunded by the Landlord to the Tenant (and if not so refunded within fourteen (14) days of the demand may be deducted by the tenant from the next payment due from the Tenant to the Landlord under this Lease), and if the Actual Charge exceeds the Provisional Charge the shortfall must be paid to the Landlord by the Tenant, in either case within fourteen (14) days of the service of the final notice. 5-5 Dispute If the Tenant reasonably believes that the Landlord’s decision pursuant to clause 6.1 [NB it is common ground between the parties that this is a typographical error and should read Schedule 5 paragraph 5-1] is not fair and reasonable the parties shall cooperate in a view to promptly reaching agreement on any issues upon which they disagree but [if] they are unable to resolve their differences within sixty (60) days or such shorter period as is reasonable in all the circumstances either party may refer the matter to an appropriately qualified surveyor whose identity shall be agreed between them or shall be chosen by the President of the Royal Institution of Chartered Surveyors on the application of either party in the absence of agreement.” C. The Law

14. There is no dispute between the parties as to the principles governing the construction of a contract, which is well established following the Supreme Court case of Arnold v Britton [2015] A.C. 1619 . In his judgment, Lord Neuberger (with whom Lord Sumption, Lord Hughes and Lord Hodge agreed) approved and expanded on the guidance given in the earlier Supreme Court case Rainy Sky SA v Kookmin Bank [2011] 1 WLR 2900 , at [14] – [23]. Lord Carnwath produced a dissenting judgment, but did not take issue with Lord Neuberger’s discussion of the law. Lord Neuberger said at [15] to [22]: “ [15] When interpreting a written contract, the court is concerned to identify the intention of the parties by reference to “what a reasonable person having all the background knowledge which would have been available to the parties would have understood them to be using the language in the contract to mean”, to quote Lord Hoffmann in Chartbrook Ltd v Persimmon Homes Ltd [2009] AC 1101 , para 14. And it does so by focussing on the meaning of the relevant words, in this case clause 3(2) of each of the 25 leases, in their documentary, factual and commercial context. That meaning has to be assessed in the light of (i) the natural and ordinary meaning of the clause, (ii) any other relevant provisions of the lease, (iii) the overall purpose of the clause and the lease, (iv) the facts and circumstances known or assumed by the parties at the time that the document was executed, and (v) commercial common sense, but (vi) disregarding subjective evidence of any party’s intentions. In this connection, see Prenn [1971] 1 WLR 1381 , 1384—1386; Reardon Smith Line Ltd v Yngvar Hansen-Tangen (trading as HE Hansen-Tangen) [1976] 1 WLR 989 , 995—997, per Lord Wilberforce; Bank of Credit and Commerce International SA v Ali [2002] 1 AC 251 , para 8, per Lord Bingham of Cornhill; and the survey of more recent authorities in Rainy Sky [2011]. [16] For present purposes, I think it is important to emphasise seven factors. [17] First, the reliance placed in some cases on commercial common sense and surrounding circumstances (e.g. in Chartbrook [2009] AC 1101 , paras 16—26) should not be invoked to undervalue the importance of the language of the provision which is to be construed. The exercise of interpreting a provision involves identifying what the parties meant through the eyes of a reasonable reader, and, save perhaps in a very unusual case, that meaning is most obviously to be gleaned from the language of the provision. Unlike commercial common sense and the surrounding circumstances, the parties have control over the language they use in a contract. And, again save perhaps in a very unusual case, the parties must have been specifically focussing on the issue covered by the provision when agreeing the wording of that provision. [18] Secondly, when it comes to considering the centrally relevant words to be interpreted, I accept that the less clear they are, or, to put it another way, the worse their drafting, the more ready the court can properly be to depart from their natural meaning. That is simply the obverse of the sensible proposition that the clearer the natural meaning the more difficult it is to justify departing from it. However, that does not justify the court embarking on an exercise of searching for, let alone constructing, drafting infelicities in order to facilitate a departure from the natural meaning. If there is a specific error in the drafting, it may often have no relevance to the issue of interpretation which the court has to resolve. [19] The third point I should mention is that commercial common sense is not to be invoked retrospectively. The mere fact that a contractual arrangement, if interpreted according to its natural language, has worked out badly, or even disastrously, for one of the parties is not a reason for departing from the natural language. Commercial common sense is only relevant to the extent of how matters would or could have been perceived by the parties, or by reasonable people in the position of the parties, as at the date that the contract was made. Judicial observations such as those of Lord Reid in Wickman Machine Tools Sales Ltd v L Schuler AG [1974] AC 235 , 251 and Lord Diplock in Antaios Cia Naviera SA v Salen Rederierna AB (The Antaios) [1985] AC 191 , 201, quoted by Lord Carnwath JSC at para 110, have to be read and applied bearing that important point in mind. [20] Fourthly, while commercial common sense is a very important factor to take into account when interpreting a contract, a court should be very slow to reject the natural meaning of a provision as correct simply because it appears to be a very imprudent term for one of the parties to have agreed, even ignoring the benefit of wisdom of hindsight. The purpose of interpretation is to identify what the parties have agreed, not what the court thinks that they should have agreed. Experience shows that it is by no means unknown for people to enter into arrangements which are ill-advised, even ignoring the benefit of wisdom of hindsight, and it is not the function of a court when interpreting an agreement to relieve a party from the consequences of his imprudence or poor advice. Accordingly, when interpreting a contract a judge should avoid re-writing it in an attempt to assist an unwise party or to penalise an astute party. [21] The fifth point concerns the facts known to the parties. When interpreting a contractual provision, one can only take into account facts or circumstances which existed at the time that the contract was made, and which were known or reasonably available to both parties. Given that a contract is a bilateral, or synallagmatic, arrangement involving both parties, it cannot be right, when interpreting a contractual provision, to take into account a fact or circumstance known only to one of the parties. [22] Sixthly, in some cases, an event subsequently occurs which was plainly not intended or contemplated by the parties, judging from the language of their contract. In such a case, if it is clear what the parties would have intended, the court will give effect to that intention. An example of such a case is Aberdeen City Council v Stewart Milne Group Ltd 2012 SC (UKSC) 240, where the court concluded that “ any . . . approach ” other than that which was adopted “ would defeat the parties’ clear objectives ”, but the conclusion was based on what the parties “ had in mind when they entered into the contract ”: see paras 21 and 22.”

