Mr Justice Mansfield: Introduction

1. The Claimants own a home called The Cottage at The Green, Wrenbury in Cheshire (“the Property”). The Green is a highway maintainable at public expense, for which the Defendant is the relevant highway authority.

2. On many occasions from around 2012 to late 2024 the front driveway and garden of the Property (but, fortunately, not the house itself) flooded as a result of water running off The Green. The Claimants raised the matter with the Defendants on numerous occasions over the years. The Defendant attended on various occasions, but the problem was not remedied until late 2024.

3. The Claimants brought a claim in the Chester County Court in private nuisance. The claim was tried by Mr Recorder Shaw (“the Judge”) on 17-19 September 2025. The Judge gave judgment in favour of the Claimants, finding the Defendant liable in nuisance. He awarded damages in the sum of £42,500. That figure comprised in part loss of value of the Property and in part loss of amenity in respect of both Claimants.

4. The Defendant now appeals the Judge’s decision both as to liability and quantum. Permission was granted on paper by Bright J on 20 March 2026.

5. The Grounds of Appeal allege errors of law in and challenge a variety of factual findings of the Judge. They also raise a series of procedural grounds, alleging unfair handling of the trial by the Judge. Background Facts

6. The village of Wrenbury is near Nantwich, in Cheshire. It is in a part of East Cheshire that sits on a floodplain. The Green starts as two “arms” of road running along two sides of the village green; those arms converge into a single “stem” which runs out of the village and ends ultimately in a field. The “stem” part of The Green is a residential cul-de-sac with houses on either side of the road. One of those is the Property.

7. The overall gradient along The Green runs away from the village green and towards the field. There is also a gradient across the road: the Property is at a lower level than the houses on the opposite side of the road. The front garden of the Property is lower than the level of the road.

8. A highway drain runs beneath The Green, served by 7 gullies, two of which are “uphill” from the Property. “Downhill” from the Property the drain runs into the field at the end of The Green. There it runs close to two willow trees in the field. An expert examination noted that downhill from the Property the diameter of the drain reduced from 150mm to 100mm, a design which the experts agreed was unusual.

9. There have been repeated instances of flooding of the front of the Property since 2012. The Claimants had occupied the Property for many years prior to 2012, with no such flooding. As at the time of trial (September 2025) there had been no flooding since late 2024, when the Defendant carried out jetting of the drain and gullies, despite instances of very heavy rain in 2025.

10. No other property on The Green had this flooding problem.

11. The Claimants complained to the Defendant on many occasions from 2012. The Defendant carried out investigations and took some steps to clear the drains. That did not lead to a solution – until, it appears, late 2024.

12. The Defendant’s case was that it had taken reasonable steps to prevent flooding. It relied on the steps it had taken, and on its limited resources with which to deal with extensive flooding risk in its area. The Defendant has 104,000 gullies; 28,000 properties at risk of interior flooding from surface water; 5,000 properties at high risk of riparian flooding and finite resources. The Judgment

13. The Judge heard from Mr Eaton and from three witnesses on behalf of the Defendant – Mr Branton, Mr Metcalfe and Mr Cook. He dealt with the evidence at paragraphs 12-31. He found all of the witnesses of fact to be straightforward and honest (Judgment paragraphs 15 and 18). There was little dispute on the primary facts (save in relation to damages issues); such disagreements as there were related more to the absence of evidence on certain matters, and the interpretation to be placed on the facts. The Judge also had written evidence from experts on both sides as to the drainage system. That included a joint report. The Judge summarised the key points from the joint report at paragraph 30 of the Judgment. I do not understand there to be any issue as to the Judge’s treatment of the expert drainage evidence.

14. The experts noted that the reduction in pipe diameter was very unusual and could constrict flow. However, they said it would be overly simplistic to conclude that the change in diameter was the single cause of the flooding problem. Restrictions within the pipe from tree roots or other debris were likely to have been a contributory factor. Maintenance to clear gulleys, jet the system and clear roots was likely to have cleared any residual old tree roots.

15. The Judge also referred to a valuation report of Mr Spencer, a chartered surveyor (Judgment paragraph 31). The status of that report is in issue in the appeal as to quantum. I will return to that below.

16. The Judge summarised the relevant law at paragraphs 32-37. He referred to Vernon Knights Associates v Cornwall Council [2013] EWCA Civ 950 [2014] Env LR 6 as summarising the law on private nuisance in a flooding case of this kind. There is no suggestion that he erred in doing so. I will return to that case in setting out the legal framework below.

