His Honour Judge Charman

1. This is the Defendant’s application for summary judgment and to strike out the claim. Background

2. The claim is of professional negligence against the Defendant firm of solicitors (“Murria”) in connection with the development of a site at Lichfield Road, Willenhall (“the Land”). The Land is owned by the Third Claimant (“Aureation”). The First and Second Claimants were the shareholders in and directors of Aureation. Aureation developed the Land by constructing flats and carried out construction work.

3. The completion of the development of the land required the connection of electricity. The connection had to come from a nearby electricity substation. Connection of electricity required a cable from the substation to pass through a parcel of land owned by Aureation and a second parcel of land owned by the housing association Walsall Housing Group (“WHG”).

4. Once the cable had been laid, Western Power Distribution (“WPD”) would own and maintain it and so required rights of access to it. WPD appointed Geldards Solicitors to act for it in its dealings with the two affected landowners.

5. In June 2017, Datom, an independent connection provider, was appointed by Aureation to arrange for the electricity connection to be made and it liaised with WPD on behalf of Aureation.

6. On 25 April 2018, a deed of grant (the “1 st DOG”) was entered into between Aureation and WPD to give WPD the rights necessary to run the electricity over Aureation’s land.

7. A further deed of grant in favour of WPD over WHG’s land (the “2 nd DOG”) was only agreed in December 2018. However, on 14 November 2018, LSC, the lender financing the development of the Land, appointed Law of Property Act Receivers over the Land. The Receivers sold the Land at a price which left a substantial shortfall on the sum owed to LSC by Aureation. Aureation was insolvent and LSC called upon the personal guarantees given to it by the First and Second Claimants. LSC eventually obtained judgment on the guarantees and petitioned for the bankruptcy of the First and Second Claimants. They were declared bankrupt on 2 July 2024.

8. In the meantime, the Claimants had commenced this claim in December 2023. The Claim

9. The Claimant’s case as pleaded in their Re-Amended Particulars of Claim may for the purposes of this application, be summarised as follows: (1) In or about August 2017 they retained Murria to carry out all conveyancing work required from WPD / Datom to bring electricity to the Land. (2) As a result of Murria’s negligence, the Claimants believed that the 1 st DOG was sufficient to enable electricity to be connected to the Land and it was not until either June 2018 or alternatively September 2018, that they became aware that the 2 nd DOG was also required. (3) In breach of duty, Murria did not inform the Claimants of the need for the 2 nd DOG and closed its file on 6 June 2018. (4) Had Murria acted to the standards of reasonably competent solicitors, it would have made the Claimants aware of the need for rights to be granted over WHG’s land in early 2018, in particular following its receipt of emails on 1 February and 9 March 2018 which should have alerted Murria to the need for the 2 nd DOG and of the need to inform the Claimants. (5) At paragraph 24 of their Re-Amended Particulars of Claim, the Claimants say that: “At all material times, the Claimants proceeded on the basis that the grant of the First Easement was all that was required to bring electricity into the site.” (6) At paragraph 29 of their Reply, the Claimants state “. the Claimants only became aware that the new supply was to run through land belonging to WHG … after ... the Defendant exchanged emails with Geldards in September 2018 …” . (7) This caused the Claimants loss because, as stated in paragraph 85 of the Re-Amended Particulars of Claim: “It is the Claimants’ case that had they been made aware of the need for the Second Easement in early 2018, then they (either by themselves or by instructing the Defendant) would have chased WPD/WHG in relation to the same at that point in the same way that WPD/WHG were in the event chased in September to November 2018. The steps that were in fact taken by WPD/WHG in September to November 2018 would thus have taken place by May (alternatively July 2018) at the latest.” (8) If that had occurred, the 2 nd DOG would have been completed and electricity connected to the Land by May or alternatively July 2018, and that would have led to the development of the Land being completed in time to refinance the borrowing from LSC before it appointed Receivers. (9) That in turn would have led to Aureation realising a profit of £794,000 which it lost, or alternatively, it suffered a loss of an income of £156,000 per annum; and the First and Second Claimants avoiding liability to LSC of £6.1 million and the legal fees of £524,000 they incurred in disputing that liability.

10. Murria denies breach of duty and causation and disputes quantum. The claim is listed for trial of preliminary issues commencing on 14 September for 5 days.

11. Murria has applied for summary judgment or alternatively to strike out the claim following an application for non-party disclosure from WPD, WHG, Datom and Geldards. Each agreed to provide disclosure and has done so. Murria relies upon the material produced and seeks to have the claim dismissed to avoid the costs of a trial which it will otherwise incur in responding to claims advanced by what it says are impecunious litigants in person.

12. The parties have provided disclosure to each other and have agreed that exchange of witness statements be put back to 21 August.

13. On the application, Murria has been represented by counsel Mr Miles Harris. The First Claimant, Mr Kumar, has represented the Claimants. Each provided a very helpful skeleton argument for which I am grateful. I am also grateful to them both for the courteous way in which they have advanced their respective cases. I also note with approval the courteous and efficient way in which Mr Kumar has conducted the litigation as a litigant in person on behalf of the Claimants.