15. At [77], Lord Neuberger explained that the exercise of construction “ is not there to re-write the parties’ agreement… because subsequent events have shown that the natural meaning of the words has produced a bad bargain for one side. The question for the court is not whether a reasonable and properly informed tenant would enter into such an undertaking. That would involve the possibility of re-writing the parties’ bargain in the name of commercial good sense .”

16. The Appellant relies on Teva Pharma – Productos Farmaceuticos LDA v AstraZeneca – Productos Farmaceuticos Lda [2017] EWCA Civ 2135 at [40] and Campbell v Daejan Properties [2013] 1 P&CR 14 at [56] which I will come back to. D. Grounds of Appeal

17. A summary of the Grounds of Appeal follows: i. Ground 1 - The judge below was wrong to find on Issue (d) that a PCN can be served after the works have been completed, because the natural and ordinary meaning of the words in Schedule 5 of the lease “ If and whenever the landlord believes or is advised that work should be carried out pursuant to clause 4.2 the landlord must serve on the tenant a notice ” is that the PCN must be served before the works are completed. The PCN must contain the estimated cost of the work and the proportion provisionally determined to be payable by the Tenant. Once the works have been carried out, by definition such a notice will include the actual and not estimated cost of the work and proportion finally determined to be payable by the Tenant. ii. Ground 2 - The judge was wrong in his conclusion on Issue (b) that if a PCN cannot be served after the works had been completed, the same is not a condition precedent to the service of a Final Notice, because by doing so he allowed consideration of the commercial result to override the plain meaning of the words of Schedule 5, contrary to the guidance given by the Supreme Court in Arnold v Britton at [20] and [77]. It was merely an attempt by the judge to avoid a situation where the Respondent could not recover service charges from the Appellant, and not a true construction of the lease. Further, this construction would deprive Schedule 5, paragraphs 5-1, 5-2 and 5-5 of much of their effect, contrary to the reasonable assumption that the parties intended the whole of the contract to be effective and that non-compliance would be subject to some sanctions.

18. Respondent’s Notice - The Respondent maintains that the judge’s findings in relation to Issue (b) and Issue (d) should be upheld, but has filed a Respondent’s Notice asking the appellate court to uphold the judge’s order on the basis that he determined Issue (a) incorrectly. It is the Respondent’s case that the judge should have found that Schedule 5 of the lease does not provide the only route to recovery of service charges, because the lease provides for independent obligations to pay, and provides for mechanisms for demand for, and payment of, service charges by way of paragraphs 4 to 4.1 of Schedule 4 as well as Schedule 5. E. The Judge’s decision

19. In relation to Issue (a), the judge set out the question for his determination in the following terms at [18]: “ The question here is: whether the lease sets out alternative procedures for recovering the cost of works, as the claimant contends, or whether Schedule 5 and the provisions for Final Notice set out in that Schedule are the only way to recover such costs .” No issue is taken by the Appellant with that framing. He went on to say: [19] There is some support for the claimant's case in that paragraph 4-4.1 of Schedule 4 refers to a requirement to pay “within 28 days”. This is different from the 14-day period for payment that applies after service of a Final Notice under Schedule 5. Notwithstanding this, I am not persuaded that there are alternative routes. First, paragraph 4-4.1 is very clear; it states that the requirement to pay is “subject to the provisions of schedule 5.” Secondly, Schedule 5 itself states at the outset as follows: “ If and whenever the landlord believes or is advised that work should be carried out pursuant to clause 4.2, the landlord must serve on the tenant a notice…” [emphasis added by the judge below]. In my judgment, it might just be possible to read the words “subject to” in the paragraph 4-4.1 as allowing for an alternative process, but the opening words of Schedule 5 put it beyond all doubt that Schedule 5 is intended to be the single gateway for any demand for payment. [20] I conclude that the reference to 28 days is simply a mistake. It is a typo, of which there are several in the contract. It was argued that it is significant that the words “subject to” appear at the beginning of paragraph 4.1. I do not see it would make any difference if they appeared at the end. Therefore, it seems to me that it is to Schedule 5 that one has to look, in order to see whether payment is due.

20. In relation to Issue (b), whether service of a PCN is a mandatory precondition to the landlord serving a Final Notice, he said that “ In part, it turns on the nature and importance of the ADR process set out in Schedule 5. ” He noted in [22] that paragraph 5-5 of Schedule 5 is widely drafted, allowing the parties to ask a surveyor to look at “ the landlord’s decision ” and found that “ it could encompass any aspect of the proposed charge which the tenant does not regard as “fair and reasonable”. It might encompass for example, the need for any works at all; whether the proposed works are within the scope of the lease; and whether an appropriate proportion has been charged to the tenant ”. He asked himself in [23] whether the ADR process was intended to be determinant of the parties’ contractual rights, and in [24] rejected the defendant’s submission that it was, saying “There is nothing in the two clauses which says that if the tenant disagrees with the charge then they must refer to ADR. What the clause says is that either party may do so. Similarly there is nothing in the schedule which states that a tenant will be deemed to have accepted the charge if they do not make a referral. Neither is there anything in the schedule which says that the surveyor’s decision after a referral will be binding.”

