Mr Justice Andrew Baker:

1. The claimant bank applies for summary judgment on a claim against the defendant, Dragados Industrial SA, on what the bank says are straightforward, on, demand indemnities.

2. Those indemnities, provided by the defendant to the bank, were in the nature of counter-indemnities relating to the bank’s commitment under guarantees, which were in the nature of on demand bonds, granted by it to Ma’aden Wa’ad Al Shamal Phosphate Company. Those bonds, and therefore the counter-indemnities on which the bank makes its claims, in turn were connected to construction contracts in relation to the Umm Wu’al Phosphate Project.

3. The underlying bonds issued by the bank are in the English language but are governed expressly by the law of the Kingdom of Saudia Arabia. The counter-indemnities granted by the defendant to the bank are in the English language and expressly governed by English law and subject to the exclusive jurisdiction of the English courts.

4. The bonds issued by the bank (there were three of them) were originally issued in amounts which I do not need to state in precise figures, since the amounts subsequently changed, of approximately US$28.3 million, US$31.6 million and US$27.8 million. Those bonds provided for them to be extended from time to time, from original expiry date or a prior extended expiry date, upon written request of the beneficiary. They were, in due course, successively extended, pursuant to that contractual mechanism. There is in the evidence before the court a full set of the extension correspondence.

5. The final extension of validity of the performance bonds was for the six-month period from 1 December 2025 to 31 May 2026. At the time of that final extension of validity, the amounts of the three bonds had become the following reduced amounts: the amount of the first bond, US$21,269,622; the amount of the second bond, US$28,722,803.75; and, in the case of the third bond, the amount of US$7,098,874. That is an aggregate total amount of commitment by the bank of US$57,091,299.75.

6. For the purposes of assessing the validity of the bank’s claims, other than of course their separate amounts, the terms of the three bonds were materially identical. I should first for completeness just identify though that they were respectively: the bank’s letter of guarantee number RLG5807746, originally dated 4 May 2014; its letter of guarantee number RLG5807742, originally dated 4 May 2014; and its letter of guarantee number RLG6100025, originally dated 1 January 2017. Material terms of those guarantees or bonds included the following.

7. By each, the bank “hereby unconditionally and irrevocably” undertook to pay the beneficiary the stated guaranteed amount. That was said to be “in accordance with the following”, which introduced a series of numbered provisions: “1. We shall pay you immediately upon your written demand, and irrespective of any objection by the contractor or any other party, such amount or amounts as you may demand not exceeding the maximum liability, by transfer to your account at any bank in the Kingdom of Saudi Arabia or in any other manner acceptable to you.

2. All payments made based on your demand shall be free and clear of, and without any present or future deduction for payment of, any taxes, levies, duties, charges, fees, deductions or withholdings of any nature whatsoever and by whomsoever imposed, except to the extent required by any applicable law.

3. The undertakings contained in this guarantee constitute direct and fundamental obligations of ours and are unconditional and irrevocable. We shall not be excused from any or all of these obligations for any reason or reasons of whatever nature or source, such as change in the conditions of the contract, or extension thereof, or change in the scope or nature of work to be performed, or any omission, act or proceeding by you or by a third party which would excuse or discharge us from the obligations and liabilities stated in this guarantee.

4. This guarantee shall remain valid and in full force and effect up to the end of the 30 days of the month of November of the year 2018. Pursuant to the conditions of this guarantee, if you provide us with a written and signed notice on or before the date specified for the expiration of this guarantee (or any subsequent extensions pursuant to the conditions hereof) that we should extend the guarantee, we shall (i) automatically extend this guarantee for the required period (provided that it does not exceed three hundred and sixty five (365) days) from the initial expiration date of the guarantee, or from the expiration date of any subsequent extensions, as specified in the extension request, or (ii) pay you the value of the guarantee.”

8. The counter-indemnities, then, upon which the bank now makes its claims against the defendant, were and are counter-indemnities: dated 28 April 2014, referring to the first of the bonds issued to the beneficiary; also dated 28 April 2014, and relating to the second of those bonds; and dated 22 December 2016, relating to the third of the bonds. In each case, and in classical fashion, the counter-indemnity recited that it was issued to the bank in consideration of the bank agreeing to issue the respective bond to the beneficiary.