14. I have considered and taken into account everything that was before me and I will refer to the evidence as necessary throughout this judgment. I have attempted to distil into this judgment only such material as is necessary for the parties to understand what I have decided and why. My not mentioning a particular matter should not therefore be treated as my having overlooked it. The Issues

15. Murria says that summary judgment should be granted or the claim struck out on the following grounds: (a) The claims of the First and Second Claimants vested in their trustees when they were declared bankrupt. Those claims have not been assigned to them by their trustee in bankruptcy. Therefore, they have no standing to bring their claims. (b) In any event, the claims of all 3 Claimants have no real prospect of success because the documents obtained via the non-party disclosure demonstrate that: (i) They have no real prospect of showing that they were unaware of the need for WHG to grant rights over its land and therefore, of making out their claim as to causation; and/or (ii) They have no real prospect of showing that Murria was retained to do more than secure the 1 st DOG and therefore of making out their claim as to breach of duty. The Law Summary Judgment

16. CPR 24.3 provides that the court may grant summary judgment to a defendant where a claim has no real prospect of success and there is no other compelling reason for a trial. The principles to be applied when considering a summary judgment application are set out in the notes to the White Book at 24.3.1 and the following notes. At 24.3.1 they are summarised as follows: “ The following principles applicable to applications for summary judgment were formulated by Lewison J in Easyair Ltd v Opal Telecom Ltd [2009] EWHC 339 (Ch) at [15] and approved by the Court of Appeal in AC Ward & Sons Ltd v Catlin (Five) Ltd [2009] EWCA Civ 1098 ; [2010] Lloyd’s Rep. I.R. 301 at [24]: i)The court must consider whether the claimant has a “realistic” as opposed to a “fanciful” prospect of success: Swain v Hillman [2001] 1 All E.R. 91 ; ii)A “realistic” claim is one that carries some degree of conviction. This means a claim that is more than merely arguable: ED & F Man Liquid Products v Patel [2003] EWCA Civ 472 at [8]; iii)In reaching its conclusion the court must not conduct a “mini-trial”: Swain v Hillman; iv)This does not mean that the court must take at face value and without analysis everything that a claimant says in his statements before the court. In some cases it may be clear that there is no real substance in factual assertions made, particularly if contradicted by contemporaneous documents: ED & F Man Liquid Products v Patel at [10]; v)However, in reaching its conclusion the court must take into account not only the evidence actually placed before it on the application for summary judgment, but also the evidence that can reasonably be expected to be available at trial: Royal Brompton Hospital NHS Trust v Hammond (No.5) [2001] EWCA Civ 550 ; vi)Although a case may turn out at trial not to be really complicated, it does not follow that it should be decided without the fuller investigation into the facts at trial than is possible or permissible on summary judgment. Thus the court should hesitate about making a final decision without a trial, even where there is no obvious conflict of fact at the time of the application, where reasonable grounds exist for believing that a fuller investigation into the facts of the case would add to or alter the evidence available to a trial judge and so affect the outcome of the case: Doncaster Pharmaceuticals Group Ltd v Bolton Pharmaceutical Co 100 Ltd [2007] F.S.R. 3 ;”

17. The authorities were also reviewed by Cockerill J in King v Stiefel [2021] EWHC 1045 (Comm) who observed at [21]: “The authorities therefore make clear that in the context of summary judgment the court is by no means barred from evaluating the evidence, and concluding that on the evidence there is no real (as opposed to fanciful) prospect of success. It will of course be cautious in doing so. It will bear in mind the clarity of the evidence available and the potential for other evidence to be available at trial which is likely to bear on the issues. It will avoid conducting a mini-trial. But there will be cases where the Court will be entitled to draw a line and say that - even bearing well in mind all of those points - it would be contrary to principle for a case to proceed to trial.”

18. As Mr Kumar points out, where reasonable grounds exist for believing that a fuller investigation of the facts would add to or alter the evidence, the case is not generally suitable for summary judgment. However, Mr Kumar has not explained how that principle assists the Claimants in responding to the application which is based on extensive non-party disclosure of contemporaneous documents, many of which the Claimants were party to. Further, this is a case where it is the Claimants and not Murria who could have more documents going to the matters in issue. Murria’s documents are what is on its matter file, and they have already been disclosed.

19. Mr Kumar submits that summary judgment may be inappropriate where the central question is one of inference from primary facts. I agree with Mr Kumar that where a case turns on a person’s knowledge or honest belief the evidence is likely to need to be more compelling in order to demonstrate that the absence of a real prospect of success. However, each case depends upon its particular facts, and the court is entitled to grant summary judgment where that involves a finding as to a person’s honest belief provided the particular facts put before the court on the application justify it. That would be so even where to do so requires the making of a summary finding of bad faith (which is not necessary in this case) as was confirmed by the Court of Appeal in Wrexham Association Football Club Ltd v Crucialmove Ltd [2006] EWCA Civ 237 .

20. I apply these principles in considering the application for summary judgment. Strike Out

21. CPR 3.4(2) (b) provides that a claim may be struck out where a statement of case is an abuse of the court’s process or is otherwise likely to obstruct the just disposal of the proceedings. A Solicitor’s Duty to Advise

22. The Claimants’ case alleges that Murria failed to provide advice in circumstances where it should have advised on the need for the 2 nd DOG. The law as to the extent of a solicitor’s duty to advise was conveniently summarised by Jackson LJ in Minkin v Landsberg [2016] 1 WLR 1489 at [38] as follows: “Let me now stand back from the authorities and summarise the relevant principles: (i) A solicitor s contractual duty is to carry out the tasks which the client has instructed and the solicitor has agreed to undertake. (ii) It is implicit in the solicitor’s retainer that he/she will proffer advice which is reasonably incidental to the work that he/she is carrying out. (iii) In determining what advice is reasonably incidental, it is necessary to have regard to all the circumstances of the case, including the character and experience of the client. (iv) In relation to (iii), it is not possible to give definitive guidance, but one can give fairly bland illustrations. An experienced businessman will not wish to pay for being told that which he/she already knows. An impoverished client will not wish to pay for advice which he/she cannot afford. An inexperienced client will expect to be warned of risks which are (or should be) apparent to the solicitor but not to the client. (v) The solicitor and client may, by agreement, limit the duties which would otherwise form part of the solicitor s retainer. As a matter of good practice the solicitor should confirm such agreement in writing. If the solicitor does not do so, the court may not accept that any such restriction was agreed.”