21. The judge accepted in [25] that his interpretation meant that the PCN does not require any payment at all (commenting “ on the face of it, it is surprising ”) but held that if the clauses had intended to bite in the way that the defendants contend, the Lease would have said so. Rather, he found that “…if a PCN is served, the parties will have the option to try to resolve things through the ADR process. But ultimately, if the issues are not resolved, then [the] landlord will simply have to get on and complete the works, and serve a Final Notice to require payment. ”

22. At [26] he held that the lease properly interpreted, “ clearly does not ” mean that the landlord is required to put the proposed works on hold pending the resolution of any dispute through ADR, saying: “a. There is nothing in the lease that says this. b. Secondly, while the works in this case were not urgent, the lease must be interpreted in a way which accommodates the need for urgent works. In my judgment this is an important point, to which I will return. I ask myself, for example, what would happen if an issue arose about subsidence, or a significant leak, that required urgent attention. Even if the timescales for a preliminary discussion in paragraph 5.5 are abridged, the ADR process may involve a referral to the President of the Royal Institution to select a surveyor, and then the referral to the surveyor, and then a decision-making process. Clearly the ADR process might all take a significant amount of time. In my judgment, the parties cannot be taken to have agreed that works must be put on hold while that process runs through. c. Lastly, I have found that the outcome of the ADR process provided by paragraph 5.5 is not binding in any event. This suggests it is not such a key part of the lease, that it would require everything else to be put on hold in the meantime.”

23. At [28] he referred to the list of factors to take into account when considering whether a covenant is a condition precedent contained in Woodfall at para 11.019. He identified the following factors as being of particular relevance: i. the terms used in the lease which he found favoured the defendant , noting that the liability to pay in 4-4.1 is “subject to schedule 5” and the opening words of paragraph 5-1 were cast in mandatory terms. He said “ There is nothing in the final charge paragraph, paragraph 5-3 itself, which says that compliance with 5-1 is a necessary precondition… the wording of both 5.3 and 5.4 assume prior compliance”; ii. (at [29]) the consequences that follow according to the covenants as construed as either dependent or independent .

24. On this second factor above, the judge held at [30] that if the provisional charge process is read as a necessary precondition “ then it follows that a landlord who fails, for any reason, to follow that process will be left with no right to recover the cost of repairs from the tenant ”. He recognised that there is “ no presumption in construing a lease that the service charge provisions will enable a landlord to recover all of his expenditure ”, which appears to be a reference to Campbell v Daejan Properties , but noted that it was “ on the face of it, a serious consequence ”.

25. In contrast, he said at [31] if the provisional charge procedure is not read as imposing a precondition, “…and if it can be bypassed, then what is lost to the tenant are any benefits which follow from the provisional charge process ”, which he noted as: the right to the additional information required to be set out in the PCN but not the Final Notice; the right to receive that additional information in advance; the right to be consulted; and the right to raise an objection and to seek to argue that objection before an independent surveyor (but not, on his findings, a right to a binding decision from a surveyor or the right to have the works halted while the matter is being looked at).

26. At [32] he distinguished Northways Flats Management Co (Camden) v Wimpey Pension Trustees [1992] 2 E.G.L.R. 42 from the present case . In Northways Flats , the ADR mechanism was mandatory and binding, whereas he had found that the Schedule 5 ADR mechanism in the Previous Lease was not. He nevertheless accepted that the right to be consulted was of value.

27. He expressed at [33] his view that the consequences to the appellant tenant if the PCN is not a precondition for recovery are “ real but much less severe ” than the “ potentially severe ” consequences for the respondent landlord if the PCN is a precondition for recovery, and so this factor favours the respondent, although he described it in [34] as “ finely balanced ”.

28. At [35], he held that paragraph 5-1 envisages service at the outset of the process: it refers to work which “ should be carried out ” and to “ estimated costs ”. However, unlike some authorities, the lease did not expressly require the notice to be served before contract, commencement of works, or any other cut-off point. He rejected a before-commencement cut-off as highly unlikely, especially in urgent works cases, and considered a before-completion cut-off to be vague, saying “ What would it mean? Would it mean substantially completed, or would it mean after snagging work?”

29. At [36], he accepted that Schedule 5 envisages a staged process: provisional notice, possible ADR, completion of works, and then Final Notice. But he repeated that nothing in Schedule 5 required works to be stopped or paused at any stage.

30. At [37], he considered the effect of the appellant’s construction: if a PCN were a precondition and could not be served late, a landlord might be unable to recover the cost of urgent works through no fault of its own. He held that this was “ not something the parties should be taken to have intended when they entered into the agreement ”.

31. At [38], he held that the prejudice to the tenant from allowing late service was limited. On the facts of this case, he noted, by 14 June 2024 the appellant had all required information about the cost, the proportion sought, and the calculation, and could have entered the ADR process. The only prejudice to them by late compliance was “ the right to raise a fully informed objection at an earlier stage ”.

32. At [39], he concluded that service of a PCN was mandatory in the sense that it had to occur before any Final Notice was served, but there was no cut-off point for serving it. Accordingly, the notices served by the respondent on 14 June 2024 were effective.

33. At [40], he added an alternative conclusion: if he was wrong and on a proper construction there was a cut-off point, paragraph 5-1 should not be read as imposing a necessary precondition to service of a Final Notice, “ because of the potential consequences of construing the lease otherwise ”. F. Ground 1 Submissions on Ground 1 Appellant’s submissions

34. The Appellant submits that the natural and ordinary meaning of the words “ If and whenever the Landlord believes or is advised that work should be carried out pursuant to clause 4.2 the Landlord must serve on the Tenant a notice ” is that the PCN must be served before the works are completed.

