Margaret Hyde & Ors v John Connellan & Anor
[2026] UKFTT PC 944 · Land Registration Division (Property Chamber) · 2026
The verbatim text of this UK judgment. Sourced directly from The National Archives Find Case Law. Not an AI summary, not a paraphrase — every word below is the original ruling, under Crown copyright and the Open Government Licence v3.0.
Full judgment
1. The First, Second and Third Applicants are Trustees of the Fourth Applicant. This application concerns a unilateral notice registered against the title of 65 Boone Street, London, SE13 5SE (“the Property”) on 15 th February 2020 to protect an Option Agreement granted by the Fourth Applicant (“the Church”) to the Respondents on 1 st April 2020 (“the Option Agreement”). The Applicants applied to cancel the unilateral notice on 30 th July 2024 on the grounds that the Option has expired.
2. The Respondents objected to that application on the grounds that the Option Agreement is still continuing in its full force and effect. The Respondents rely on various forms of estoppel. The Second Respondent is a company incorporated in 2011. The First Respondent is not a director of the Second Respondent and the Second Respondent took no active part in these proceedings.
3. This case was transferred to the Tribunal on 29 th April 2025. At the hearing, the Applicants were represented by Ms. Annie Higgo of Counsel and the Respondents were represented by Mr. Christopher McCarthy of Counsel. I am grateful to both of them for their detailed and helpful written and oral submissions.
4. It is common ground that the long stop date for the exercise of the Option provided for in the Option Agreement expired on 31 st March 2022 (“the Long Stop Date”). However, in simple terms, it is the Respondents’ case that after the Long Stop Date, the Church acted in a manner which estops them from now claiming that the Option Agreement has expired. In particular, the Respondents say: (1) Mr. Terry Brown, as representative of the Church, assured the First Respondent that the Long Stop Date was of no consequence, and that it did not matter. (2) After the Long Stop Date the parties treated the Option Agreement as continuing. (3) The Respondents relied on these promises and representations to their detriment in that they continued to spend time and money on the project.
5. It is clear that the parties did continue to negotiate after the Long Stop Date. The Applicants accept that they were still keen for the project to continue but say that they were negotiating the terms of a new deal to take account of the new circumstances and that those negotiations did not culminate in a binding agreement. The Respondents say that the discussions related to the implementation of the existing Option Agreement.
6. I heard evidence from Mr. Terence Brown, an honorary member of the Church, from Sarah Humphrey (also known as Sarah Whitcher) of Trethowans LLP who acted for the Church on the transaction from about March 2023 and Mr. Connellan, the First Respondent. Background and Chronology
7. The Property is currently a single storey hall in a poor state of repair constructed in about 1936. On 1 st April 2020, the Church granted the Respondents an Option to purchase the Property for the purposes of redeveloping it into a church and flat on the ground floor and residential flats on the upper floors (“the Proposed Development” – as defined in the Option Agreement). The Respondents are described in the Option Agreement as the Developer.
8. Both parties instructed solicitors to draft the Option Agreement which is structured as follows: (1) The Church granted the Respondents an option to purchase the Property during the Option Period (which expired on 31 st December 2021) for £100,000 (the Purchase Price). A non-refundable option fee of £10,000 was payable on signing of the Option Agreement which would be deducted from the Purchase Price. (2) The Respondents would, at their own cost, submit an application for planning permission for the demolition of the existing building and its replacement with the Proposed Development within 6 months of the date of the Option Agreement with provision made for subsequent applications or appeals with the Church’s approval. (3) The Respondents could exercise the Option at any time during the Option Period by serving an Option Notice in the prescribed form and would, at the same time, pay the deposit of £10,000. (4) If the Option was exercised the Church would sell the freehold to the Respondents for £100,000 subject to the Respondents granting the Church, at nil consideration: (a) a 999 year lease of the church premises on the ground floor as shown coloured blue on the plan to the Option Agreement; and (b) a 999 year lease of a residential two-bedroom flat ancillary to the church at ground floor level as shown coloured pink and green on the plan (“the Residential Lease”). (5) The Residential Lease was to be “drafted in accordance with any conditions stipulated in the Planning Permission”. The “Planning Permission” was defined as detailed planning permission for the Proposed Development.
9. Clause 4 of the Option Agreement made provision for extensions of the Option Period but these were subject to clause 4(5) which stated that in no circumstances would the Option Period be extended beyond the Long Stop Date.
10. The Option Agreement was entered into without obtaining the approval of the Charity Commission as required by s. 105 of the Charities Act 2011 . This was due to a misunderstanding on the part of the Applicants as to whether the Church was an “exempt” charity.