17. The Judge set out his what he described as his “core findings” and “primary findings of fact” at paragraphs 39-43. I summarise as follows: i) There had been no flooding between 1983 and 2012. From 2012 there was annual flooding, until the end of 2024. The front garden was flooded at least 20 times over 13 years. Many of the floods were significant. ii) The Defendant had known about the flooding issue for 13 years. The Claimants had made regular complaints. iii) “ The council’s response has, in virtually all respects, been entirely reactive and no apparent proactive steps have been taken. The pattern of regular maintenance that has been in place for the last decade is limited to gulley maintenance.” (Paragraph 41). The Judge also mentioned in the same paragraph the cutting back of the trees on adjoining land, which were now growing back. iv) There has been one CCTV survey and two instances of jetting. v) The most recent jetting in November 2024 was effective as there was no further instance of flooding after that. vi) The Defendant had reduced gully maintenance from three times annually to once every three or four years.

18. The Judge then stated his conclusions in the following key paragraphs (Judgment paragraphs 44-46):

44. I am quite satisfied on the evidence that the regular flooding to the claimants’ property over the years has amounted to a private nuisance. I accept, of course, that there is no duty upon the local authority to construct anything on the claimants’ property or to undertake significant engineering works, whether to increase the pipe size to a uniform 150mm or otherwise. But the local authority has known about the issue of excess water pooling outside the claimants’ property and, when it reaches a critical level, then escaping on to the claimants’ property for over a decade now. Whether that water is surface water or highway water is, in my judgment, irrelevant. It is water that is being allowed (in the words of the defence “tolerated”) by the defendant to escape onto and damage the claimants’ property.

45. It has been the defendant’s choice to sit back and do nothing and were there to be in place an adequate, reasonable and appropriate system of maintenance in place for the drainage, then, in my judgment, this claim might well have had a very different outcome. But clearly, the steps and maintenance undertaken by the defendant has been far from reasonable and far from adequate. It cannot be reasonable or adequate for the flooding to continue regularly and significantly for over a decade until, finally, the maintenance works included the jetting works in 2024, which, when coupled with the earlier request of the neighbour to chop down the willow trees in 2019, has brought some measure of relief for the claimants.

46. In all the circumstances, I do not find that the local authority has established its section 58 defence or any other defence to this claim. In reaching that conclusion I have had carefully to reflect upon the stretched financial budget of the local authority, the huge area it covers and the disparate calls upon its resources. However, as Mr Boyle himself conceded, carrying out gulley maintenance and jetting works before a flood, as distinct from after the flood, are entirely cost neutral. This is not a requirement or extra burden being placed upon a local authority to use capital expenditure or to outsource work. They have a permanent team in place. It is part of the council’s own workforce who are already employed. It is the failure properly to manage and to allocate work and time to ensure that these gulleys and this drain is free-flowing and clear of debris that is the failure on the part of the defendant in this case. After all, it is not as though these floods are unheralded.

19. The Judge then went on to assess damages. He rejected all of the claims for special damage – in relation to various items of property alleged to have been damaged. He made an award of damages for diminution of value of the property of £25,000 and an award for loss of amenity for each Claimant in the sum of £8,750 each. Grounds of Appeal

20. The Grounds of Appeal are lengthy and diffuse. Mr Boyle provided a lengthy summary of them at paragraph 2 of his Skeleton Argument, and provided a list of issues upon which the Court may choose to focus at paragraph 4. I further summarise the grounds as follows. i) Procedural unfairness . The Defendant complains of a number of specific procedural decisions, and more generally that there was “ a systemic failure by the Court to engage with the case before it ”. ii) Errors in findings of fact . It is said that the Judge made findings that were not supported by evidence or were contrary to the evidence and failed to make findings which were matters of uncontested evidence. iii) Error in assessment of the duty of care and breach of duty : it is said that the Judge erred in imposing a duty which was unreasonable, unrealistic and impracticable. The Judge is said to have erred in finding that the Defendant should prioritise the proactive jetting of the Claimants’ road over and above any of the 104,000 other gullies in East Cheshire, so as to ensure they are cleared in advance of excessive precipitation. Such a system was not put and amounts to an unreasonable standard. iv) Error in the analysis of causation issues : the key alleged error is the failure to deal with the difference between highway water and surface water. v) Error in assessment of loss of amenity damages : no award should have been made to Ms Thorneycroft as there was no evidence from her. The award wrongly exceeded the sum claimed. vi) Error in assessment of diminution of value : the Judge wrongly relied on inadmissible expert evidence (or Mr Spencer) and made an award based on a flawed understanding of the evidence. Legal Framework Test on appeal

21. An appeal of this kind is a review, not a rehearing. CPR 52.21(3) provides that the appeal court will allow an appeal where the decision of the lower court was wrong or unjust because of a serious procedural or other irregularity in the proceedings of the lower court.