35. The Appellant submits that on the true construction of the Previous Lease, the mechanism provided by the scheme of Schedule 5 is: i. That service of the PCN by the landlord is mandatory (paragraph 5-1 “ the Landlord must serve ”) ii. If there is no dispute (the tenant reasonably believes the landlord’s decision is fair and reasonable), then: a) the tenant must pay the proportion of the estimated cost of the work provisionally determined to be payable by the tenant (the “ Provisional Charge ”) within 28 days, provided that they are not obliged to pay before the landlord has commenced the works (paragraph 5-2.1); b) once the tenant has paid the Provisional Charge the Landlord must proceed diligently with the works (paragraph 5-2.2); c) after the work has been carried out, the landlord serves a Final Notice on the tenant (paragraph 5-3); d) the landlord refunds any excess or the tenant pays any shortfall within 14 days (paragraph 5-4). iii. If there is a dispute because the tenant reasonably believes the landlord’s “ decision ” is not fair and reasonable, the landlord and tenant shall seek to agree “ any issues ”, and if they cannot, they may refer “ any matter ” to expert determination by a surveyor (paragraph 5-5)

36. The Appellant submits that as a matter of ordinary language, therefore, a PCN cannot be served after the works have been completed, because the language used in the scheme mandates a PCN to be served “ If and whenever the Landlord believes or is advised that work should be carried out ”. That locates the date of service as before the works are commenced, and certainly before they are completed, but a date after the works have been completed is not a date when the landlord believes or is advised that work should be carried out, in ordinary language. The Appellant submits that this is supported: i. by the prescribed contents of the PCN, requiring as paragraph 5-1 does, the “ estimated cost ” of the work and the proportion “ provisionally determined ” to be payable by the tenant, neither of which exist once the work has been completed; by definition, the notice will include the actual and not estimated cost of the work and the proportion finally determined to be payable by the tenant, not provisionally determined to be payable by the tenant. ii. by the fact that the Final Notice is required to be served, pursuant to paragraph 5-3 of Schedule 5, “ As soon as convenient after the work has been carried out ” and is to include the “ actual cost of the work ” and “ the proportion of the cost of the work that is payable by the Tenant ”. The Appellant submits that the judge’s construction largely deprives paragraph 5-1 of meaning, in that there would, practically, be no difference between a PCN served after completion of the works and a Final Notice. It would also enable the unlikely result that both could be served on the same day, notwithstanding the judge’s earlier conclusion that the Final Notice presumes the presence of a prior PCN.

37. The Appellant submits that the judge’s reasoning at [35] of the transcript that “ the lease does not state that notice must be served before the landlord enters into any contract or starts any work. Neither does it specify any cut off point .” is an incorrect analysis. It submits that the judge erred by placing undue emphasis on the alleged difficulty of identifying when works have been carried out because: i. the definition of ‘Final Notice’, which is to be served after the work has been carried out pursuant to Schedule 5 paragraph 5-3, presumes that the parties to the lease agreed such a date could be ascertained as that is the trigger for a Final Notice to be served; ii. phrases such as “ after the work has been carried out ” are ordinary words which the courts have not found to present them with any difficulty in a landlord and tenant context: see, for example, Coldunell Ltd v Hotel Management International Ltd [2022] EWHC 1290 (TCC) where at [38] the date that works were carried out determined whether a landlord’s claim is for the reasonable cost of the works or diminution in value in the context of the common law measurement of damages in dilapidations. The Appellant submits that the fact that there could be some ambiguity in identifying the precise moment in time that works “ have been carried out ” does not prevent the phrase from having utility; iii. such difficulty does not arise where the landlord has served a PCN before any of the conceivable dates for completion of works, such as issue of a certificate of practical completion, the remediation of snagging, or the presentation of a final invoice from the contractor; iv. if the landlord were to serve a Final Notice too early, this would be of little consequence as neither party is advancing a construction whereby the landlord only has one chance to serve a valid Final Notice following the service of a PCN.

38. The Appellant submits that the judge also erred by giving undue emphasis to the extreme case of very urgent works, rather than the more ordinary repair works which the present case involved. The Appellant submits that if the judge had applied his mind more fully to the latter, he should have concluded that commercial common sense was on the side of the Appellant’s construction, because the Respondent landlord loses nothing in these circumstances, while the Appellant tenant is deprived of information and access to the dispute resolution mechanism provided by Schedule 5, paragraph 5-5. In addition, the Appellant submits: i. Even if works need to start immediately, the landlord could still serve a PCN before they are completed as the requirements for a valid PCN are minimal and, as the judge below noted, nothing in the Lease prevents the landlord from carrying out the works even while the dispute resolution process is pending, if that is invoked; ii. It is evident that the parties to the Previous Lease did have urgent works in their contemplation in the operation of Schedule 5, because paragraph 5-5 provides for the parties to resolve their differences “ within sixty (60) days or such shorter period as is reasonable in all the circumstances ”; iii. Even if the landlord could not serve a notice before the completion of the works, a landlord and tenant can agree, by the service charge provisions in the lease, to put recovery of the cost of the same out of the landlord’s power. See Northways Flats . There is no presumption in construing a lease that the service charge provisions will enable the landlord to recover all of their expenditure ( Campbell v Daejan Properties at [56]); iv. In emphasising the extreme case, the judge below overlooked the usual case, as most works will not be so urgent. In this case, the only reason why a PCN was not served before the works were completed was carelessness on the Respondent’s part. The judge should have considered the prejudice to the Appellant caused by the Respondent’s construction to be greater than the prejudice caused to the Respondent by the Appellant’s construction, and should not have construed the Lease in such a way that the Appellant lost its valuable rights to object to the Respondent’s decision to carry out the works and apportion the costs that the tenant is to pay and to invoke the dispute resolution procedure and refer “ any matter ” for expert determination by a surveyor. In doing so he allowed the Respondent to benefit from its own carelessness. Respondent’s submissions

39. The Respondent submits that on a proper application of the principles in Arnold v Britton , the provisions of Schedule 5, in particular paragraphs 5-1 and 5-3, are not a condition precedent to the Appellant’s liability under paragraph 4-4.1 of Schedule 4, but are independent obligations. The use of the words “ subject to ” in paragraph 4-4.1 does not elevate Schedule 5 to a condition precedent.