9. The counter-indemnities thus included amongst others the following terms: “1. Counter-indemnity 1.1 We shall indemnify the Bank and keep it fully indemnified against all losses, claims, demands, liabilities, costs, charges and expenses as evidenced to us by the Bank which may be brought or preferred against the Bank or which the Bank may incur arising out of or in connection with the Bond or by the Bank enforcing or attempting to enforce its rights under this Counter-indemnity and up to the maximum amount as established above plus all reasonable losses, costs, charges and expenses. 1.2 We irrevocably and unconditionally authorize and direct the Bank: (a) to pay any claim made or purported to be made under the Bond which appears on its face to be in order (a ‘Claim’); or (b) to comply with any request or demand by the Beneficiary to extend the expiry date of the Bond (save where the Bond requires that any such extension be subject to our or any third party’s prior approval in which case compliance with such request shall be subject to such approval being obtained) subject in each case to any such Claim, request or demand being in accordance with the terms of the Bond. The Bank shall be authorized to make such payment and/or to comply with such Claim notwithstanding that we or any other person may dispute such Claim, and to do so with or without any reference to or further authority from us and whether such Claim is received by delivery of the original via post or courier, by facsimile, by email, by authenticated SWIFT message or by any other means provided such form of presentation is not excluded under the terms of the Bond. We acknowledge that the Bank is not obliged to carry out any investigation or seek any confirmation from us or any other person before paying a Claim. We will in the event of payment having been made by the Bank pursuant to a Claim, pay to the Bank within five days from its written demand accompanied by the documents stated in clause 6.1, an amount equal to all sums so paid in the same currency as payment made by the Bank and demanded by the Bank from us together with interest at the rate of 1 % (one per cent) over LIBOR on any amount paid by the Bank (or on so much thereof as shall for the time being be outstanding) from the date on which it is so paid by the Bank until actual payment by us to the Bank. We irrevocably agree and undertake that our obligations under this Counter-indemnity shall apply to the Bond as extended from time to time (including any other modifications or amendments to the Bond including for the avoidance of doubt any amendment to the underlying amount of the Bond as agreed between us) or to any payment made under it. 1.3 Our obligations under this Counter-indemnity will not be affected by: (a) the sufficiency, accuracy or genuineness of any demand under the Bond, any Claim or any other document; (b) any incapacity or limitation on the powers of any person signing a demand or request under the Bond, any Claim or other document; (c) the legality of a Claim or any underlying transaction or any available set-off, counterclaim or other defence of any person; or (d) any invalidity, illegality or unenforceability of the Bond. We agree that any payment which the Bank shall make in accordance with a Claim shall, provided it appears to be prima facie valid, be binding on us and be accepted by us as conclusive and binding evidence that the Bank was liable to comply with the terms of such Claim in the manner and amount demanded. […] 1.6 We irrevocably authorize the Bank to debit any account in our name with any sums due from and payable by us hereunder, but without prejudice to any other right or remedy available to it. 1.7 All payments made by us under this Counter-indemnity shall be made without set-off or counter claim and free and clear of any deductions or withholdings whatsoever. If we are compelled by law to make any deduction or withholding we will pay to the Bank such additional amount as will result in the net amount received by the Bank being equal to the full amount which would have been receivable had there been no such deduction or withholding. In the event that we are compelled to make such deduction or withholding, we shall forward, within 90 days after such deduction or withholding is made, official receipts or other official documentation acceptable to the Bank evidencing payment of such deduction or withholding. 1.8 The Bank shall notify us promptly in case of any Claim under or in connection with the Bond or if any other demand or request is received by the Bank from the Beneficiary. […]

6. Calculation and Certificate 6.1 A certificate of an officer of the Bank stating the amount which the Bank has paid under the Bond together with a copy of the Claim of the Beneficiary shall, in the absence of fraud and error, be conclusive evidence of the amount which the Bank has paid under the Bond. […]

12. Governing Law 12.1 This Counter-indemnity and any non-contractual obligations arising out of it or in connection with it shall be governed and construed in accordance with English law. Any dispute concerning this Counter-indemnity shall be settled in the English courts. 12.2 We irrevocably submit to the exclusive jurisdiction of the English courts to settle any dispute or claim that arises out of or in connection with the Counter-indemnity (and any noncontractual obligations).”