22. Many of the grounds of appeal challenge the Judge’s findings of fact. The principles applicable to an appeal on questions of fact are well settled. Mr Moss referred to the summary by Lewison LJ in Volpi v Volpi [2022] EWCA Civ 464 at paragraph 2, which I accept. i) An appeal court should not interfere with the trial judge's conclusions on primary facts unless it is satisfied that he was plainly wrong. ii) The adverb “plainly” does not refer to the degree of confidence felt by the appeal court that it would not have reached the same conclusion as the trial judge. It does not matter, with whatever degree of certainty, that the appeal court considers that it would have reached a different conclusion. What matters is whether the decision under appeal is one that no reasonable judge could have reached. iii) An appeal court is bound, unless there is compelling reason to the contrary, to assume that the trial judge has taken the whole of the evidence into his consideration. The mere fact that a judge does not mention a specific piece of evidence does not mean that he overlooked it. iv) The validity of the findings of fact made by a trial judge is not aptly tested by considering whether the judgment presents a balanced account of the evidence. The trial judge must of course consider all the material evidence (although it need not all be discussed in his judgment). The weight which he gives to it is however pre-eminently a matter for him. v) An appeal court can therefore set aside a judgment on the basis that the judge failed to give the evidence a balanced consideration only if the judge's conclusion was rationally insupportable. vi) Reasons for judgment will always be capable of having been better expressed. An appeal court should not subject a judgment to narrow textual analysis. Nor should it be picked over or construed as though it was a piece of legislation or a contract.

23. Lewison LJ went on to make the following further points: i) Similar caution applies to appeals against a trial judge’s evaluation of expert evidence (paragraph 4); ii) Trial judges are free to draw, or decline to draw, inferences from the facts of the case before them based on common sense. Whether any positive significance should be attached to the fact that person has not given evidence, or to the lack of contemporaneous documentation, depends on the context and particular circumstances (paragraph 5). Nuisance

24. Mr Moss referred me to Vernon Knights Associates v Cornwall Council (citation above) as setting out the test in a nuisance claim of this kind against a highway authority. The Judge cited that case at paragraph 36 of the Judgment. Mr Boyle did not suggest any different test applied. He referred me to no other authorities on the law of nuisance. Although a number of other authorities were contained in the Authorities Bundle, neither party referred to them in their Skeleton Arguments, nor in oral submissions. I have considered them, but none of them requires any departure from, or addition to, the principles to be derived from Vernon Knights .

25. In Vernon Knights, the claimant’s property was flooded on two occasions by water emanating from the highway which ran along the property’s boundary. Water, from both the highway and an adjoining third party property, gathered in a dip and then ran onto the claimant’s land. The highway authority had carried out work to install drains and gullies, but these had not been effectively maintained, so that they became blocked, resulting in the flooding during heavy rain. The trial judge found the highway authority liable in nuisance and the Court of Appeal dismissed the claim. The lead judgment was given by Jackson LJ, with whom Lord Dyson MR and Stanley Burnton LJ agreed.

26. The claim focussed on private nuisance, as does the current claim. Jackson LJ said: i) The purpose of sections 41 and 58 of the Highways Act 1980 is to keep the highway safe for persons who travel along it. Those sections do not impose any duty on highway authorities to protect nearby property owners against flood damage. Such a duty arises, if at all, under the common law. The only relevance of the statutory duties is that they establish the highway authority’s duty to maintain the highway, including the drains. (Paragraphs 6-7). ii) As to the common law, in this area a defendant’s liability in nuisance is effectively the same as his liability in negligence (paragraph 48).

27. As to the existence and extent of the duty owed at common law, Jackson LJ said the following (paragraph 49): 49 Where then does the law now stand in relation to the liability of landowners for non-feasance in respect of natural nuisance? I would not presume to paraphrase the vast body of learning which has accumulated on this topic. Nevertheless, I extract from the authorities discussed above the following principles which are relevant to the determination of this appeal: (i) a landowner owes a measured duty in both negligence and nuisance to take reasonable steps to prevent natural occurrences on his land from causing damage to neighbouring properties; (ii) in determining the content of the measured duty, the court must consider what is fair, just and reasonable as between the two neighbouring landowners. It must have regard to all the circumstances, including the extent of the foreseeable risk, the available preventive measures, the costs of such measures and the resources of both parties; and (iii) where the defendant is a public authority with substantial resources, the court must take into account the competing demands on those resources and the public purposes for which they are held. It may not be fair, just or reasonable to require a public authority to expend those resources on infrastructure works in order to protect a few individuals against a modest risk of property damage. 50 Thus it can be seen that the judge is required to carry out a somewhat daunting multifactorial assessment. Procedural Issues

28. The Defendant raises a series of criticisms of the way the Judge conducted the trial, which is said to be unfairly accommodating of the Claimants and prejudicial to the Defendant. Paragraph 27 raises 11 points, which were expanded on at paragraphs 17-18 of the Defendant’s Skeleton Argument. I do not need to address each of those points in detail. I have considered the Defendant’s arguments carefully, in the context of the full transcript of the proceedings and the Judgment. I conclude that there was no significant procedural unfairness to the Defendant, either taking the long list of criticisms individually or as a whole. I reject the submissions that there was a systemic failure to grapple with the case and that the Claimants were treated more favourably than the Defendant. My reasons on the main specific complaints are as follows. The Judge’s Site Visit

29. The Court had not ordered a site visit, but the Judge unilaterally conducted his own visit to the site, unaccompanied, on the eve of trial. The Defendant makes two points. i) First, the Judge should not have conducted a site visit unaccompanied. The parties cannot know what he learned on site, and what he took into account in reaching his judgment. ii) Second, the Judge wrongly deprived himself of the opportunity of a site visit at the beginning of the trial, where, given the wet weather forecast for day one, a more realistic understanding of the drainage system could have been obtained.