23. I apply that guidance where it is relevant in considering this application. (a) Do the First and Second Claimants have standing to bring the claims?

24. It is well-established, and Mr Kumar sensibly and helpfully accepts, that on bankruptcy the bankrupt’s entire estate vests in his trustee in bankruptcy and that includes any causes of action he may have, other than claims for personal injury which are not relevant to this claim.

25. Mr Kumar accepts that his and the Second Claimant’s claims vested in their trustee in bankruptcy and that therefore they currently have no standing to pursue their claims.

26. The evidence is also clear that the Trustee in Bankruptcy, Mr Paul Palmer, has no intention to pursue the claims or any similar claims. Pursuant to my order of 7 January 2026, he was approached to confirm his stance as to proposed amendments to the claim being put forward by the First and Second Claimants. His solicitors responded in a letter dated 9 February 2026, stating that he took a neutral stance, had no funds to pursue the litigation and would be prepared to assign the claims to any of the parties.

27. It follows that the current position is that the claims advanced by the First and Second Claimants should be struck out because they have no standing to pursue them. However, Mr Kumar submits that I should not strike out the claims because he and the Second Claimant are in the process of obtaining an assignment of the claims from Mr Palmer. He says that I should stay their claims for a period to enable that assignment to take place. He has provided copies of email exchanges he has had with the Mr Palmer’s solicitors, which he says evidence that he is in the process of obtaining such assignments.

28. Mr Harris sensibly accepts that the correspondence indicates that Mr Kumar has negotiated with Mr Palmer’s solicitors and reached agreement as to the terms upon which any cause of action which he has against Murria may be assigned to him. The terms include that he makes a payment to the bankruptcy estate and pays the costs of Mr Palmer’s solicitors for drafting the necessary documents.

29. Mr Kumar has filed evidence indicating that he has available funds to meet those costs. The agreement was only reached very shortly before the hearing so is not yet in place.

30. Mr Kumar also says that the Second Claimant wishes to purchase the causes of action against Murria which vested in her trustee. He says that Mr Palmer is very likely to be willing to assign the cause of action to her on similar terms.

31. In response, Mr Harris says that Mr Kumar has had considerable time to deal with the assignment but appears to have only started dealing with it relatively recently. He submits that the First and Second Claimants have not acted with any diligence to resolve the situation. The Court is required to consider now whether they have standing to bring their claims and they do not. I consider that there is force in those points.

32. In my judgment, when the parties are due to exchange witness statements on 21 August in respect of a trial listed to commence on 14 September, a stay would be inappropriate and not consistent with the interests of justice as stated in the Overriding Objective. However, the evidence which Mr Kumar has put before the court does indicate both that the terms for the assignment of his cause of action have just been agreed and that he has the funds to satisfy those terms. I also accept that it is very likely that the same trustee in bankruptcy advised by the same solicitors will be willing to assign the Second Claimant’s identical purported cause of action against Murria to her on the same or similar terms. I have not been provided with evidence that she will have the funds available to satisfy such terms.

33. In my judgment, given that the evidence indicates that Mr Kumar has agreed terms for an assignment of the cause of action and is able to meet the terms for that assignment and it is simply a matter of the drawing up of what are fairly straightforward documents, it is in the interests of justice to permit some time for that to be done. However, it should not take long and given the proximity of the date for exchange of witness statements, Murria is incurring costs in dealing with this matter. It also appears that its prospects of recovering those costs against the Claimants if it successfully defends the claim are slim. If I am satisfied that the claim has a real prospect of success, then I will make an order giving the First and Second Claimants leave to pursue the claim conditional on their filing and serving a valid assignment to them from their trustee in bankruptcy of the causes of action which they advance in this action by 4.30pm on 31 July 2026. (b) Cs have no real prospect of showing that they were unaware of the need for a grant of rights over WHG’s land (i) Causation

34. As I have already explained, in order to make out the causation of their claims, the Claimants need to show that they were not aware of the need for the 2 nd DOG. If they were so aware, then any failure of Murria to inform them of that need did not cause them loss. It is therefore essential to the claims advanced by the Claimants that they were not aware of the need for the grant of rights over WHG’s land to enable electricity to be connected to the Land.

35. Murria says that contemporaneous documents demonstrate that the Claimants clearly were aware of the need for electricity cabling to cross WHG’s land and for rights over that land to be granted to WPD to enable electricity to be connected to the Land. Mr Harris submits that it must follow that the claim has no real prospect of success.

36. In his submissions, Mr Kumar did not really dispute that premise. He maintained that on the evidence, the Claimants have a real prospect of showing that they remained ignorant of the need for the 2 nd DOG.

37. I agree with Mr Harris that in order to succeed with their claim, the Claimants do need to show that on the balance of probabilities, they would have acted much more quickly and obtained the 2 nd DOG before the receivers were appointed in order for their claim to succeed. Further, in order to have a real prospect of establishing that, they need to show they were not already aware of the need for the 2 nd DOG in sufficient time to have so obtained the 2 nd DOG. In other words, if Murria was in breach of duty in failing to inform them of the need for the 2 nd DOG as they allege, that breach of duty will only have caused them the losses for which they claim if they were unaware that the 2 nd DOG was required.