10. On 29 December 2025 the bank received three claims from the beneficiary, one under each of the bonds, in each case for the maximum amount then of the obligation under the bond and therefore in aggregate for the total amount outstanding, to which I have already referred, of c.US$57.1 million. The bank promptly notified the defendant that it had received those claims and provided copies of them. The bank gave notice of its intention to make payment against those demands, assessing as it did that each appeared on its face to comply with the requirement for written demand to trigger payment.

11. For value on 8 January 2026, the bank duly paid the demands in full and thus paid in aggregate again that same amount to which I have referred earlier, a little over US$57 million. On the same day, the bank sent formal written demands to the defendant in appropriate terms, in accordance with the counter-indemnities, requiring reimbursement.

12. On the evidence that has been provided by the bank in support of this summary judgment application it is plain that the defendant has made no payment of any amount in respect of any of the three demands. Nor has the defendant provided any substantive justification or explanation for failure to pay, or raised anything that might have the appearance of a possible arguable defence to the proposition that it is duly liable to make payment.

13. The defendant has not entirely ignored the bank’s demands for payment. On 9 January 2026, a Mr Enrique Domingo acknowledged receipt of the bank’s demands. On 12 January, Mr Domingo sent an email referring to that acknowledgement of receipt, and indicating, in effect, that nothing more was going to be said about the demands. On 16 January 2026, the bank’s solicitors sent a formal letter of claim and letter before action to the defendant. That generated a response by English solicitors Stevens & Bolton, who replied to that letter of claim on behalf of the defendant.

14. That letter engaged on a topic that is not directly relevant for today’s purposes, as to whether the defendant was in breach of an obligation under the counter-indemnities concerning the possible appointment of a service agent within the jurisdiction. That does not arise as a matter that needs to trouble me for today’s purpose, because it is apparent from the evidence the bank has served in support of its summary judgment application that all these proceedings have been duly served directly and appropriately on the bank; and the question of whether there should have been an ability to serve directly and effectively on a process agent in this jurisdiction does not matter.

15. Stevens & Bolton also raised the question, essentially seeking confirmation on behalf of their client, whether the underlying bonds had been duly extended in their validity, such that demands made in late December 2025 were made still at a point in time when the bank’s obligation was live, rather than only after one or more of the bonds might have expired. The documentation which I have now seen, as exhibited to the evidence in support of summary judgment application, was provided in response.

16. No substantive response then to the bank’s claim was communicated, nor, as I said earlier, has any indication of a possible or arguable defence been raised. Stevens & Bolton were never instructed to accept service and so service had to be effected directly, at no doubt significantly greater trouble and expense for the claimant through its legal representatives, not least because of the requirement as a result to have everything translated into Spanish for the purposes of service.

17. Against all of that background, three questions arise as to whether there should be judgment today: firstly, whether it was right to proceed in the defendant’s absence, the defendant having never acknowledged service and not appearing or being represented at this hearing; secondly, whether permission should be granted to the bank to seek summary judgment, although there has been no acknowledgement of service; thirdly, whether, on the merits of the bank’s claim it should be entitled to judgment on the basis that there is no realistic prospect of there being any defence to the claim if the matter proceeded to a fuller trial.

18. As regards proceeding in the defendant’s absence, I indicated at the outset of the hearing that, broadly for the reasons developed in Mr Allen KC’s extremely thorough and clear skeleton argument, I was satisfied that it was appropriate to proceed in the defendant’s absence.

19. The principles are very familiar. The leading criminal case of R v Jones [2001] EWCA Crim 168 , [2001] QB 862 , especially at [22], has routinely also been applied in civil cases. I have reminded myself of the approach indicated by the Court of Appeal in that case.