30. As to the first point, it many cases it would be unwise for a judge to conduct a site visit in the absence of the parties. As the Defendant argues, it is difficult for the parties to know what the Judge has seen and taken into account. However, much depends on the circumstances: in particular as to the nature of the site to be visited, and the nature of the issues between the parties. It appears in this case all the Judge could have done was familiarise himself with the layout of the area: The Green and the Property. There is no suggestion he carried out any tests or lifted the drains. There was no issue between the parties as to the layout of the area, nor, in the light of the expert evidence, as to the layout of the drainage system. Further, given that the county courts deal, in large part, with disputes relating to the area in which they are located, it is not at all unlikely that a judge will be familiar with the place in issue in any particular set of proceedings. No difficulty arises from that. I see no difficulty in this case in the Judge familiarising himself with the road where the flooding occurred. He only put himself in the same position as a judge who happened to know the particular area from his local knowledge.

31. As to the second point, the Judge did not err in failing to conduct a site visit on the first day of the trial. It was a matter of case management discretion for him. It was a matter for him to weigh the benefit of a site visit as against the time that it would take out of the trial timetable. He cannot be said to have erred. i) As far as I am aware there had been no application ahead of trial for a site visit to be conducted. ii) The proposal is raised in the Defendant’s Skeleton Argument for trial, dated the day before trial. The idea is raised fairly tentatively. At paragraph 2 Mr Boyle said: There is, therefore, time available to conduct a site inspection should the Court see fit. The parties undertook such an inspection on 15 September 2025 and it would appear that the Claimants are potentially in agreement with the Defendant’s view that the Court may well benefit from seeing the lie of the land, the nuances of which are hard to convey with photographs or even the topological surveys iii) The rationale was therefore that the visit would allow the Judge to see the lie of the land. There was no mention of the benefit of seeing the gullies in heavy rain. It would have been a mere coincidence of weather conditions had it been possible to do so. Mr Boyle said during the course of the appeal hearing that he would have wanted to put water down the gullies to show the flow. There is no indication in the Skeleton Argument at trial that that was the purpose of the proposed visit. iv) The Judge said early on Day 1, in response to the Skeleton Arguments, that he had been on a site visit and did not need another one. (Transcript page 2 at F). Mr Boyle did not make any submission to suggest that there was any need for a further site visit. v) The Judge had no reason to think that a further site visit (beyond the one he had already conducted on his own) would have been of any benefit. vi) For my own part, I cannot see that any use would have been served by attending again. The Judge had seen the lie of the land, which, from my assessment of the plans and photographs, was not overly complex. I am extremely doubtful as to what would have been gained by putting water down the gullies. The Judge had the benefit of the maps, photographs and the expert evidence as to the configuration and operation of the drainage system. Those matters were not in dispute. Unsigned Schedule of Loss and Joint Witness Statement of the Claimants

32. Mr Boyle raised points at the beginning of the trial that the Schedule of Loss was not signed, and that the Claimants had filed a single witness statement on behalf of both of them. Further Ms Thorneycroft did not attend trial. The Claimants also had an objection to the admission of a late statement from Mr Metcalfe on behalf of the Defendant.

33. The Judge dealt with all of these issues at the beginning of trial. He gave a short ruling, a transcript of which I have not seen (see trial transcript page 6 F which refers to a separate judgment). However, the outcome is clear.

34. The Judge allowed in Mr Metcalfe’s late statement. He allowed the Schedule of Loss to be signed on the day. He allowed Mr Eaton to adopt the joint witness statement as his own. To Mr Boyle’s objection that the statement was not in the words of the witness (first as it was joint, secondly, because it adopted some of the language of the Particulars of Claim) he said those matters could be explored in cross-examination.

35. There was no error in the Judge’s exercise of his case management powers. He was clearly and properly focussed on getting to the substance of matters without getting bogged down in unnecessary formality. He was plainly entitled to the view that the various procedural failures had caused no prejudice to either side. It is relevant to note that the contentious joint witness statement was only two pages long. Apart from quantum issues, there was little dispute of primary fact. The Defendant was well able to deal with the Schedule of Loss and the witness statement in cross-examination and in submissions. Although it is argued that the Judge was unduly lenient on the Claimants, he clearly was not: he also allowed in the Defendant’s late witness statement. Disclosure failure

36. At paragraph 17.8 of his Skeleton for the appeal Mr Boyle complains that there was a failure to disclose metadata of the disclosed photographs and a failure to disclose other photographs that may have been detrimental to his case. I fail to see what those photographs may have been, or what issue the metadata would have gone to. I was shown a number of photographs which were in evidence at trial. Nobody suggested they were unreliable, or that the metadata was necessary to interpret them or challenge them. The Judge’s Interventions during the Evidence

37. The Defendant makes a series of complaints about the Judge’s conduct during the evidence. He chose to call the witnesses himself and needed to be reminded of the need for the witnesses to have the opportunity to make corrections to their statements; he elicited evidence from Mr Eaton; he challenged and put words into the mouth of the Defendant’s witnesses; he took an unduly confrontational approach to the Defendant’s witnesses.