11. On 15 th April 2020 a unilateral notice was entered against the registered title of the Property “in respect of an option to buy pursuant to an Agreement dated 1 st April 2020 . . . “
12. On 5 th June 2020, the Respondents applied for planning permission. The details of this application were not before me but presumably the application was for the Proposed Development. Permission was refused.
13. On 19 th March 2021 a second application for planning permission was made by the Respondents and again it was refused. Again, the application was not in the bundle, however, it was presumably for the development described in the valuation prepared by Daniells Harrison dated 24 th March 2021 which was obtained by the Church “For Internal & Charities Act Purposes only” (“the Report”). The Report recites that the valuer had been provided with a copy of a travelling draft of the option agreement which was unsigned and was told it was representative of the final agreement which they assumed had been signed in 2019. The Report states: “… The draft agreement makes reference to a 2 bedroom flat on the ground floor although you have advised us that this has subsequently been removed from the proposal…” The Report then refers to the 9 flats which formed part of the second planning application.
14. The Report recognises that the refusal of planning permission for the Proposed Development gave the Church the opportunity to potentially introduce conditional requirements. It advised: “… if the developer does not comply with the terms of the option (and arguably he cannot comply with the original timescale by virtue of the planning refusal), then the church will be in a position where negotiations will have to recommence from the beginning, at which point the selection process for the choice of developer under the option agreement can be carried out in accordance with the requirements of the Charities Act.”
15. The Report made it clear that the valuer’s assumption that the Church was bound by the Option Agreement was subject to comments by the Church’s solicitor. It also made various recommendations for the introduction of new terms into the option agreement and concluded that: “if the developer is prepared to accept the recommendations contained within the QSR then it would not in our opinion be unreasonable to proceed with the current arrangement”. The Report further states: “8.02 In the event that the developer is unwilling to agree to our recommendation, pending any advice from your solicitor, then we will need to reconsider the overall scenario to determine if it is still in your interests to proceed. It may however be that you will automatically be provided with the opportunity to recommence the developer selection process on a QSR compliant basis.”
16. There was no evidence that the Respondents had agreed to the introduction of the new conditions proposed by Daniells Harrisons and no detailed submissions were made by either party regarding the content of the Report.
17. Following the refusal of the second application for planning permission, the Respondents made a third application for planning permission on 6 th August 2021 which was ultimately successful. This third application was not for “the Proposed Development” as defined in the Option Agreement because it did not include a ground floor flat which could be leased back to the Church. The Option Agreement was not varied to take account of this. However, Mr McCarthy, on behalf of the Respondents, argued that: (1) some sort of estoppel arose because both parties were aware of the fact that the Respondents would not be able to grant the Residential Lease if the third planning application succeeded; and/or (2) the provision in the Option Agreement which provided that the Residential Lease would be “drafted in accordance with any conditions stipulated in the Planning Permission” allowed for there to be no residential lease at all.
18. Neither of these arguments form part of the Respondents’ pleaded case. Neither the Respondents’ Statement of Case nor Mr. Connellan’s witness statements make any mention of the omission of the ground floor flat from planning permission which was ultimately achieved or set out the basis upon which any estoppel could be said to arise in respect of this omission. I reject the argument that the requirement for the Residential Lease to be drafted in accordance with the conditions in the planning permission removes the obligation to grant the Residential Lease altogether.
19. It was only in December 2021, four months after the third application had been submitted that Mr Brown became involved. Mr Brown was not a committee member or Trustee of the Church at that time but agreed to assist with the Charity Act compliance issues which had arisen. Mr. Brown was aware, buy this time, that the third application for planning permission did not include the construction of a flat on the ground floor.
20. Mr Brown stated that he met Mr. Connellan only once on or around 19 th February 2022 and this was not disputed by Mr. Connellan. Mr. Brown was introduced as an adviser. The meeting was in preparation for the council’s Planning Committee meeting which was due to take place on 24 th February 2022.
21. Mr. Connellan stated in his two witness statements that Mr. Brown attended the council meeting and was delighted when the panel approved the planning permission. He said Mr. Brown understood the delays so far and did not say that there was any urgency with the matter even though the Option Period had elapsed and the Long Stop Date was a few weeks later. Mr. Connellan said Mr. Brown did not at any point say that the Long Stop Date would be a problem. It is notable that Mr. Connellan’s assertions are limited to what Mr. Brown did not say in relation to the Long Stop Date or lack of urgency rather than anything Mr. Brown did say. Mr. Connellan does not state positively that there was any discussion of the Long Stop Date at all at this meeting.