20. In short, this is a case in which it is very clear on the evidence that the proceedings, and due notification of all subsequent stages in the proceedings, including the fixing of this hearing and then the later re-fixing when it had to be stood out of list on the first occasion because of lack of court availability, have all been duly provided to the defendant (and, where formal service is required, formally served upon the defendant at its registered office in Spain), by effective means of communication, including the use of the email address provided as the point of contact for notifications under the counter-indemnities. The claim form and particulars of claim were also provided to Stevens & Bolton whilst they were acting for the defendant, albeit it not formally instructed to accept service. Likewise, the application notice and supporting evidence were all duly served, and sent for information to Stevens & Bolton.

21. In the circumstances, it is very clear, and I am entirely satisfied, that the defendant is well aware of proceedings, well aware of its entitlement to participate, and well aware of what it was required to do if it wished to participate, and that in the circumstances it is not here or represented at today’s hearing by choice, waiving its right to appear or be represented, rather than because through oversight or other factor it is not here when it wished to participate and advance arguments before the court.

22. In the circumstances, adjourning to provide the defendant another opportunity to participate would merely delay whatever the outcome of these proceedings is going to be by. Delay, in general terms, is to be avoided where there is no good reason to incur it. It would in the circumstance be an injustice to the claimant not to deal with the matter on its substance today, since it is ready to be dealt with and has now been fully argued.

23. The second matter, namely permission to apply for summary judgment, is, in my view, an easy decision in the light of what I have already said explaining the reasons for proceeding in the defendant’s absence. The essential purpose of a requirement for permission to apply for summary judgment, where a defendant has not acknowledged service, is so that the court can be satisfied that it is not a case in which a defendant is unfairly missing out on an opportunity to participate, both generally and, in particular, to seek to challenge, if it might wish to do so, the jurisdiction of the court in respect of the claim.

24. Here, of course, for the reasons I have already indicated, the opportunity has been amply provided and I am satisfied the defendant is aware of it and choosing not to take advantage of it, rather than the situation being characterised in any different way, and there could never have been any question of challenging the court’s jurisdiction in the face of the exclusive jurisdiction clause in the three counter-indemnities.

25. In those circumstances, in line with the authorities on this topic, the general rule is that permission ought to be granted if sought by the claimant. That is to say if the claimant, for it may be whatever are a particular claimant’s reasons, prefers to have its claim assessed for validity on the merits by a judge of the court, rather than dealt with effectively administratively on the basis of a default judgment.

26. As it happens, and as is not uncommon, it is said on behalf of the claimant bank in this case that it positively prefers to seek summary judgment, rather than exercise a procedural right it might have to have judgment entered in default, because it wishes to be able to say that any judgment it has achieved -- if it does achieve a judgment from this court -- is a judgment at the end of a process of examination of the merits of the claim, by which it has satisfied the court that it was a good and valid claim.

27. That, in my judgment, is ample good reason, if specific good reason were required, to grant permission for a summary judgment application to be made, although there has been no acknowledgement of service. So that permission is granted.

28. Thirdly, as to the merits, there is little more that needs to be said, having recited the terms of the bonds issued by the bank, the counter-indemnities issued to the bank by the defendant, and the basic facts. These were, I am satisfied, exactly as the bank has submitted, classic on-demand payment obligations owed by the bank to the beneficiary and then owed by the defendant as counter-indemnifying party to the bank.

29. The demands made to the bank were, on their face, compliant demands seeking to turn the obligation to make payment into cash in the hands of the beneficiary, that being the beneficiary’s irrevocable and unconditional entitlement under bonds of that type. The bank’s counter-demands sent to the defendant are, in exactly equivalent fashion, compliant on their face so as to trigger the irrevocable and unconditional obligation of the defendant to make payment under the counter-indemnity.

30. There is an indication in the case materials that there may be some dispute of some kind in relation to the construction project in reference to which the bonds and counter-indemnities were originally provided. It may be that the defendant or its affiliated entities that were engaged in the project are undertaking an arbitration process in relation to those disputes.