38. I therefore need to determine whether on the evidence before me, the Claimants do have a real prospect of showing that they were unaware of the need for the 2 nd DOG, or for the need for a grant of rights to be provided by WHG in order for electricity to be connected to the Land. Mr Harris submits that as the Claimants were aware that a deed of grant was necessary in order for WPD to run a cable through the Land, they must have been aware that a documented grant of a legal right would be required in order for a cable to be run through any necessary third party’s land. He says that the Claimants are property developers and must have had a general understanding of the rights required to develop a site. Mr Harris further submits that the Claimants’ pleaded case that they were not aware that in order for electricity to be connected to the Land, a new cable would need to be run from the nearest appropriate electricity substation is not credible.

39. Mr Harris relies upon a number of documents disclosed by the non-parties which he says clearly demonstrate that the Claimants certainly did know that a documented grant of a right to run a cable over WHG’s land was necessary in order for electricity to be connected to the Land in either late summer 2017 or early spring 2018. The following are some of those documents and those which, in my judgment are of the greatest probative value as to the state of the Claimants’ knowledge when they were sent: (a) An email dated 14 August 2017, from Richard Park at Datom to Mark Worthington, the Claimants’ site manager / site agent, which stated “WPD legal will come to you direct as discussed for your land but there are legals for going through WHG’s land that they will only deal with Datom on this so I will pass the cost through once received. In summary • 1 x legals for Aureation land • 1 x legals for WHG land” (b) An email on 25 April 2018, from Richard Park at Datom (who had been engaged by Aureation to arrange the connection of electricity to the Land) to Mr Kumar, which stated “Lesley has also sent the details over for the WHG contact as you need to speak with them to arrange payment of the legal fees …” and “As we have been saying for some time now the legals will need to be in place with WHG before we can put the cable in the path/WHG land and energize.” (c) An email on 4 May 2018, from Mark Worthington to Felicity Round at WHG which included the statement “I was asked to contact you by Richard Dewsbury regarding the laying of an electrical supply cable that crossed your property.” (d) A telephone message note dated 10 May 2018 at 11.00 am for Felecity Round at WHG recording a telephone message left for her by Mr Worthington which refers to the Land and states “Do you have all the paperwork you need? They are willing to pay all the legal fees. ” Fixed to the message note is a postage note on which is writing “ URGENT Felicity please phone Raj Kumar.” (e) An email from Mr Worthington to Ms Round on 14 May 2018, which stated “Can you please give me an update on the progress on the paperwork for the above site. I confirm we will be paying the legal fees.” (f) An email dated 15 May 2018, from Ms Round to Charlotte Deakin of Geldards (solicitors for WPD?) and copied to Mr Worthington, which includes the statements “I am waiting for an undertaking from the party who will be paying whg’s costs … I have been wating for this since my email of 28 th November 2017.” Then “I am now being bombarded with various emails and calls from Mark Worthington …”. (g) Another email dated 15 May 2018, this time from Mr Kumar to Ms Round and stating “Further to our conversation, the amount of £600 has been paid to your account. Could you kindly please forward me an invoice.” (h) A reply the same day from Ms Round to Mr Kumar, stating “Our finance team will now produce an invoice, thank you for the payment. I’ll endeavour to get the documents deal with by the end of the week.” (i) An email on 24 May 2018, from Lesley Murphy at WPD to Mr Kumar, stating, “I have spoken to our solicitors, they spoke to Felicity at WHG on 18 th May and said everything was in hand. Our solicitor has not heard from her but will chase Felicity again today.” (j) An email on 20 June 2018, sent by Mr Kumar to Paul Huggins at Shakespeare Martineau who was the solicitor acting for WHG on the 2 nd DOG, headed “230-232 Lichfield Road” and stating “Felicity Round has passed your details on to me as you are dealing with an easement for western power (sic). This matter has been dragging on for a very long time could you please update me as to when it is likely to concluded (sic) as I’m waiting for power to be switched on at my development.” (k) Shakespeare Martineau advised WHG to obtain an independent surveyor’s report and this led to further delays. When this requirement had been communicated to him, Mr Worthington sent an email to Ms Round on 3 July 2018, which included “I have attached a document with two pictures showing the line of the electrical supply from the substation to our site. … As you indicated this is an urgent matter as the “report” has to be submitted to the board meeting for approval due early July. From our part we have tenants waiting to be housed.” (l) Ms Round replied to Mr Worthington, copied to others including Mr Kumar by email the same day. Her reply explained why WHG, as a charity, required an independent surveyor’s report. It also included the statements “I have previously explained to you that the initial instruction came through to whg from Geldards Solicitors on behalf of Western Power so it is Geldards you need to be chasing” and “I am afraid due to the volume of calls and emails from yourself, Josh and Mr Rajinder Kumar if I receive any further communication directly then I am internally instructed to produce a bill for my time.” (m) On 27 July 2018, Ms Round sent an email to Charlotte Deakin at Geldards which includes the statement “It is also important that yourself and Paul are made aware that our chief executive Gary Fulford received the below tweet from Rakinder Kumar yesterday which is ow having to be addressed. Needless to say this does not assist your client (sic) position and is certainly not helping the situation.” The tweet reads “@whgGaryF WHG Solicitors are unreasonably delaying an easement preventing 25 families to move into new accommodation whom have already given notices to current landlords thus no where to go (sic) on the 1 st (sic) . Can you help ??????”