38. I reject all of these criticisms. A judge is not a passive observer of a trial. He must conduct the trial fairly and be sensitive of the need to ensure that witnesses are able to give their best evidence. He must not “enter the arena” on behalf of one party. However, a judge also has a duty to manage the efficient conduct of the trial. It is perfectly open to a judge to ask questions of a witness. Having considered Mr Boyle’s submissions carefully and having considered the transcript of the full trial I cannot accept the criticisms of the Judge’s handling of the trial and I do not accept that he conducted it in a way that was unfair to either party. Evidence on Quantum

39. Specific complaint is made about the acceptance of Mr Spencer’s report in evidence, and the acceptance of evidence as to Ms Thorneycroft’s loss of amenity without evidence from her. I will deal with those points below in dealing with the quantum grounds of appeal. Criticisms of the of the Judge’s reasoning

40. Paragraph 27 of the Grounds of Appeal mix points about procedure with points about the judge’s approach to assessing the evidence and his conclusions. These are substantive points as to the alleged errors in his judgment and not procedural points. I address them no further here. Liability

41. The Defendant argues that the issues of duty, breach and causation are interwoven.

42. The central thrust of the appeal is that the Judge set too high a duty on the Defendant to take steps to prevent flooding of the Property, in the light of (1) the reasonable steps that had been taken by the Defendant over the years to solve the problem at The Green; and (2) the competing demands upon the Defendant’s resources, given many properties in the county are vulnerable to flooding.

43. A key plank of the appeal, framed as a question of causation, is that the Judge failed to analyse the difference between highway water and surface water. It is said that the Defendant is not liable for surface water, and therefore the Judge erred in failing to determine whether flooding was caused by water for which the Defendant was responsible, or by water for which it was not responsible.

44. The Defendant further challenges factual findings of the Judge. i) The Judge made a series of findings of fact as to the history of the Defendant’s actions, understating those actions (paragraph 20 Skeleton Argument). ii) The Judge found that pro-active jetting of the drains would have been reasonable. There was no basis for that, and it was not put to the witnesses. Further, there was evidence to support the conclusion that jetting would solve the flooding problem. Highway Water and Surface Water?

45. The Defendant argues that the Judge erred in failing to take into account the difference between highway water and surface water.

46. Highway water is water which falls as rain on the highway. Surface water is water that comes onto the highway from elsewhere, for example other properties adjoining the highway. It was said that the Defendant’s liability relates only to highway water, not surface water. The Claimant had failed to prove that the flooding was caused by highway water and the Judge failed to make findings on this issue.

47. This is put by the Defendant as an error in relation to causation, but in fact, the submission is predicated on a question of scope of duty. The point depends on the submission that the Defendant is not liable for surface water. If that is right, it may be necessary to inquire as to the source of the water that caused the flooding; but if the point is wrong, it makes no difference whether the water was highway water or surface water.

48. The Judge reached the latter conclusion. He held, at paragraph 44, that the distinction was irrelevant.

49. I have been shown no authority to demonstrate that he was wrong about that. The Defendant advanced no authority, either at trial or on appeal, in support of the proposition that it was responsible only for water which fell on the highway and not water that has come onto the highway from adjacent land.

50. On the contrary, the only authority I was shown, suggests the Judge was right. In Vernon Knights , one factor relied on by the defendant council as relevant to the extent of its duty was that most of the floodwater in that case came from an adjacent property owned by a third party. The slope of the land in that case ran downwards from the third party’s land, across the highway and onto the claimant’s land. (See paragraph 52, where this was referred to as factor (i)). At paragraph 56 Jackson LJ said: As to Factor (i), it is quite true that the water which collected on Honicombe Road came from external sources beyond the council's control, but that is true in many of the flooding cases. It is also true that the council took measures to reduce the effect of the flooding. Nevertheless, those measures were not implemented on the two dates in issue.

51. It was not, therefore, a barrier to liability that the floodwater came onto the council’s land from a third party’s property.

52. The Defendant also argued that the Judge failed to distinguish between water which came onto the Property from the highway and water which fell onto the Property itself. Having seen the photographs of the flooding and considered the evidence as to water running off The Green, I regard the suggestion that the flooding in the Property was caused by rainwater which fell on the Property itself as fanciful. The photographs show several occasions where floodwater can be seen to have formed a single pool of water covering part of The Green outside the gates of the Property and the driveway and front garden of the Property. It is agreed that the level of The Green is higher than the Property. It is absurd to suggest that extensive flooding of this nature was caused by water falling directly onto the Property, rather than water falling onto, or running down, The Green. The Judge did not err in failing to make specific findings about this. Errors of fact

53. Before turning to the ultimate issue of whether the Judge was wrong in the extent of duty he imposed on the Defendant (and on the findings of breach), I will address the factual errors that he is alleged to have made, as the facts form the substratum of the Judge’s conclusions on breach of duty.