31. In classic fashion, however, and certainly on the terms of the bank’s bonds as issued and the defendant’s counter-indemnities as issued to the bank, those disputes, whatever they may be, have no bearing at all on the validity of the claim that was made on the bank, the obligation the bank therefore had and discharged to pay out under the bonds, and, as a result, the validity of the bank’s demands upon the defendant and the defendant’s corresponding obligation to make payment under the counter-indemnity.

32. There is no real prospect of success for any possible defence to the bank’s claim in this case. It is a plain good claim, and that applies to all three of the counter-indemnities for the full amount claimed. There will therefore be judgment in the principle sum of US$57,820,299.75.

33. The counter-indemnities provided for interest to be payable, on any sum demanded but not paid, at 1 per cent over Libor. As is well known, Libor has ceased to exist. It has ceased to be generated or published as a reference rate. That of course happened some time ago now and well before late December 2025 and January 2026 when the demands under the bank’s bonds and the defendant’s counter-indemnities were made.

34. What to do in contracts referencing a Libor-based interest rate has been considered in the decision in Standard Chartered plc v Guaranty Nominees Ltd and others [2024] EWHC 2605 (Comm) , [2025] 2 All ER (Comm) 46. I agree with Mr Allen KC that applying the approach indicated in that case there is in this instance unarguably an implied entitlement to interest at a reasonable rate that will be similar in nature to what was previously the Libor rate. I also agree that the rate proposed by the claimant here, the Secured Overnight Financing Rate (SOFR), plus 1 per cent reflecting the contractual margin, is a good and reasonable rate to apply to the circumstances of these obligations in the absence of the originally intended reference rate of Libor (plus margin). As he observed, there are aspects of the fixing of a reasonable and appropriate rate in the aftermath of the demise of Libor that a party in the position of the claimant might have sought to raise that would have had the capacity to justify a slightly higher rate again than SOFR plus 1.

35. Therefore -- and if I may say so extremely fairly to the defendant in its absence -- the approach the claimant has adopted there has been to err if anything on the side of marginal generosity towards the defendant as paying party. I am therefore satisfied that on a proper application of the contract terms the claimant has established an entitlement to interest calculated at that rate. If by any chance there had been a basis for suggesting that no rate could be identified to stand in place of Libor to create a contractual entitlement, then I would simply in this instance have awarded interest at that same rate as a matter of discretion under the Senior Courts Act in any event.

36. The total interest calculated on that basis, as shown in a spreadsheet provided for the hearing, was US$1,227,618.27. If I understood Mr Allen correctly, that might have been a figure up to date to yesterday, rather than today, and I ask that he or those instructing him provide my clerk -- if I have got that right -- with the updated figure so that it is up to date today, which would involve the addition of one further day’s interest at whatever was the overnight rate last published.

37. Speaking in slightly rounder terms, that will result in a total judgment sum, inclusive of interest, of a little over US$58.3 million. The precise figure will obviously be set out in the order and judgment to be drawn up and issued by the court.

38. The question then arises as to the rate that should apply to that aggregate judgment sum, inclusive of interest, pursuant to section 44 A of the Administration of Justice Act 1970 . Since the judgment of Foxton J, as he was then, at the time judge in charge of the Commercial Court, in Lonestar Communications Corp LLC v Kaye and others [2023] EWHC 732 (Comm) , [2023] 2 All ER (Comm) 605, at [14], the US prime rate, currently a rate of 6.75% per annum, has been used as a starting point, or default rate, from which a movement in either direction needs to be justified by reference to the facts and circumstances of the particular case.

39. I wonder if the US prime rate has the capacity to be a touch generous to banking institutions, such as the claimant, as a rate to adopt. On the other hand, it would be being adopted in this case as a post-judgment default rate in respect of a large indebtedness now approaching six months overdue for payment. In principle therefore I am content to order post-judgment interest at or in the region of the US prime rate.

40. The further question arises whether simply to order interest at that rate, but which then requires further calculation to be done every time -- if there is continuing nonpayment -- the bank may make further chasing demands for payment or seek, to the extent it is able to do so, enforcement of the judgment debt, by reference to sources extraneous to the order of the court itself setting out the amount to be paid.