40. Mr Harris also drew my attention to an email sent by Mr Kumar to his then solicitors prior to this claim being issued responding to a request from Murria’s insurers for documents passing between the Claimants and WPD and the Claimants and WHG. Mr Kumar stated in his email to his solicitors on 7 October 2021 “All communications regarding Westernpower (sic) went through Murria, there were no direct communication (sic) between myself and Westernpower or Walsall Housing Group.” Mr Harris submits that the documents to which I have referred (and indeed others) which were obtained by Murria following the non-party disclosure application demonstrate that this was clearly untrue.

41. Mr Kumar’s only response to the submission was to accept that his statement in the email was “too broad”. I agree with Mr Harris. Those documents clearly demonstrate that there was substantial communication with both Western Power and WHG from both Mr Kumar and Aureation’s agent, Mr Worthington, and that what Mr Kumar said in his email to his solicitors on 7 October 2021 was untrue. Whilst damaging to Mr Kumar’s credibility at any trial, I find the email is of limited relevance on this application.

42. In his witness statement, Mr Kumar accepts that he saw the email of 14 August 2017 but says that he did not understand it to mean that a 2 nd DOG or any other legal document was required in relation to WHG’s land.

43. In his submissions in reply, Mr Kumar explained that while property developers, the Claimants were not experienced as this was only their second development. This is not mentioned in his witness statement. He also explained that he had a close and long-standing relationship with Murria. He says that it was a relationship in which he picked up the phone when he wanted something and that details of his instructions were generally not documented. He also says that it was common for work that he telephoned and asked Murria to undertake go far beyond the original retainer, but no new or updated client care letter would be sent.

44. Mr Kumar submits that the application relies on evidence as to what the Claimants knew from third parties and fails to address what Murria knew and what it did with its knowledge as to the WHG land and what it did with the documents it was sent.

45. Mr Kumar says that the Claimants’ case is that they became aware of the need for the 2 nd DOG in June 2018, not September as Murria says. However, in paragraph 24 of his witness statement in response to the application, he states that he was not aware of the need for a second grant until September. Mr Kumar relies on the fact that the draft 2 nd DOG was sent to Murria for approval so that Murria was aware of it, but did not send the draft on to him, tell him about it or chase the finalisation of it. He relies on emails sent by Murria to Geldards on 25 January and 1 February 2018, chasing a response, which he says were not sent to him and he was not told about.

46. Mr Kumar points out that an email from Geldards to Murria on 9 March 2018, refers to a “linked matter” and that he was not told about that either, nor did Murria follow up the “linked matter”. They were sent a copy of the draft 2 nd DOG which provided for consideration for the grant of rights in the amount of £1 rather than the £10,000 included in the final version, and Murria failed to either forward that draft to the Claimants or tell them of it. Murria simply replied that it had “no requirements” as to the draft, as it did not relate to rights to be granted over their clients’ land. Mr Kumar says that this failure was a breach of duty and is a clearly triable issue.

47. Mr Kumar also relies on an email dated 18 April 2018, sent by Geldards to Murria, which stated “I have received a response from my client, and they have informed me that this matter at Lichfield Road can proceed, however my client will be unable to actually begin works until the linked matter, at Lichfield Road, has also completed.” He says that this email includes a clear reference to the need for another document but was neither forwarded to him by Murria nor reported to him. He says that had Murria done so, he would have been aware that something more was required. He also says that Murria should have followed it up with Geldards.

48. Mr Kumar accepts that the correspondence referred to by Mr Harris indicates that he became aware of the need for something further to be done but not that the Claimants were aware that the 2 nd DOG or any formal easement in respect of the WHG land was required before electricity could be connected to the Land.

49. Mr Kumar also points out that the evidence shows that when he became aware of the need for the 2 nd DOG he acted quickly, chased hard, and was able to secure the 2 nd DOG quickly, so that if he had been aware of the need earlier, he would have secured it before the receivers were appointed.

50. Mr Kumar accepts that there is an issue as to precisely what the Claimants knew and when, but he says that this is an issue which can only be resolved by cross examination at trial in order to establish not just what information the Claimants had and when, but also what they understood and when. This is because causation turns on what they understood and when and as novices in property development, they did not understand the significance of the communications referred to by Mr Harris. He says that the court cannot properly make findings as to what they understood and when on a summary basis.

51. Accordingly, the Claimants say in response to the application that their case is not bound to fail and that Murria’s case on the application shows no more than a conflict of evidence which cannot be resolved without a trial.