22. The Respondents’ pleaded case is that Mr. Brown made various assurances at the Council meeting. However, Mr. Connellan accepted in oral evidence that Mr. Brown was not at that meeting. Accordingly, Mr. Brown could not have made any assurances at that meeting.
23. At the Planning Committee meeting, the council indicated that it would recommend approval of the third application subject to the imposition of a s. 106 agreement. Mr. Brown’s evidence is that the only condition mentioned in the meeting (which he watched on livestream) was regarding there being 20 hours of community use of the church premises. Although the Respondents’ counsel referred to there being other s.106 conditions which bound the Respondents, he was unable to say what these were or refer to any documentation stating that they had been imposed. Mr. Connellan stated in his witness statement that the Planning Committee Report from that meeting was not made available until 25 th April 2024 – more than two years later - which was the date on which planning permission was actually granted.
24. In or around May 2022, the Church made an application to the Charity Commission for retrospective approval for the Church entering into the Option Agreement. The application was made via solicitors specialising in charity law. Mr. Brown’s evidence was that, at that stage, although he was aware that the Long Stop Date had passed, he was not concerned because he assumed it could be extended under the extension clause. The Respondents were not involved in this application.
25. Shortly afterwards in about June/July 2022, Mr. Brown was appointed as an honorary member of the Church. He was also co-opted to the Church committee to assist with progressing matters in relation to the Option and the Charity compliance investigation. At this point, Mr. Brown began to worry about the ongoing delays with the project. On 29 th August 2022 at 10.50 am Mr Brown sent an email to members of the Church committee inviting them to: “ . . .confirm by a formal vote, Lewisham Spiritualist Church extends the current option agreement or signs a new option agreement with Princes Gate Properties to allow the transaction to continue, and to confirm the wishes of the members” It therefore appears that, by this stage, Mr. Brown was aware of the fact that the date for the exercise of the Option had expired.
26. The recipients included a lady called Dorothy Firth who was the President of the Church at that time. Mrs Firth must have relayed the proposal for an extension or new agreement to Mr. Connellan shortly after she received the email because at 14.46 pm on 29 th August 2022, Mr. Brown sent an email to members of the committee saying: “Afternoon Dot has spoken to John, and legally he’s happy that we don’t need to extend or re sign the option agreement. I withdraw my request for a SGM” This email was relied on by the Respondents as being a representation that the Church was willing to waive the Long Stop Date. In my view, an internal email which was not addressed to the Respondents and merely reported what the First Respondent had claimed to be the legal position, cannot have been a representation by the Church which the Respondents relied on.
27. At this stage, the Church had not taken any legal advice on the enforceability of the Option Agreement. It appears that they accepted Mr. Connellan’s assertion that the legal effect of the agreement was that there was no need to extend or re-sign. Mr. Connellan stated in oral evidence that he was not an experienced developer. Whether this is correct or not, the members of the Church seem to have assumed that he was and that he knew what he was talking about.
28. On 22nd November 2022, the Charity Commission granted approval for the Church to sell the Property in accordance with the Option Agreement dated 1 st April 2020 “as amended by other terms communicated to the Commission”. There was no evidence as to what those “other terms” were save for speculation on the part of the Respondents’ counsel. The information provided to the Charity Commission included the Daniells Harrison Report dated March 2021. The Charity Commission directed that the sale must be completed within a year from the date of the Order, i.e. by 22 nd November 2023.
29. Mr. Brown informed Mr. Connellan that the Charity Commission had authorised the disposal and Mr. Connellan said he would instruct new solicitors, Merali Beedle LLP, to act on his behalf.
30. Mr. Brown became a trustee of the Church in March 2023 and on 16 th April 2023, the Trustees appointed Mr. Brown to take the lead on the legal issues, building progress and risk management regarding the proposed development. Mr. Brown said in oral evidence that his role was to liaise with the solicitors and feed back to the Trustees. By this time, the Church had instructed Sarah Humphrey of Trethowans LLP to act for them and she had advised that the Option Agreement had expired. Merali Beedle LLP had already been appointed by the Respondents.
31. Ms. Humphrey’s first email to Merali Beedle on 6 th April 2023 stated: “1. The Option Agreement dated 1 st April 2020 has expired
2. Your client did not obtain planning to be able to grant both the Flat Lease and the Church Lease back to my client which was required by that Lease.
3. The proposed method of ensuring construction was carried out or the property was transferred back to my client was not effective. If there were any subsequent documents entered into by my client after the Option Agreement can you please let me have copies. Otherwise, my client is still keen to sell to yours but I think we will need to renegotiate documents to include full details for the Lease, appropriate warranties and constructions obligations (with suitable security) and obviously with a new Sale Agreement. As your client has planning do they require an Option Agreement or would they prefer to go straight to an unconditional contract?”