54. Paragraph 20 of Mr Boyle’s statement sets out a series of alleged errors of fact in the Judgment as to the extent of remedial action taken by the Defendant.

55. The first of these points alleges that the Judge was wrong to find that routine gully inspection was reduced from three times a year to once every three to four years. It is said that the routine inspection was never three times per year. In one year, there were three inspections but that was in response to specific call-outs at the request of the Claimant. I cannot see that makes much, if any difference, and is not central to the Judge’s reasoning. Either way, in later years there were fewer maintenance visits than in some earlier years. The comparison of visits over time was only one factor in the Judge’s assessment of whether the current arrangements were reasonable.

56. I was not addressed in any detail as to why the Judge’s findings of fact on the other matters at paragraph 20 were wrong. Given the high bar for a challenge to a finding of fact, I am not satisfied that he was wrong; nor am I satisfied that the specific detailed findings, even if any of them were wrong, could make a difference to the Judge’s overall assessment. For example, over a period of more than a decade it makes little difference whether the Defendant had carried out CCTV inspection once or twice. Whatever steps the Defendant had taken, it did not take effective steps to remedy the situation until late 2024.

57. Those steps in late 2024 were jetting of the drains. The Defendant challenges the Judge’s finding that jetting the drains was a solution to the flooding, and therefore, the finding that failure to clear roots and debris from the drain by jetting was the cause of the problem. The Defendant points to other matters which may have caused improvement and alleges that the Judge’s finding was made without evidence and was perverse. I reject that submission. There was evidence upon which the Judge was entitled to find that the Defendant’s jetting in late 2024 had caused the flooding problem to abate. In particular: i) The joint expert report stated that (i) restrictions in the drain from tree roots or other debris are likely to have been a contributory factor to the flood events; and (ii) maintenance to clear the gulleys, jet the system and clear roots are likely to have cleared residual old tree roots. ii) Mr Eaton’s evidence was that after the jetting in late 2024 there was no further flooding, despite heavy storms in 2025. The Judge’s conclusions on Duty and Breach

58. That brings me to the central question of whether the Judge erred in holding the Defendant to an impermissibly high standard of care, in the light of the steps it took and the competing demands on its resources.

59. It is important to identify the Judge’s essential reasoning. The Defendant argues that the only way the Judge could find for the Claimants was to impose an obligation on the Defendant to jet (or otherwise clear) the drains ahead of all of the other gullies in the county whenever rain was threatened. That, it is said is both wrong in principle and not a case which was pleaded by the Claimants or put to Mr Metcalfe.

60. The Defendant criticises paragraph 28 of the Judgment: Moreover, despite the huge advances in meteorological forecasting, with increased predictability of storms and periods of high rainfall, there was no evidence placed before me that the defendant has in place any steps or system either to check before the rains fall that the drains are clear and will be able to cope, or to be in a position to move in rapidly and address flooding if it in fact develops. Instead, the evidence I received was that the council’s entire response to flooding issues is simply and solely reactive. They will deal with the flood if and when it occurs and if and when it gets to the top of the list of other properties which are affected countywide and which are of greater priority, by which time the floodwaters may well have abated and dissipated naturally in any event.

61. I would have some reservation about imposing a duty on a highway authority to monitor weather forecasts and respond to check gullies, of all vulnerable properties, as soon as bad weather is forecast.

62. Having said that, whether or not a highway authority could be expected to check on areas at particular risk when bad weather is due is a matter of evaluation of the evidence, not a matter of principle. In Vernon Knights the council did have a system where the relevant employee broke off to check a particular hotspot in bad weather (see paragraphs 27-28) a system which the court described as “extremely sensible”. I do not see that there is any reason as a matter of law or principle why such a system could not be operated. It is a question of whether in all the circumstances, given competing demands, it is unreasonable for the authority to fail to do so: that is a factual assessment – part of the multi-factorial assessment that the Court must carry out.

63. In any event, I accept Mr Moss’s submission that paragraph 28 is not part of the Judge’s essential reasoning. Paragraph 28 is one of a series of observations in the section dealing with the evidence. I have set out the essential reasoning on liability above – it is at paragraphs 44-46 of the judgment. In those paragraphs, I do not take the Judge to be going so far as might be suggested by paragraph 28. He is saying that in the face of a known risk that had pertained for over a decade, the Defendant had failed to remedy the problem and had failed to show that it had a reasonable system in place for dealing with the situation. The system in place for maintenance – whether routine or in response to a risk – was inadequate due to a failure to manage and allocate work. The Judge’s findings are apt to cover the system of routine clearing and jetting, and not simply the “weather forecast reaction” scenario referred to in paragraph 28. The Defendant has staff, and resource, which it had allocated in repeatedly sending staff out reactively after a flood. Until 2024 its efforts were ineffective. The Judge was entitled to find that deployment of the resources before or after a flood were cost neutral.