52. Having considered all of the evidence and arguments put forward by Mr Harris and Mr Kumar, in my judgment, the Claimants have no real prospect of success in establishing that any breach of duty by Murria which they may establish occurred caused them the loss for which they claim. I consider that the following evidence establishes that the Claimants were aware of the need for a legal grant of rights over WHG land to be made to WPD and understood that legal work to grant the rights would be required at the following times: (a) On or about 14 August 2017, when the email from Richard Park at Datom to Mr Worthington informed the Claimants’ site manager / agent that a legal process would be required to enable the cable to go through WHG’s land. In my judgment, it was entirely clear from that email that a cable through WHG’s land would be required and that legal work would need to be done to enable that to take place. I make allowance for their claim that the Claimants were novice property developers on only their second site (which may or may not be right but granting them the benefit of the doubt on this application) but the words used in the email are totally clear. Any person of moderate intelligence in the position of the Claimants would understand from it both that the electricity cable needed to go through WHG’s land and that a grant of legal rights would be required for that to occur. It is also clear from the documents that he has prepared in this claim and his oral submissions that that Mr Kumar is almost certainly of more than moderate intelligence. Importantly, he also knew that a grant of legal rights was necessary for WPD to run a cable under the Land. In my judgment, he has no real prospect of establishing that he did not understand from the email of 14 August 2017, which he accepts he saw at the time, that a similar deed of grant would be required from WHG in respect of its land. (b) If I am wrong about that, alternatively on 25 April 2018, on his receipt of the email from Mr Park of Datom which stated to him “As we have been saying for some time now the legalsl will need to be in place with WHG before we can put the cable in the path/WHG land and energise.” In my judgment, this email sent to Mr Kumar can only be understood as saying that before electricity could be connected to the Land, a cable would need to be run through the WHG land and that legal arrangements would need to be in place before that could occur. That is obvious to anyone reading the email, let alone someone in the position of Mr Kumar who knew of the necessity of the 1 st DOG being entered into before a cable could be run through the Claimants’ own land. The email also shows that Datom had been telling the Claimants that for “some time”. There is room for doubt as to how long was meant by “some time”. In my judgment it must have meant at least a month and possibly considerably longer. In fact, we know that Datom had made this point to Mr Worthington in the email of 14 August 2017, over 8 months earlier. (c) Even if I were wrong about both of those emails, before 10 May 2018, when Mr Worthington left his telephone message for Ms Round at WHG asking if she had all the paperwork she needs and that the Claimants are willing to pay WHG’s legal fees, and Mr Kumar also called Ms Round and left an urgent message for her to call him.

53. In my judgment, that evidence clearly shows that the Claimants were aware of the need for legal work to be done by WHG to grant the right for the cable to be run through its land as they were chasing that very thing. I consider that the Claimants have no real prospect of making out the causation element of their claim as they have no real prospect of establishing that they were not already aware of the need for a legal grant from WHG when those calls were made. The messages demonstrate not only that they knew of the requirement but that they understood that it was necessary for WHG to enter into a legal document before electricity could be connected to the Land.

54. There is further evidence that the Claimants knew and understood the need for a legal grant from WHG on 14 May 2018, in the form of Mr Worthington’s email to Ms Round that day to which I have already referred. Then on 15 May 2018, the email from Ms Round copied to Mr Worthington followed by the payment to WHG followed up by an email from Mr Kumar to Ms Round informing her of the payment. The making of the payment and the terms of the emails are only consistent with the Claimants being fully aware of and understanding the need for WHG to incur legal fees and enter into a legal document in order for electricity to be connected to the Land.

55. The Claimant’s pleaded case as to causation and repeated in Mr Kumar’s witness statement in opposition to the application, is that they were only aware of the need for legal rights to be granted by WHG for that to occur in September 2018. That is the basis for their claim that if they had been told sooner, they would be able to have ensured that the easement was obtained in time. The contemporaneous documentation shows that they in fact knew 11 months earlier, in August 2017.

56. I bear in mind Mr Kumar’s point as to courts being slow to draw inferences as to the Claimants’ knowledge and belief on a summary basis. However, here, the meaning and effect of the emails to which I have referred is entirely clear and there is no real prospect that at trial it will be concluded that the Claimants failed to understand the ordinary meaning of the words used in the emails.

57. It follows that the Claimants knew and understood the need for a grant of an easement by WHG either 13 months, (or if I were to wrong about that, at the latest 5 months) sooner than they claim. The Claimants’ case is that they would have been able to get the necessary easement in place within the same timescale as occurred from September, when they say that they were aware of the requirement, so within about 3 months. The receivers were not appointed until 14 November 2018, some 15 months (or if not, 7 months) from when I have found that they in fact knew and understood that a deed granting an easement from WHG was necessary. Therefore, they have no real prosect of establishing that the breach of duty which they allege against Murria caused them the losses they claim.

58. There is no other good reason why their claim should proceed to a trial. Therefore, Murria is entitled to summary judgment and to strike out the claim against it. (ii) No Duty / No Breach

59. That is sufficient to determine the application. However, in case I am wrong about the causation element of the claim, I shall go on to consider Murria’s submission that the Claimants have no real prospect of showing that Murria was retained to do anything more than obtain the 1 st DOG. Therefore, the claim that it is in breach of duty with regard to the 2 nd DOG has no real prospect of success.

60. The Claimants’ case is that it was a term of Murria’s retainer that they undertake all conveyancing work required to bring electricity to the Land, as pleaded in the Re-Amended Particulars of Claim at paragraph 82 (1). Mr Kumar also points out that the Claimants say that Murria was in breach of duty in failing to act on or pass on the emails received referring to the 2 nd DOG from Geldards on 1 February 2018 and 9 March 2018, the latter attaching a copy of the then draft 2 nd DOG.

61. Mr Harris submits that the emails to which I have already referred demonstrate that the in fact the Claimants were themselves dealing with the obtaining of the 2 nd DOG. He says that those emails demonstrate that through Mr Worthington and Mr Kumar, the Claimants were in very frequent contact with WHG and the solicitors dealing with the 2 nd DOG. In fact, so frequent was their contact that Ms Round at WHG complained about it.

62. Mr Harris relies in particular on the email of 14 August 2017 to Mr Worthington, to which I have already referred. He says that clearly states “… there are legals for going through WHG’s land that they will only deal with Datom on this so I will pass through the cost once received.” Mr Harris says this makes clear that Datom and not Murria was dealing with the grant of rights over the WHG land and that the Claimants knew this before they even instructed Murria. This email predates Murria opening its file by about 7 weeks and predates Murria sending its retainer letter (which the Claimants say they did not receive) by about 4 weeks.