32. Nearly a month later, on 4 th May, the Respondents’ solicitors replied that they would like to proceed straight to completion as per the option agreement. Ms Humphrey replied a few hours later explaining again that the option agreement had expired and that she understood the Respondents could not comply with the obligation to grant the Residential Lease. She said that she did not consider they could proceed without a new contract being entered into and that the Applicants would also require some sort of security in relation to the build works. Security was not provided for in the original Option Agreement.
33. By a further email dated 11 th May 2023, Ms Humphrey pointed out to the Respondents’ solicitors that the original deal required the leaseback of a flat on the ground floor of a flat and that, if this was no longer to be provided, this would have an impact on the price. She said: “My understanding is that your client will be purchasing the whole of the freehold property, with an obligation to build the units and, on completion, lease back the ground floor unit to my client. This means the purchase price would be based on the freehold value, less the value of the built unit. This would mean my client would receive significantly less than market value of the property on completion, with a promise to build the unit and lease it back. . . . As I am sure you will appreciate, my client is obliged to comply with charity law which requires them to dispose at market value. If your client did not complete the build for any reason, went into liquidation (at which point the agreement for lease could be disclaimed) or did not build out to the required standard, my client would be in breach of these obligations. If I have misunderstood the position, please do clarify. However based on the assumptions above, my client will not be able to obtain the required surveyors report to authorise the sale, nor are the likely to obtain a Charity Commission order to allow it with this level of risk for charitable funds. …”
34. Over a month later, on 14 th June 2023, Merali Beedle LLP replied. They did not suggest that Ms Humphrey had misunderstood the position. They did, however, confirm that the Respondents would offer a £400,000 guarantee. No guarantee was required under the original Option Agreement. When asked in cross examination why he was prepared to offer a £400,000 guarantee if he considered he was under no obligation to do so, Mr. Connellan said that Terry (Mr. Brown) asked for it so he agreed. Mr. Brown’s evidence was that, on the contrary, Mr. Connellan resisted granting a personal guarantee but was obliged to do so if the new agreement was to properly protect the Church and be compliant with Charity law.
35. Ms Humphrey emailed the Respondents’ solicitors back on 26 th June confirming that the Church was happy with the proposed guarantee and stating that the next steps would be: “1. A new contract including: (a) The build obligations (b) Obligations to provide a new build warranty (c) An obligation to enter into a lease of the church unit (d) Guarantee provisions.
2. A draft lease….”
36. Yet another month went by before the Respondents’ solicitors replied stating that they were instructed to proceed as proposed. Thereafter, the parties’ respective solicitors proceeded to negotiate the terms of the various documents required. It appears that the Respondents were in no hurry to conclude the deal and on 28 th November 2023, Ms Humphrey wrote to their solicitors following the receipt of non-land registry compliant plans from them in the following terms: “My client has also asked me to emphasise urgency here. Your client’s option has expired and the church members are becoming increasingly frustrated by the delays. Whilst the board are doing there best to hold the deal together, unless progress speeds up considerably, there is a risk they will not be able to do so…”
37. On 15 th January 2024, Ms Humphrey informed Merali Beedle LLP that the new valuation required under the Charities act would take place on 17 th January. The form of the agreement for lease, the agreement for sale and the personal guarantee were all agreed “subject to contract” by 23 rd February 2024. On that date Merali Beedle asked Ms Humphrey to confirm that they could send the engrossed documents for signing. Ms Humphrey replied “No” because she was still awaiting the Charites Act valuation.
38. The valuation was finally obtained on 23 rd February 2024 or thereabouts. It was based on a transfer of the freehold with a leaseback of the ground floor church on a 999 year lease at a peppercorn rent. The valuation stated that: (1) The Property was valued at £185,000 on the basis of its’ existing use. (2) The Residual Land Value, on the basis of 8 flats and a church hall, was £615,000. (3) The market value of a long lease of the church was £400,000.
39. Accordingly, the valuation identified a shortfall of £125,000 between the residual value of the land and the net benefit to the Church of £490,000 - £90,000 cash benefit plus £400,000 being the value of the leaseback of the church premises. Mr. Brown notified Mr Connellan of the position and requested new terms be agreed, reminding him of the trustees’ responsibilities under the Charities Act 2011 to obtain market value. Mr. Brown’s evidence was that Mr. Connellan had indicated that he was not prepared to negotiate on the price. By this time the church had been unoccupied for over four years and, in the absence of any improved offer, the Church decided that it no longer wished to proceed with the project and withdrew from the negotiations. The deal was off.