64. I do not accept that the Judge found for the Claimants on a basis that was not pleaded, or that was not put to the Defendant’s witnesses. The claim alleged that the Defendant had allowed water to flood the Property, and that its attendances at the Property had failed to remove blockages in the drainage. It was for the Defendant to make out a defence that it had taken reasonable steps to prevent the water flooding the Property.

65. Did the Judge err in imposing too high a standard of duty on the Defendant? He did not. Vernon Knights makes clear that the question is answered by a multi-factorial assessment in the light of the circumstances. That assessment is primarily a matter of assessment for the trial judge; this Court will be slow to interfere. The Judge carried such an assessment out. He had express regard to the circumstances of the Property, the Defendant’s efforts, and the competing demands on the Defendant’s resources. In my judgment, the Judge made no error of principle; he reached findings of fact that were open to him; on the basis of those findings, he conducted the multi-factorial assessment and reached a conclusion that was open to him.

66. I dismiss the appeal on liability. Quantum Diminution in Value

67. The Judge made an award for diminution of value of the property of £25,000 as against a claimed sum of £75,000. He dealt with that in three paragraphs – at paragraphs 49-51. His reasoning is as follows. i) At paragraph 49 he said “ Clearly, as a result of the flooding issues, it stands to reason that the claimants’ property has been blighted.” ii) He said that the only evidence as to the head of loss was Mr Spencer’s report. he described that as significantly out of date and acknowledged the many defects of the report, as pointed out by Mr Boyle. iii) He said that the flooding appeared to have been resolved, and he hoped that the judgment would result in a more appropriate system of maintenance. iv) At paragraph 51 he said “ Doing the best I can, because I am satisfied that there is a disclosable issue here in the event of the Claimants coming to sell their property, albeit hopefully now on a reducing basis, the damages I award for the blight to the property and thus loss of value is £25,000 ”.

68. The Defendant argues that the decision to make an award for diminution of value could only be predicated upon the evidence of Mr Spencer. The Court should not have had regard to that evidence as there was no permission given for expert evidence pursuant to CPR 35. Had there been permission, the Defendant would have obtained its own expert evidence or would have asked for Mr Spencer to attend trial to be cross-examined. The report in any event contained a number of material errors. There was no adequate evidential basis for the figure of £25,000. To make that award absent evidence was perverse.

69. I agree with the Defendant’s criticism that no permission had been given to rely on Mr Spencer as an expert pursuant to CPR 35. However, that was not an objection taken by the Defendant prior to trial: i) The Counter Schedule of Loss dated 22 April 2025 (paragraph 6) refers to Mr Spencer’s report. It makes a number of criticisms of the content of the report, it does not argue that the report is inadmissible. ii) That was almost five months before trial. It was clear to the Defendant that the Claimants sought to rely on Mr Spencer’s report, and the Defendant responded to the substance of it. iii) It does not appear that any application was made to exclude Mr Spencer’s report, which was included in the trial bundle. The Defendant’s trial Skeleton Argument does not address the admissibility of the report. The admissibility of the report was not raised as preliminary issues at the beginning of the trial, whereas (as I have explained above) other procedural issues were. iv) Nor was there any application to adduce the Defendant’s own expert valuation evidence, nor to have Mr Spencer attend for cross-examination.

70. While it is true that no permission had been sought pursuant to CPR 35, as it should have been, the Defendant’s response to Mr Spencer’s report shows that they were not deprived of the opportunity to seek to rely on their own expert, nor to seek to cross-examine Mr Spencer; nor did they seek to exclude the evidence from the trial on the basis that they were unable to take either of those steps.

71. In the circumstances, I do not think the Judge erred by failing to exclude Mr Spencer’s report from the evidence.

72. In any event, it is clear from his judgment that the Judge attached little, if any, weight to Mr Spencer’s evidence. I reject the argument that the Judge failed to have regard to the errors in Mr Spencer’s report. It is clear from paragraph 49 that he accepted Mr Boyle’s criticisms. Indeed, taking paragraphs 49-51 as a whole, the Judge made his own assessment, rather than relying on Mr Spencer’s report. i) He made an assessment, at paragraph 49, that the flooding had caused blight, in the sense that it would need to be disclosed on a sale and (by obvious implication) it would affect the sale price. ii) He made his own estimate of the value of that blight as £25,000.

73. I can see no ground for criticism of the first of those findings. It is, as the Judge said, a matter that stands to reason, that a history of flooding would need to be disclosed on sale, and would be likely to have an impact on the price a buyer would be prepared to pay. He was entitled to make that finding.