40. It argues that the structure of Schedule 5 is one that allows the Respondent to receive payments on account, but is framed entirely with reference to the provisionality of the notices, charges and proportions of charge which fall to a tenant: i. The proportion of any cost payable under a PCN is only a “ provisional determination ” (paragraph 5-1.3); ii. The tenant has the option to either pay the provisional charge or instigate the dispute resolution clause at paragraph 5-5; iii. Nothing within Schedule 5, and particularly the dispute resolution clause at paragraph 5-5, prevents the landlord from commencing, continuing or completing any works whilst steps are being taken under Schedule 5, as the judge found at first instance; iv. Only issues as to any provisional charge fall within the purview of the dispute resolution mechanism. There is no means for the tenant to refer any dispute about a Final Notice (or for that matter a written demand pursuant to paragraph 4-4.1 of Schedule 4) to expert determination; v. The dispute resolution clause permits the tenant to challenge the payment of money on account. The outcome is not binding, and that is for good reason. It does not affect the Respondent’s ability to serve a Final Notice that disregards any determination under paragraph 5-5 of Schedule 5, and it has no bearing at all on any Final Notice served in accordance with paragraph 5-3 of Schedule 5.

41. The Respondent also relies on the difference in payment periods provided for payments pursuant to paragraph 4-4.1 of Schedule 4, which provides that “ Subject to the provisions of Schedule 5 the Tenant must pay to the Landlord within twenty eight (28) days of receipt of a written demand a fair proportion to be determined by the Surveyor, acting as an expert and not as an arbitrator, of any sums that the Landlord may become liable to pay in connection with the performance of its covenants contained in clause 4.2… ” and any excess which may be payable by way of a shortfall between the Provisional Charge and the Actual Charge set out in the Final Notice (within 14 days of service of the Final Notice per Schedule 5, paragraph 5.4). It submits that if there was not intended to be some difference between a written demand under paragraph 4-4.1 of Schedule 4 and a Final Notice under paragraph 5-3 of Schedule 5, it is difficult to reconcile the different requirements. Although the judge below noted that this point gave “ some support to the Respondent’s case ”, he concluded that the reference to 28 days in paragraph 4-4.1 of Schedule 4 was a typographical error. The Respondent submits that it is hard to see that the reference to “ twenty eight (28) ” in both words and figures is a typographical error.

42. The Respondent also notes that paragraph 4-4.2 of Schedule 4 requires the Appellant to comply with its payment obligations in Schedule 5 as independent from any obligation under paragraph 4-4.1 of Schedule 4, and submits that such wording would be otiose if they were not separate routes.

43. The Respondent submits that service of a written demand without recourse to Schedule 5 does not deprive the tenant of any of the same rights or defences it would have in respect of a Final Notice, because although it means that payment of a provisional sum up front cannot be challenged, the quid pro quo is that the landlord is required to fund the works itself before receiving anything from the tenant.

44. The Respondent submits that the judge gave a reasoned conclusion at paras 35 – 37 of the transcript of judgment which supports his overall conclusion that a PCN may be served retrospectively, whereas on the Appellant’s own reasoning there would still be a number of candidates for the date after which it would not be possible to serve a PCN, demonstrating that there is ambiguity in the terms and how they may be interpreted.

45. In relation to the “ urgent works ” point, the Respondent submits that the judge below was entitled to consider that sort of situation when construing the lease for all purposes. He noted that the differences between the language of the lease and the authorities relied on by the Appellant meant that the Appellant’s contention that a PCN must be served before works commenced did not fit with a need for urgent work to be carried out, and this was both a valid consideration and a conclusion which he was entitled to reach. Discussion and determination of Ground 1

46. I accept the Appellant’s submission that, on the natural and ordinary meaning of Schedule 5 paragraph 5-1, a PCN is concerned with contemplated or ongoing works, not completed works. The opening words “ If and whenever the Landlord believes or is advised that work should be carried out pursuant to clause 4.2 ” are framed by reference to a point in time when works are prospective, and the landlord believes or is advised they “ should be carried out ”. Although the natural and ordinary meaning could fairly easily encompass ongoing works before those works are completed, they are not, in my judgment, apt to describe a situation in which the works have already been carried out. That strains the language in a way which I do not consider to be either natural or ordinary.

47. Lord Justice Jackson put it, pithily, at [37] of Campbell v Daejan Properties , as follows: “ In construing a written contract, the governing principle is that the parties mean what they say. The court must give effect to the express terms of the contract and must resist the temptation to redraft or improve upon those terms ”, although he did, of course, note that there were exceptions to that governing principle, including where there was an obvious clerical error, grammatical or other clear mistake which the court will correct as a matter of contractual construction. As Lord Hoffman put it at [14] of Chartbrook v Persimmon , referring to the House of Lords judgment in Investors Compensation Scheme Ltd v West Bromwich Building Society , “ The House emphasised that ‘we do not easily accept that people have made linguistic mistakes, particularly in formal documents’… but said that in some cases the context and background drove a court to the conclusion that ‘something must have gone wrong with the language’. In such a case, the law did not require a court to attribute to the parties an intention which a reasonable person would not have understood them to have ”.

48. I do not consider that I am driven to the conclusion that something has gone wrong with the language. That is because that construction is reinforced by other provisions of the lease, including those which prescribe the contents of the PCN. Paragraph 5-1 of Schedule 5 requires the notice to state the “ estimated cost ” of the works and the proportion “ provisionally determined ” to be payable by the tenant. Those expressions, too, are forward-looking. Once the works have been completed, the costs of the works are no longer estimated but the actual costs are known, and the proportion payable by the tenant is no longer provisionally determined but finally determined. That is precisely what paragraph 5-3 of Schedule 5 provides is to be contained in a Final Notice.

49. I also find that the obligations in the Lease, and Schedules 4 and 5 of the Previous Lease are deliberately structured for the various purposes of: (i) giving the tenant by way of a PCN such advance information as may be possible of works the landlord believes or is advised should be carried out, the estimated cost of those works and the proportion provisionally determined to be payable by the tenant; (ii) to give the tenant the right to object to the provisional notice and for either party to refer any issues to a surveyor; and (iii) enabling the landlord to obtain payment of monies in advance of completion of works (but after works have started) when a tenant considers that a PCN is fair and reasonable or the ADR process has assisted the tenant in agreeing to make such an advance payment. If a PCN can be served after completion of the works, those purposes which are for the benefit of the tenant are undermined. It will have no advance information, there will be little practical purpose in objecting, and the ADR process will be deprived of much of its utility if a Final Notice is served at the same time or shortly afterwards. That is not the scheme which Schedule 5, read as a whole, was intended by the parties to put in place, in my judgment.