40. Mr Connellan confirmed in oral evidence that his solicitors kept him fully informed of the negotiations which were going on between them and the Church’s solicitors, Trethowans LLP. Estoppel
41. It is the Applicants’ case that the Option Agreement expired on the Long Stop Date and, in the absence of any new agreement having been concluded, that is the end of the matter. The Respondents’ case is that the Option Agreement is still alive and enforceable. The details given in the Respondents’ Statement of Case are brief. It is averred that: “… the issue of the Long Stop Date was discussed with the Applicant, and the Respondents were assured that this would not be an issue. As a result of this the Respondents continued to invest time and money into the project on the representation so the Applicant”. “So” in the last sentence should presumably have been “of”. 42 On this basis, the Respondents rely on (1) proprietary estoppel; (2) estoppel by representation; (3) estoppel by convention (4) contractual estoppel and (5) Waiver by Estoppel. No submissions were made on “contractual estoppel” and it was not claimed that there had been any variation of the Option Agreement. In relation to each of the remaining estoppel claims, the Respondents’ case is essentially: (a) Mr Brown had been orally assuring the First Respondent that the Long Stop Date was of no consequence and that it did not matter thus treating the Option as continuing. (b) Both parties continued to consider the Option was in force on the basis of the representations made by Mr. Brown. (c) The Respondents therefore continued to invest time and money into the project on the basis of Mr. Brown’s representations.
43. Each of the estoppel arguments is a variation on a theme. The Respondents say that the matters which the Respondents would need to establish in relation to each are that: Proprietary Estoppel
1. The Applicants made a representation or assurance to the Respondents that the Respondents have or will obtain some right or benefit in relation to the Property ;
2. The Respondents relied on that representation or assurance;
3. The Respondents suffered detriment caused by their reliance on the assurances. The Respondents would also need to show that it would be unconscionable for the Applicants to go back on their assurances. Estoppel by Convention The parties conducted their dealings on an assumed state of fact or law, either because they both share the assumption, or because one assumes and the other acquiesces in it, and it becomes unjust or unconscionable for one party to depart from that shared assumption. Estoppel by Representation The Applicants, by words or conduct, made a representation of fact (or law) to the Respondents objectively intending the Respondents to act on it, and the Respondents did act on it to their detriment. Estoppel by Waiver Waiver by estoppel is established where a party has two inconsistent rights and chooses between them. The Respondents say that choice was terminate or affirm the Option Agreement and that once made the election is final.
44. The common situation where an estoppel by waiver arises is where there is a breach of covenant in a lease and the landlord has to elect whether to exercise its right to forfeit the lease or, alternatively, to exercise its right to treat the lease as continuing. I cannot see how an estoppel by waiver could arise in this case. On the expiry of the Long Stop date in the Option Agreement, the Applicants did not have two inconsistent rights – or indeed any rights. The Applicants had no right to enforce the Option Agreement after the Long Stop Date. The agreement was at an end and the Church could not “choose” to terminate it or to affirm it.. Although the Church could choose to try and negotiate a new deal (which might include ignoring the Long Stop Date) with the Respondents, neither party had the right to compel the other to do so.
45. As regards the estoppel by convention argument, the Respondents’ submissions that there was a shared assumption that the sale would proceed as per the Option Agreement, brushed over the fact that “the sale” would be a different sale to that provided for in the Option Agreement because the Respondents were unable to grant the Residential Lease. I cannot see how there can be a shared assumption that the Long Stop Date can be ignored and the Option transaction “would be implemented” if the Respondents were not in a position to implement it. Both parties’ solicitors proceeded on the basis that a new contract for sale would be entered into. Ms Humphrey made it clear in her email of 11 th May 2023, that the fact that the new deal no longer involved the leaseback of a flat to the Church created a problem in that there would need to be a re-valuation in order to comply with the Charity Act 2011. This was not disputed by the Respondents’ solicitors so they must have recognised that the price could (and almost certainly would) differ. The Respondents’ pleaded case and Mr. Connellan’s witness statements made no mention of any alternative “sale” having been agreed.