74. Did the judge err in evaluating that blight as £25,000? The claim had been for £75,000. While there was no specific evidence to support that figure, or any figure, having found that there was blight, and having found that there were flaws in the Claimants’ evidence for the figure claimed, the judge was entitled to make an assessment, doing the best he could. He was not obliged to reject the claim out of hand as being unsupported by evidence. The figure he reached, £25,000, is a relatively modest one and 1/3 of the claimed sum. I can see no basis for the argument that it was perverse to assess damages in that sum.

75. I reject this ground of appeal. Loss of Amenity

76. The Judge awarded each Claimant £8,750 damages for loss of amenity – a total of £17,500. He gave reasons for his assessment at paragraph 52. He had regard to the lengthy period of repeated flooding, and to the impact and interference with the Claimants’ enjoyment of their property. He found that the Claimants’ garden was immaculate and a source of great pride to them.

77. There are two challenges to the Judge’s decision on loss of amenity. i) The Judge erred in making an award in respect of Ms Thorneycroft, given that there was no witness evidence from her. ii) The Judge erred in awarding an amount greater than the sum claimed in the Schedule of Loss, without hearing submissions and without giving reasons for doing so.

78. The first point is without substance. It was open to the Judge to find that there had been a loss of amenity for both Claimants based on the evidence from Mr Eaton. Mr Eaton could describe the impact of the flooding on both of them. It was open to the Judge to make a finding that Ms Thorneycroft had suffered a loss of amenity given the evidence from Mr Eaton of the situation they were both in: a finding did not depend on the evidence of Ms Thorneycroft herself. I reject the argument that Mr Eaton’s evidence was hearsay in this regard - he gave an explanation of the facts applying to them both as he experienced them. Even if it was hearsay, it was not inadmissible evidence. Given that the flooding affected the home in which they both lived together it was a matter of common sense that they were likely to be affected in the same way, so there is nothing surprising, or in error, in the Judge’s decision that they should each receive the same amount.

79. As to the second point, the Schedule of Loss claimed £15,200 in respect of loss of amenity. The Judge’s award exceeded that by £2,300. The Defendant argues that the Judge erred in exceeding the amount claimed. I note that the appeal is put on the basis that the pleaded figure is £14,200 (Grounds of Appeal para 25, Defendant’s Skeleton para 36). This is an error: the actual figure claimed in both the Particulars of Claim and the Schedule of Loss is £15,200.

80. Mr Moss relied on Celebrity Speakers v Daniel [2023] EWHC 2158 as authority for the proposition that the Court is not limited to making an award of damages in the sum claimed by a claimant. That case deals with a quite different point and is of no assistance here. The defendant’s argument in that case was that the claimant should be limited to the amount the claimant had put in the “amount claimed” box of the claim form. The judge rejected that argument, pointing out that CPR 16.3(7) provides that the statement of value in the claim form does not limit the power of the court to give judgment for the sum it finds the claimant is entitled to, especially if the statement of value was an estimate before the extent of harm was known (see paragraphs 42-44 of the judgment of Mr Jason Beer KC). In Celebrity Speakers , Mr Beer KC assessed damages in line with the pleaded case in the Particulars of Claim and the evidence at trial, and in line with how the case was argued by both parties. The argument was whether the claim form placed a “cap” on damages notwithstanding the Particulars of Claim and the evidence.

81. This case is different: at the end of the trial the only claim for damages for loss of amenity was valued by the Claimants (in the Particulars of Claim and Schedule of Loss) at £15,200.

82. Did the Judge err in awarding a sum of £17,500?

83. The Judge was right to say that loss of amenity is a matter of assessment. It was a matter for the Judge to evaluate the evidence and reach a figure that adequately compensated the Claimants for the harm suffered. For loss of this type, there are no guidelines or comparators, and neither party suggested that there was. The Judge assessed the facts and the matters he took into account in paragraph 52 are plainly relevant. As a matter of principle (and leaving aside for the moment the Schedule of Loss point), there is nothing excessive about an award of £17,500 in the circumstances of this case. It is in my judgment a reasonable sum for the obvious loss of amenity suffered by the Claimants for their flooding of their garden and the interference with access to their own home.

84. If the figure itself is unobjectionable, the Defendant’s argument is essentially a procedural one: the Judge erred in making an award in excess of the amount in the Schedule of Loss without indicating that he was considering doing so, and without hearing submissions from the parties. There is force in this argument. It would have been better if the Judge had indicated the amount he contemplated and invited submissions. In a higher value case, and where the increase above the Schedule was greater in amount, such an argument may give rise to a valid ground of appeal.

85. However, in this case the sum claimed was relatively small and the “excess” over the Schedule of Loss is small – some £2,300. It is difficult to see what more the parties would have said if the Judge had asked for submissions on his contemplated figure. In the circumstances I do not find that the procedural irregularity was serious, nor that it gave rise to a result that is unjust or renders the decision wrong. I dismiss this ground of appeal. Conclusion

86. For these reasons, I dismiss the appeal in its entirety.