50. I therefore do not accept that the absence of an express cut-off date means that a PCN may be served after completion. The cut-off is, in my judgment, supplied by the structure and language of Schedule 5 itself. Paragraph 5-1 deals with the stage at which it is believed or advised works should be carried out, and their cost and the tenant’s proportion of that cost is estimated; paragraph 5-3 deals with the stage after the works have been carried out, the actual cost is known and the tenant’s proportion finally determined.

51. It follows that I do not consider that the relevant provisions are ambiguous in any sense material to Ground 1. The language of paragraph 5-1 of Schedule 5, read with the prescribed contents of a PCN and with paragraph 5-3 of Schedule 5, draws a clear distinction between works which are prospective or ongoing, and works which have already been carried out. To the extent that there may be factual uncertainty in a particular case as to the precise date on which works have been “ carried out ”, that does not render the distinction ambiguous, or justify the judge’s conclusion, in my judgment. The Previous Lease itself uses that concept in paragraph 5-3 of Schedule 5 as the trigger for the Final Notice. The reasonable person with the knowledge of the parties at the time of the Lease (which incorporates the Previous Lease) would therefore have understood the parties to mean that the point at which works have been “ carried out ” could be identified sufficiently for the purposes of the contractual machinery.

52. The failure to specify, for example, practical completion, snagging, or final invoice by a contractor seems to me most likely to be deliberate, as it is difficult to think of one term that is appropriate in all circumstances and all projects of work, whether big or small. Some smaller works may not have a defined practical completion date and will simply be “ carried out ”. Not all works will have a snagging stage, and even for those that do, if a snagging list is minimal and consists of a few trivial matters a landlord may reasonably consider that the works have been “ carried out ” in a way that may not be reasonable for works which have produced a significant snagging list requiring extensive remediation. The potential for uncertainty or dispute about whether in any given situation the work has been “ carried out ” does not alter the basic distinction drawn by Schedule 5 between prospective works and works which have been carried out.

53. I also consider that the judge below placed too much weight on the example of urgent works. As he found (correctly, in my judgment), the Lease does not require the landlord to suspend or delay urgent works while any dispute under paragraph 5-5 of Schedule 5 is sought to be resolved. On the judge’s own analysis, the landlord may proceed with the works notwithstanding any ongoing dispute resolution process. The possibility of urgent works therefore does not require paragraph 5-1 to be construed as permitting a PCN after completion. In many cases the information required for a provisional notice will be capable of being assembled quickly, particularly where the landlord is already in a position to instruct a contractor.

54. Nor do I consider that considerations of commercial common sense point the other way. The construction that I have reached is not commercially incoherent. It gives effect to a staged mechanism under which the tenant receives advance information and an opportunity to object, while the landlord remains free to commence and continue the works, including urgent works, without awaiting the outcome of any dispute resolution process. That allocation of rights and risks is not uncommercial. It may in some cases operate harshly against a landlord who has failed to serve a timely notice, but that is not a sufficient reason to depart from the natural meaning of the words used, per Campbell v Daejan at [56] citing Rapid Results College v Angell [1986] 1 EGLR 53 at 55 col 1.

55. For those reasons, I conclude that the judge was wrong to hold that there was no cut-off point for service of a PCN. On the true construction of Schedule 5, a PCN must be served before the works have been carried out. Ground 1 therefore succeeds. However, that conclusion does not of itself determine whether timely service of a PCN is a condition precedent to recovery. That is the subject of Ground 2 to which I now turn. Ground 2 Appellant’s submissions

56. The Appellant submits that by deciding in the alternative that, if he was wrong to decide that a PCN can be served after the works have been carried out, then service of such a notice is not a condition precedent to the service of a Final Notice, the judge was “ transparently attempting to avoid ” the situation where the Respondent could not recover service charges from the Appellant by reason of its failure to serve a PCN before the works were completed.

57. By allowing considerations of the commercial result to override the natural and ordinary meaning of the language of the lease, which he previously had found supported the Appellant’s construction, the Appellant submits the judge below essentially re-wrote the parties’ agreement contrary to the guidance of Lord Neuberger at [20] and [77] of Arnold v Britton , and in doing so fell into error.

58. The Appellant submits that in balancing the parties’ competing constructions, the judge below also undervalued the benefit to the Appellant of compliance with Schedule 5 of the Previous Lease, namely the ability to gain information and invoke the dispute resolution procedure, which only operates with respect to paragraph 5-1 and the PCN, there being no mechanism for the Actual Charge in a Final Notice to be referred to a surveyor. The Appellant submits that the lack of such a mechanism suggests that the parties envisaged that by the time a Final Notice was served, either there would be no issue with the Provisional Charge or that any matters in dispute or contention had already been agreed or resolved pursuant to the ADR mechanism. However, without the service of a PCN, the ADR mechanism in the contractual scheme is not available to the parties.

59. Further, the Appellant submits that the judge’s construction would deprive Schedule 5, paragraphs 5-1, 5-2 and 5-5 of much of their effect, contrary to the reasonable assumption that the parties intended: (i) the whole of the Lease to be effective; and (ii) non-compliance to be subject to some sanctions. Respondent’s submissions

60. The Respondent takes issue with the Appellant’s characterisation of the judge at first instance “ transparently trying to avoid ” the consequence that it would be unable to recover service charges, saying that the transcript discloses that he took a careful and considered approach to his assessment, and in a case such as this where there was ambiguity as to the meaning of the provisions of the Previous Lease and more than one reasonable interpretation, the judge was entitled to prefer the construction which was more commercially sensible.

61. He was also entitled to distinguish on the facts the authority of Northways Flats relied on by the Appellant and, although he did not mention CIN Properties Ltd v Barclays Bank Plc [1986] 1 EGLR 59 , the clauses relied on by the Appellant were cast in very different terms so the effect of compliance or non-compliance was quite different. Accordingly, he cannot be criticised for not relying on CIN Properties as the Appellant invited him to do.