46. As regards the remaining estoppel claims, the Respondents need to show that there was (1) a clear and unambiguous representation by the Church that the Long Stop Date would be waived and that the Option Agreement would be implemented in its current form (2) that the Respondents relied on that representation (3) to their detriment and (4) it would be unconscionable for the Church to deny that the Option Agreement is still enforceable. Representation or Assurance
47. The Respondents accept that there is no documentary evidence that Mr. Brown made any representations that the Long Stop date did not matter. Instead, Mr Connellan relies on alleged oral representations. Mr. Connellan provided two witness statements. In his first witness statement, Mr. Connellan said: “11. Then I was dealing mainly with one particular trustee, Terry Brown. I had a good relationship with Terry throughout. He assured me on many occasions that the Long Stop Date did not matter, he understood the reasons for the delays and we would continue with the project. ln reliance on this, I continued with trying to get the project completed. Had the Long Stop date been an issue, I would not have continued to progress the project “12. Following the passing of the Long Stop Date, again in reliance on discussions with Terry, I continued to try to bring the project to fruition. Terry was very much involved in the process and I spoke to him regularly. To give assurances that the purchase would go ahead once the matters had been ironed out, I had lodged the remainder of the purchase monies (£90,000) with my solicitors.” No further detail of the discussions was provided in this witness statement.
48. Mr. Connellan’s second witness statement goes into a bit more detail. Mr Connellan confirmed that the first time Mr. Connellan spoke to Mr. Brown was on 19 th February 2022. This was before the Long Stop Date and Mr. Connellan does not state positively that the Long Stop Date was discussed at that meeting or at the Council Planning Committee Meeting which he now accepts Mr. Brown did not attend (albeit he watched it on livestream).
49. Mr Connellan says that the assurances given by Mr. Brown were made during telephone conversations and has produced his phone records which show that he called Mr. Brown on 11 occasions between 6 th November 2023 and 19 th March 2024. He says that during these calls there was no mention of the transaction not going ahead. Throughout this period both parties had solicitors acting for them who were negotiating a new agreement for sale, lease, guarantee and other documents. These new documents, if agreed, would have enabled a sale to go ahead in a revised form, i.e., without the grant of the Residential Lease, without the need for an option (because planning permission had been granted in principle by that date) and with a guarantee. Mr. Connellan says that in or around November 2023, Mr. Brown said: “don’t worry about the long stop issue, we aren’t going to invoke it”. This was over a year and a half after the Long Stop date had expired and around the same time that the Church’s solicitors had written to the Respondents’ solicitors stating that the Church was becoming frustrated by the delays and the deal could fall through.
50. Mr. Connellan claimed in oral evidence that Mr. Brown regularly referred to the Long Stop date and said “don’t worry about the Long Stop Date”. He gave no further details as to when these alleged representations were made.
51. Mr. Brown said that he had no recollection of ever saying “don’t worry about the long stop issue”. By November 2023 (the date on which Mr. Connellan relies) he was clear that the Option had expired and, while the Church was keen to continue with the project, he would have said that the Church needed to follow the legal advice on the way forward. Mr. Brown said that as a trustee, he was required to take legal advice to make sure the Church was complying with Charity law. He said he was not the decision maker and was not even a trustee until March 2023.
52. Mr. McCarthy sought to split the “representations” into two periods – before solicitors were instructed and after solicitors were instructed. The first period ran between the Long Stop Date, 31 st March 2022, and April 2023. In his Skeleton Argument, Mr. McCarthy relied on: (1) The Applicants making an application to the Charity Commission seeking retrospective authorisation for entering into the Option from the Charity Commission in May 2022. The Respondents were not party to this application and there was no evidence that they were even aware of it until Mr. Brown notified him that consent had been given in November 2022. (2) The Applicants’ newsletter dated July 2022 referring to activation of the option agreement. Again, there was no evidence that the Respondents saw this newsletter. (3) The fact that Mr. Brown cancelled a meeting to discuss extending the option agreement or signing a new option agreement because Mr. Connellan had said there was no legal requirement to do so. This email was not copied to the Respondents and merely recites a representation made by Mr. Connellan to Mrs Firth. Mr. Brown was not a legal person whereas Mr. Connellan was representing (incorrectly) what the legal position was. This is not a representation by the Applicants to the Respondents. (4) The Applicants’ newsletters dated September 2022 and February 2023 referred to the s. 106 agreement required by the planning permission. There was no evidence that either of these newsletters was seen by the Respondents. In any event, the s. 106 agreement would have been necessary for any new agreement. (5) In November 2022, the Applicants obtained retrospective consent for the Option Agreement. This consent was not addressed to the Respondents albeit Mr Brown notified Mr. Connellan of it. (6) Between November 2022 and March 2023, Mr Connellan and Mr. Brown spoke on the telephone. Mr. Connellan does not refer to any of these phone calls in his witness statements. Most of these calls were very short and Mr. Brown says they mainly related to requests for updates from Mr. Connellan. Mr. Brown said that he was not sure what update Mr. Connellan was expecting because the Church was waiting for him to instruct solicitors.