63. Mr Harris relies on Murria’s retainer letter. However, as the Claimants say that they did not receive it and Murria does not have a copy of it signed on behalf of them, I ignore it for the purposes of the current application.

64. Mr Harris points out that there are no documents at all from the Claimants asking Murria about the 2 nd DOG or about any issue relating to rights over WHG’s land at any time, save one email to which I refer below and that when Murria notified the Claimants that it was closing its file on 6 June 2018, they did not respond or complain. The Claimants might say that they were not aware of the need for the 2 nd DOG at that time, but the contemporaneous documents indicate that they were chasing WHG to get the 2 nd DOG in place by that time.

65. Mr Kumar relies on three particular matters in submitting that the Claimants have a real prospect of successfully establishing that Murria owed the duty they contend for and breached that duty. He points to the long-standing relationship with Murria to which I have already referred and to the fact that instructions were generally given by telephone and not in writing and that the scope of the work to be done was often extended or varied by a telephone call without any change to any documentation such as the retainer letter. For the purposes of this application, I shall assume that is correct, but it does not assist Mr Kumar as he does not point to, let alone evidence, any change to the terms of Murria’s retainer. The Claimants’ case is that Murria’s retainer was always to carry out all conveyancing work required from WPD / Datom to bring electricity to the Land from the outset. Therefore, any informality of instruction or change to the terms of the retainer do not assist the Claimants in resisting the application.

66. Mr Kumar relies on an email from Geldards to Murria on 1 February 2018 which was sent in response to a chasing email from Murria about the progress with the 1 st DOG. It was headed “Re Deed of Grant – Lichfield Road”. It began: “Apologies, I believe there has been some confusion. I understand that there are two matters.”

67. Mr Kumar says that Murria was in breach of duty in not either forwarding it to the Claimants, reporting it to the Claimants and in particular the reference to “two matters” and/or in not responding to it by seeking clarification of the second matter and progress with it.

68. Mr Harris says that any contention that Murria owed and breached a duty to act as Mr Kumar says they should has no real prospect of success. He says that it is fanciful to suggest that no reasonable solicitor in Murria’s position would have acted as it did on receipt of the email in the circumstances in which it was received. Mr Harris points out that the email came after a period of silence from Geldards in connection with the 1 st DOG about which the two firms of solicitors had been in correspondence the previous month. It followed Murria chasing an update in respect of the 1 st DOG, as to which the fee earner at Geldards had changed and so the chasing email was referred to the new fee earner, who sent the response referring to the two matters.

69. Mr Harris says that the email did not give a cause for concern but rather confirmed that Geldards were attending to the 1 st DOG. Further, when replying to the email later the same morning, Mr Sharma of Murria copied his email to Mr Kumar. Therefore, Mr Kumar was forwarded the whole email chain, which included, directly below Mr Sharma’s one line email, the email upon which Mr Kumar relies. In response Mr Kumar says that he saw the email from Mr Sharma but did not look through the email chain. There was nothing in Mr Sharma’s email to indicate that he should and he relied on his solicitors who were dealing with the matter.

70. I do not consider that the 1 February email assists the Claimants. I agree with Mr Harris that the reference to two matters was not something that any reasonably competent solicitor would have followed up or reported to their client in the circumstances. Further, by copying in Mr Kumar to the reply, Mr Sharma was making him aware of what was going on. Whilst it was not reasonable to expect that Mr Kumar would look back through the entire email chain, Mr Sharma’s email simply stated “Thank you for your email. I wait to hear from you.” In my judgment, anyone receiving such an email from their solicitor would look at the email to which it refers, being the next email in the chain. Mr Kumar’s witness statement is unclear as to whether he looked at the previous email, being the one in issue but seems to indicate that he did but that he did not understand it. In my judgment, it is overwhelmingly likely that he did so. However, I make no finding as to that on this application. It is sufficient that I find that there is no real prospect that the Claimants will establish that Murria was in breach of duty in doing no more than copying Mr Kumar into the reply to it.

71. Mr Kumar also relies on how Murria did, and did not, act after receiving an email from Geldards on 9 March 2018. The email was sent following Mr Kumar asking Murria to chase Geldards in relation to the 1 st DOG. Murria did that on 9 March and later the same day, Geldards replied attaching a draft of the 2 nd DOG and stating: “Further to this matter, I understand that this is securing cabling only. I note that the definition of easement structure was amended on the linked matter and I would be grateful if you could confirm as to whether this is required on this matter also. I attach a copy of the Deed of Grant for your approval and look forward to hearing from you.”

72. Murria replied by email on 15 March, stating “so far as this deed is concerned we have no requirements and it is noted that our client does not own the land.”

73. Mr Kumar says that this response was in breach of duty and that Murria should have advanced the Claimants’ interests by responding to Geldards and that the Claimants should have been informed of or copied in to the email and/or the response.

74. Mr Harris submits that a reasonably competent solicitor would have done no more than Murria did. He says that as Murria was not instructed in relation to the 2 nd DOG it had no reason to advise the Claimants or report to them as to it. None of the Claimants was a party to the draft 2 nd DOG and it did not relate to the Claimants’ land. There was nothing about the email or the draft to indicate that it was causing or would cause any problem for the Claimants.