62. The Respondent relies on the arguments it made in respect of Ground 1 to submit that the parties cannot have intended that the Respondent would be unable to recover the actual cost of works that directly benefit the Appellant simply because the Respondent did not serve a PCN before the works completed. Discussion and determination

63. I am with the Appellant on Ground 2 and accept its submissions. In my judgment, as I have construed the Leases pursuant to Ground 1 to find that a PCN must be served before the works have been carried out, it follows that the issue under Ground 2 is whether that requirement is merely procedural or whether it is a necessary precondition to the service of a Final Notice and to recovery of charges under the Schedule 5 contractual scheme.

64. The starting point is again the language and structure of the Leases. Schedule 4 paragraph 4-4.1 provides that the tenant’s obligation to pay a fair proportion of the costs of the works is “ subject to the provisions of Schedule 5 ”. Schedule 5 paragraph 5-1 provides that, if and whenever the landlord believes or is advised that works should be carried out pursuant to clause 4.2, “ the Landlord must serve ” a PCN containing the information specified in paragraphs 5-1.1 to 5-1.4. That is a mandatory requirement, not words of mere aspiration or administrative convenience.

65. Further, paragraphs 5-3 and 5-4 of Schedule 5 are drafted on the assumption that there has been prior compliance with paragraph 5-1. Paragraph 5-3 requires the Final Notice to state, amongst other things, “ the difference between the Provisional Charge and the Actual Charge ”. Paragraph 5-4 then provides for repayment of any excess by the landlord or payment of any shortfall by the tenant, by reference to the relationship between the Provisional Charge and the Actual Charge. Those provisions are difficult to operate without a PCN having first been given, and in my judgment the reasonable person with the knowledge of both parties at the time of the entry into the Leases would not understand from the language used that they were intended to operate without a PCN having first been given.

66. That structure is consistent with the purposes of the scheme which I have identified in my discussion of Ground 1. The PCN is not simply a step by which the landlord may choose to seek payment on account. It is the mechanism by which the tenant is given advance information about the works, their estimated cost, the proportion provisionally determined to be payable by the tenant, and the paperwork showing how the expense has been calculated. It is also the mechanism which enables the tenant to raise an objection, and if considered appropriate, for either party to engage the dispute resolution process in Schedule 5 paragraph 5-5.

67. I have stated that I agree that the Schedule 5 paragraph 5-5 procedure does not require the landlord to suspend the works, and I also accept the conclusion of the judge below that the surveyor’s decision is not expressly made binding by the terms of the Lease. Those points, however, do not in my view deprive the dispute resolution procedure of contractual significance or of value. The right to information, the right to object and the right to refer matters to a surveyor are real contractual rights with value, and they are not to be treated as valueless merely because works may continue or the surveyor’s conclusion is not stated to be finally binding.

68. It follows from what I have said that I do not accept the Respondent’s characterisation of the PCN procedure as merely a machinery for obtaining an optional payment on account. As I hope I have explained, that is not how Schedule 5 is drafted. The opening requirement of paragraph 5-1 is mandatory. Paragraphs 5-2, 5-3, 5-4 and 5-5 all proceed on the basis that a PCN has been served. The landlord’s ability to serve a Final Notice under paragraph 5-3 is part of the same staged process, not an independent route detached from the paragraph 5-1 notice. The judge below recognised at [28] of the transcript of his judgment that the terms favoured the Appellant on this point. In my judgment, the careful drafting and structure of Schedule 5, to which the Appellant’s liability to pay is expressly made subject, is not outweighed by the consequences for the landlord of failing to serve a PCN before a Final Notice. They are the contractual scheme to which the parties agreed when they signed the Lease.

69. I also accept the Appellant’s submission that the judge’s alternative conclusion appears from his reasoning to have been driven, principally, by the seriousness of the consequence for the landlord if a PCN had not been served before a Final Notice, and that has caused him to reach an incorrect conclusion. The consequences to the landlord in the circumstances of this case are, of course, a matter of practical concern on my construction of the Lease, but I accept the Appellant’s submission that it is not a sufficient basis for overriding the natural and ordinary meaning of the words of the Lease. As Lord Neuberger emphasised in Arnold v Britton , the court’s task is to identify what the parties agreed, not what the court considers they ought to have agreed. The fact that the agreed machinery may operate harshly against a landlord who has failed to comply with it is not, without more, a reason to rewrite it.

70. Finally, I do not consider that commercial common sense points to a different result, for largely the same reasons as I have given pursuant to Ground 1. The construction for which the Appellant contends is not commercially incoherent but sets out a contractual bargain reached between these parties, under which: i. the landlord is required to provide information before completion of the works; ii. the tenant is given an opportunity to object or obtain the assistance of the contractual dispute resolution process; iii. the landlord is entitled to commence and carry out the works, including urgent works, without waiting for that dispute resolution process to conclude; and iv. in the absence of any dispute or if the dispute is resolved before the works conclude, the landlord benefits from advance payment.

71. In my judgment that is a rational and commercially justifiable allocation of rights and risks. It does mean that a landlord who fails to serve a PCN before completion of the works cannot recover those costs through the Schedule 5 Final Notice mechanism, but that is also a commercially justifiable risk.

72. I have also considered the Respondent’s submission that the absence of a binding ADR mechanism distinguishes this case from authorities such as Northways Flats and CIN Properties . It is a distinction, but not one which changes the analysis, in my view. The point is not that paragraph 5-5 of Schedule 5 gives the tenant the same rights as the tenant enjoyed in those cases (it plainly does not), but that the rights conferred by paragraph 5-1 and paragraph 5-5 are part of the contractual machinery which the parties chose to include. If service of a PCN is not treated as a precondition, those provisions are substantially deprived of practical effect.