53. None of these issues are referred to in the Respondents’ Statement of Case or either of Mr. Connellan’s witness statements. During this period Mr. Brown was not a trustee of the Church and had no authority to agree anything. At that stage the Church did not have legal advice. While it is clear that Mr. Brown and the Church were keen for the Property to be redeveloped, there is nothing to suggest that they gave any thought to the mechanics of how this would be done. This was to be dealt with by solicitors in the usual way. In my judgment none of these matters amounts to an unambiguous representation by the Applicants to the Respondents that they would ignore the expiry of the Option Agreement and proceed to completion irrespective of the fact that the Respondents were unable to comply with its terms. The Respondents’ case during this first period is extremely thin.
54. The second period is after solicitors were instructed. Mr. Connellan indicated he was instructing solicitors in November 2022 but it seems there was some delay in his doing so.. The Church instructed Trethowans LLP in about March 2023. There is nothing in the solicitors’ correspondence referring to any assurance that the Long Stop Date should be ignored. Ms Humphrey made it clear that the Option Agreement had expired in her very first email to Merali Beedle LLP and indicated that new documentation for the proposed revised deal would be required.
55. The issue of whether the alleged oral representations were made by Mr Brown is a question of fact. As there is no documentary evidence to support these representations having been made, I must rely on the oral evidence of Mr Brown and Mr. Connellan.
56. Mr. Connellan’s evidence was that he is not an experienced developer and took a lot of matters on faith. He said he had no knowledge of the legal stuff and no-one ever mentioned to him that a new option or new agreement was proposed after the expiry of the long stop date. He said he probably wouldn’t have objected as he just wanted to get the project done. When asked why he agreed to provide a £400,000 guarantee which he was not required to give under the terms of the original Option Agreement, he said that Mr. Brown had asked for it and he agreed. When asked why the solicitors’ correspondence referred to a new agreement if the original option was still enforceable, Mr. Connellan said he just acted in good faith. Everything was fine, he said, until he questioned the valuation obtained by the Church for the purposes of complying with the Charities Act.
57. On the issue of the Residential Lease which was to be granted under the original Option Agreement but for which planning permission had been refused, Mr. Connellan said the Church would get the space on the ground floor and they could then go back to the Council to get the planning permission changed to allow for a flat. Given that the application for planning permission which included the ground floor flat had been rejected, this seems rather unlikely. 58 I found Mr. Connellan’s evidence wholly unconvincing. Mr. Connellan was the lead player in the proposed development. Whether or not Mr. Connellan was an experienced developer, he was clearly knowledgeable about property matters – he recited figures relating to build costs and values per square foot with ease. The Church’s second valuation report estimates the cost of building this development at £2.35 million and Mr Connellan agreed to a guarantee of £400,000 even though this was not required under the terms of the original agreement. In other words, a lot of money was at stake.
59. It is inconceivable that Mr. Connellan would not have read the Option Agreement and realised that his investment was at risk unless he persuaded the Church to agree to the new terms and/or extend Option period. If Mr Brown had made any representations waiving the Long Stop Date indefinitely, it would have been a simple matter to record these in an email or to insist that such re-assurance was given in writing. Mr. Connellan did not do so.
60. The parties’ solicitors began corresponding in April 2023. At no point in that correspondence did Merali Beedle dispute that the Option Agreement had expired or claim that the re-drafting of the documentation was not required because the Church had agreed to ignore the Long Stop date. This indicates that Mr. Connellan had not instructed his solicitors that this was the case. The solicitors’ correspondence is not consistent with the implementation of the existing Option Agreement. It repeatedly refers to a new agreement for sale and the negotiations involved matters which were not required by the original deal, in particular, the guarantee. I do not accept that Mr Connellan would have given a £400,000 guarantee unless this was essential to a new deal being agreed.
61. By contrast I found Mr. Brown to be an honest and careful witness. I accept that Mr. Brown did not assure Mr. Connellan that the Long Stop could be ignored or that the Option Agreement remained live in its current form. While, Mr. Brown was enthusiastic about a development taking place, he recognised that the mechanics needed to be dealt with by solicitors. Those solicitors advised that the existing Option Agreement had expired and both parties then proceeded on the basis that they would enter into a new arrangement. As with all sales of property, both parties hoped those negotiations would culminate in a transfer but that transfer was “subject to contract”. Either party was entitled to pull out. Detrimental Reliance
62. Even if I had been satisfied that the Church had made any representations to the effect that the Option Agreement in its current form would continue, the Respondents would need to show that they relied on those representations to their detriment. The only reliance and detriment pleaded is that Mr. Connellan continued to invest time and money in the project. No evidence of any time or money spent was produced. In oral evidence, Mr. Connellan relied on the money he had spent in obtaining planning permission but, of course, this all preceded the expiry of the Option Agreement or any of the alleged representations. It was also suggested that Mr. Connellan had spent money complying with the obligations in the s. 106 Agreement required by the planning permission. However, I was not told what these obligations were or what was done to comply with them. The only obligation referred to related to the Church providing 20 hours of community use.