75. In my judgment, it is clear from the documentary evidence exhibited to the second, third and fourth witness statements of Sophie Ruffles, the solicitor for Murria, made in support of its application for summary judgment / strike out, that Murria’s instructions were limited to putting place the 1 st DOG (save for specific instructions in June 2018 to chase the 2 nd DOG to which I refer below). The emails to which I have already referred show that it was the Datom who was arranging the 2 nd DOG for the Claimants and that it was Mr Worthington and Mr Kumar who were chasing the solicitors for WPD, Geldards, and WHG and its solicitors, Shakespeare Martineau, to get the 2 nd DOG in place. The Claimants were not chasing Murria.

76. I have already set out at paragraph 40 (b) – (m) some of the examples of Mr Worthington and Mr Kumar being involved with the putting in place of the 2 nd DOG and chasing WHG and Geldards to get it done. The Claimants were not during that period asking Murria for information as to progress with the granting of rights over WHG’s land or why electricity could not be simply connected; nor did they ask Murria to chase Geldards in solicitor-to-solicitor correspondence, as Murria chased Geldards in relation to the 1 st DOG in the emails in January and February 2018 to which I have also referred above. Nor did Mr Worthington or Mr Kumar copy Murria in to any of the chasing emails they sent to Geldards or WHG. The documents clearly show that not only was it the Claimants and their agent Mr Worthington chasing the 2 nd DOG but also, they did not ask Murria about it even when they were, to use Mr Round’s phraseology, “bombarding” WHG with communications chasing it and Mr Kumar was messaging WHG’s managing director on Twitter about the delay in granting the easement.

77. The sheer number and frequency of communications which Mr Worthington and Mr Kumar had with Geldards and WHG combined with the absence of such communications between them and Murria on that subject and at that time, point clearly to Murria not being instructed to do more than obtain the 1 st DOG in respect of the Claimants’ own land.

78. In June 2018, Mr Kumar, for the first time, did contact Murria and ask them to contact Shakespeare Martineau and find out what was causing the delay. It is clear that when he did so, Murria did not already know about the 2 nd DOG and was not already instructed with regard to it. Ms Pardoe of Murria was sent the relevant contact details for Mr Huggins at Shakespeare Martineau and replied to Mr Kumar asking, “what the situation is” and said that she would speak to Mr Sharma about it. Mr Kumar replied and explained that “It’s for the utilities at Willenhall we did the easement for western power on our site but the mains run through walsall housing group (sic) land and they are being a pain. I’ve got 25 tenants waiting to move in but no electric on site.” So, Mr Kumar explained the need for rights over WHG land and did not say that Murria already knew about it or that it was already instructed to deal with it. That is compelling evidence that he did not consider that Murria was already instructed in connection with the obtaining of rights for WPD over WHG’s land.

79. In my judgment these documents provide overwhelming evidence in contemporaneous documents to which the Claimants were a party that Murria was not instructed with regard to the 2 nd DOG or the obtaining rights over third party land, but only with regard to the provision of the 1 st DOG. The Claimants have no real prospect of showing otherwise.

80. The email received by Murria on 9 March 2018 does not alter that and nor was Murria’s dealing with it a breach of duty. Mr Kumar says that Murria should have told him of the need for the 2 nd DOG on receipt of that email or forwarded it and the draft 2 nd DOG to him. However, Murria was not instructed in relation to the 2 nd DOG, it did not relate to the Claimants’ land, they were not parties to it and Murria had not been privy to previous correspondence about it. Murria owed a duty to the Claimants to act as a reasonably competent solicitor undertaking conveyancing work would act on receiving the email. I accept Mr Harris’s submission that the Claimants have no real prospect of showing at trial that Murria was in breach of that duty in dealing with the email as it did.

81. Finally, the Claimants allege that Murria was in breach of duty in how it acted and omitted to act when it received an email from Geldards dated 18 April 2018. The email was in response to an email from Murria chasing progress with the 1 st DOG and wanting to know when it would be finalised. Geldards’ email included “I have received a response from my client, and they have informed me that this matter at Lichfield Road can proceed, however my client will be unable to actually begin the works until the linked matter, at Lichfield Road, has also completed.” The Claimants plead that Murria was in breach of duty by failing to forward the email to them or otherwise inform that electricity could not be brought onto the Land until after a second easement has been granted.

82. As Mr Harris submits, in circumstances where Murria was not instructed other than to obtain the 1 st DOG, there was no duty on it to forward the email to the Claimants or inform them of its contents. Whilst I accept that some solicitors may have done so, the Claimants have no real prospect of establishing at trial that no reasonably competent solicitor undertaking such work would have failed to do so.

83. It follows that the Claimants also have no real prospect of successfully establishing that Murria were in breach of duty as the Claimants allege.

84. There is no other reason why the matter should proceed to trial. Conclusion

85. As I have found both that the Claimants have no real prospect of showing that Murria owed them a duty to deal with the grant of rights over WHG’s land necessary for electricity to be connected to the Land, and that even if they did owe so a duty and could be shown to have breached it, the Claimants have no real prospect of establishing that such a breach caused them to suffer loss, the application is granted. I shall order summary judgment for Murria and dismiss the claim. This is a judgment on the merits of the claim.

86. As noted above, if I had not found that the claim has no real prospect of success, I would have ordered that the First and Second Claimants have permission to pursue the claim conditional on their filing and serving a valid and binding assignment of their respective causes of action against Murria from their respective trustees in bankruptcy by 4.30 pm on 31 July 2026, but that is no longer relevant.

87. The listing of the trial of the preliminary issue will accordingly be vacated. If a hearing is required to determine the form of order consequential on this judgment, and in particular, issues of costs, it will take place on the date and time at which the pre-trial review was listed.