73. For those reasons, I conclude that the judge was wrong to hold, in the alternative, that if a PCN could not be served after completion of the works, service of a PCN was not a necessary precondition to the service of a Final Notice. I am satisfied that on a true construction of Schedule 5, service of a valid PCN before the works have been carried out is a necessary precondition to the service of a Final Notice under paragraph 5-3 and to recovery under the Schedule 5 Final Notice. Ground 2 therefore also succeeds. Respondent’s Ground

74. In light of my conclusions on Grounds 1 and 2, it remains necessary to determine the Respondent’s Ground. If the Respondent is right that Schedule 4 paragraph 4-4.1 provides an independent route to recovery, the judge’s order may nevertheless be upheld on that different basis. If the Respondent is wrong, the Appellant’s success on Grounds 1 and 2 disposes of the appeal. Submissions

75. The Respondent repeats its submissions summarised earlier, in support of the Respondent’s Ground. In summary, it submits that Schedule 4 paragraph 4-4.1 and Schedule 5 provide separate routes to recovery; that the words “ subject to the provisions of Schedule 5 ” do not make Schedule 5 a condition precedent; that Schedule 5 is concerned only with provisional payments on account; that paragraph 4-4.2 would otherwise be otiose; and that the different payment periods in Schedule 4 paragraph 4-4.1 and Schedule 5 paragraph 5-4 support the existence of separate routes.

76. The Appellant submits in response, in summary, that the Respondent’s construction deprives the words “ subject to the provisions of Schedule 5 ” of real effect. It submits that Schedule 5 is the agreed contractual machinery governing liability for this category of costs, and that an independent Schedule 4 route would allow the landlord to avoid the PCN procedure altogether. Discussion and Determination

77. I am not with the Respondent. As I have already explained in relation to Grounds 1 and 2, the starting point is the language and structure of the Leases. Schedule 4 paragraph 4-4.1 provides that the tenant must pay a fair proportion of the relevant costs “ subject to the provisions of Schedule 5 ”. In my judgment those words are clear and important. They do not naturally suggest that Schedule 4 paragraph 4-4.1 provides an independent route to recovery which may be used without compliance with Schedule 5. They indicate that the obligation to pay under Schedule 4 is qualified by, and dependent upon, the machinery set out in Schedule 5.

78. That conclusion is reinforced by the opening words of Schedule 5 paragraph 5-1. If and whenever the landlord believes or is advised that work should be carried out pursuant to Clause 4.2, “ the Landlord must serve ” a PCN. That is mandatory language. It is also language which applies to the very category of costs with which Schedule 4 paragraph 4-4.1 is concerned, namely sums which the landlord may become liable to pay in connection with performance of its covenants under Clause 4.2.

79. I therefore agree with the judge below that Schedule 5 is intended to be the single gateway for recovery of the relevant costs. To construe Schedule 4 paragraph 4-4.1 as providing a separate, free-standing route to payment would in my judgment sit uneasily with both the words “ subject to the provisions of Schedule 5 ” and the mandatory language of paragraph 5-1.

80. It would also undermine the structure and purposes of the scheme which I have identified above. Schedule 5 provides for a staged process as already set out. If Schedule 4 paragraph 4-4.1 provided an independent route to recovery, the landlord could bypass that staged process altogether. That would substantially deprive Schedule 5, including the mandatory requirement in paragraph 5-1, of practical effect.

81. I do not consider that commercial common sense requires, or even supports, such a construction. The Respondent’s construction would permit the landlord to avoid the very protections which Schedule 5 was designed to confer on the tenant, while still obtaining recovery of the same category of costs. That is not, in my judgment, the natural reading of the Leases. Nor is it necessary in order to make the contractual scheme commercially workable. The scheme remains commercially coherent on the construction I have adopted: the landlord may recover the relevant costs, but only by complying with the procedure to which the tenant’s liability is made subject.

82. I have considered the Respondent’s reliance on the difference between the 28-day payment period in Schedule 4 paragraph 4-4.1 and the 14-day payment period in Schedule 5 paragraph 5-4. I accept that this point gives the Respondent some support, as the judge below recognised. I am less confident than the judge below that the reference to “ twenty eight (28) days ” can simply be described as a typographical error. It may be a drafting inconsistency, or it may reflect imperfect drafting of the relationship between Schedules 4 and 5. But in my judgment it cannot bear the weight which the Respondent seeks to place upon it.

83. In particular, the different payment periods are not sufficient to overcome the express words “ subject to the provisions of Schedule 5 ”, nor the mandatory requirement in Schedule 5 paragraph 5-1 that the landlord must serve a PCN. The court should not search for or construct ambiguity from a drafting infelicity where the substantive structure of the provisions is otherwise clear. Whether the 28-day period is an error, an inconsistency, or a remnant of an earlier draft, it does not justify construing Schedule 4 paragraph 4-4.1 as creating an independent route to recovery.

84. I also do not accept the Respondent’s reliance on Schedule 4 paragraph 4-4.2. The fact that paragraph 4-4.2 requires the tenant to observe and perform the obligations on its part set out in Schedule 5 does not, in my judgment, demonstrate that paragraph 4-4.1 and Schedule 5 are separate routes. It is at least equally consistent with the Leases identifying Schedule 5 as the procedural machinery governing the tenant’s liability for the relevant costs. It does not displace the express “subject to” wording in paragraph 4-4.1.

85. Nor do I accept the Respondent’s submission that service of a written demand under Schedule 4 paragraph 4-4.1 without recourse to Schedule 5 would not deprive the Appellant of any relevant rights or defences. It clearly would. It would deprive the Appellant of the rights I identified as real contractual rights of value in my discussion of Ground 1 above: the right to have advance information and an opportunity to object conferred by Schedule 5 paragraph 5-1 and paragraph 5-5.

86. For those reasons, I conclude that Schedule 4 paragraph 4-4.1 does not provide an independent route to recovery of the relevant costs outside the machinery of Schedule 5. The judge was right to reject the Respondent’s argument on Issue (a). The Respondent’s Ground therefore fails.

87. It follows that, since Grounds 1 and 2 succeed and the Respondent’s Ground fails, the appeal must be allowed and the underlying claim dismissed.