63. The Respondents presumably incurred legal costs after the expiry of the Long Stop Date. Those costs were incurred in the hope that a new deal could be entered into and the costs already expended on obtaining planning would not have been wasted. Unconscionability
64. This was a commercial deal. Both parties were represented by solicitors when the Option Agreement was drafted and the wording of that agreement is clear. The Respondents failed to exercise the Option during the term of the Option Agreement. The Church entered into negotiations in good faith for a new agreement but those negotiations were subject to contract and subject to Charity Commission approval. There is nothing unconscionable about the Church refusing to enter into an agreement which had not been finalised. I reject Mr. McCarthy’s submission that the solicitors were merely implementing the existing Option Agreement. The existing Option Agreement had expired and involved a different deal whereby the Church would be granted a leaseback of a flat.
65. I am satisfied that the Long Stop Date was not waived by any of the forms of estoppel or waiver relied on by the Respondents. The Charities Act 2011
66. It was common ground that any disposal by the Church needs to comply with the requirements of the Charities Act 2011 . The Church obtained legal advice, after entering into the Option Agreement, that the transaction required the approval of the Charity Commission under s. 105 of the Charities Act 2011. Section 105 does not specifically concern dispositions. It gives the Charity Commission power to sanction any action proposed or contemplated in the administration of a charity which it considers expedient in the interests of the charity, whether or not it would otherwise be within the powers exercisable by the charity trustees in the administration of the charity. The Church obtained retrospective approval for entering into the Option Agreement on 22 nd November 2022. As the Option Agreement did not transfer an interest in land, the requirements of s. 117 of the Act (which relates to dispositions) were not engaged - see Bayoumie v Womens Total Abstinence Educational Unit Ltd [2003] EWCA Civ 1548 paras 27-42.
67. However, both Counsel agreed that the transfer of the freehold subject to the leaseback of the church only would need to comply with the requirements of s. 117 which requires a Court order or Charity Commission approval for the disposition. No such approval has been granted. Unless and until such approval is obtained, any transfer would be void – s. 117 Charities Act 2011 , Bayoumie para 43.
68. There is a saving provision in s. 122 (5A) of the Act in favour of a person who (whether under the disposition or afterwards) in good faith acquires an interest in the land for money or money’s worth. If this is the case, the disposition will be valid even if the disposition has not been sanctioned by the court or the Charity Commission. As the Respondents are now well-aware that the proposed disposition is by a non-exempt charity and requires approval, it is impossible to see how this saving provision could apply. The transfer now proposed is not the same as the transfer proposed in the Option Agreement and the approval given for that transaction was only valid for a year.
69. Over 4 years after the expiry of the Long Stop date, the Respondents have not sought to exercise the Option which they say persists. However, even if they were able to do so, the resulting transfer would be void. Any claim for specific performance would fail because it would be in breach of s.117 of the Charities Act 2011 . It was submitted by Mr. McCarthy that this difficulty could somehow be got round by negotiating on the new price to be paid by the Respondents and subsequently seeking the Charity Commission’s approval of the new deal. This solution seems to me merely to highlight the fact that what the parties were negotiating was a wholly new deal not the implementation of the old deal. Conclusion
70. The Option Agreement has expired and is no longer enforceable. I am not satisfied that the Option Agreement continues as a result of any estoppel or waiver. It follows that the Applicant is entitled to the removal of the unilateral notice which protected that Option Agreement.
71. The usual rule is that costs follow the event and my preliminary view is that the Respondents should pay the Applicants’ costs of this application from the date on which it was transferred to this Tribunal – 29 th April 2025 – on the standard basis.
72. Any party who wishes to make an application for costs should file and serve by email (a) written submissions on the principle of who should pay costs and upon what basis and (b) provide a schedule of the costs claimed in or substantially in the form of Court Form N260 on the Tribunal and on the other party by 5 pm on 17 th June 2026.
74. If such costs application is served, then the recipient should file and serve by 5 pm on 1 st July 2026 their submissions in response.
75. The party applying for costs may then file and serve a brief response by no later than 5 pm on 15 th June 2026.
76. The Tribunal will then give its decision on who should pay costs and make any further directions in relation to the determination of those costs. Judge Nicola Muir Dated this 3rd June 2026 BY ORDER OF THE TRIBUNAL