41. In line with the discussion between the court and counsel, I take the view that in this case it would be of assistance, and it would be fair and convenient, to fix now a simple standing rate of interest that in my judgment is an appropriate rate that should be paid which will allow the order that is drawn up to be as fully calculated as to state both the applicable rate of interest and, as a result, the amount in interest to be paid per day from today until whatever will be the date of payment. That rate is 6.5% per annum.

42. I do not have at my fingertips, pending the updating of the pre-judgment interest total, the precise final aggregate judgment amount, so I am not going to state now what that daily interest figure will be. Once I have the numbers it is then a simple matter of arithmetic to calculate the daily ongoing interest to be paid after today, to include in the order to be drawn up on today’s hearing that can be dated therefore today. Judgment is being entered now in that amount, to be calculated and reflected in the written order.

43. So that is the judgment and will be the order of the court in substance. That principal amount, the pre-judgment interest figure, subject to it just being updated by the additional data, and then post-judgment interest at the fixed rate of 6.5% per annum, which I will articulate then, to be absolutely clear, as a daily amount of interest in the order that we ultimately draw up.

44. That brings me finally then to costs. I accept the submission of Mr Allen KC that in circumstances where each counter-indemnity includes a specific and additional contractual indemnity in respect of fees and costs incurred by the bank as a result of demand made of it on the bond, it has a contractual right to recover its litigation costs now of having pursued its entitlement under the counter-indemnity against the defendant through to the judgment I have just granted.

45. As Mr Allen KC acknowledged, that is given effect in this court, logically and appropriately, by directing, if a detailed assessment of costs is to take place, that the detailed assessment is on the indemnity basis, in which proportionality is not a separate consideration and reasonable costs, as always, is the measure of recovery, but the burden of establishing that some element of costs incurred was unreasonable in amount or unreasonably incurred is on the paying party, here the defendant.

46. I will however summarily assess the costs, agreeing additionally with Mr Allen KC that it would only serve to increase further the costs, so as to be in itself a disproportionate exercise, to require the claimant now to proceed through to a detailed assessment of the costs of these proceedings.

47. The total costs incurred, as evidenced by an updated schedule of costs, will be, to the nearest £1,000, £208,000. The updated schedule comes to a total of £211,965.52, to be very precise, but Mr Allen KC fairly drew to my attention that it made some allowance for work that would have had to be done if the defendant had at the last minute appeared or been represented for the purposes of this hearing, and work had therefore had to be done dealing with any further correspondence with the defendant in that connection or considering any arguments it put forward. I noted also that the estimated time for attendance at the hearing may be very fractionally greater than the amount of time we will in fact have spent. So the headline figure is one of £208,000.

48. If -- which would be my normal rule of thumb when asked summarily to assess a schedule of costs, which if subject to detailed assessment would be assessed on the indemnity basis -- I had in mind a likely recovery of between 85%, and perhaps at the maximum 90% of the costs incurred, other things being equal, I would be minded summarily to assess the costs at, in this instance, £180,000.

49. Two matters of concern arise.

50. One, as Mr Allen KC most fairly drew to my attention, is that his instructing solicitors are not based in London and, as a result, the hourly rates claimed are on the high side, compared to guideline hourly rates that would -- subject to the particular needs of the individual case -- be thought to be applicable. This, however, is a high-value commercial claim involving some substantial complexity, including procedural complexity, generated by the defendant’s own conduct in not participating more actively, so that particular and additional care was required to ensure, in this international context, that everything was done properly to ensure that the claimant would be able to pursue its rights as it wished to do. In my judgment, it is appropriate to have regard to the full hourly rates claimed, higher than guideline hourly rates for the solicitors’ location though they are.

51. The second area of concern, about which I have made in the course of dialogue with Mr Allen some moderately trenchant observations, is that I am significantly concerned that the sheer number of hours that seem to have been spent on various of the documentary processes required to bring this matter to this summary judgment hearing have been heavily excessive, as compared to anything that in the interests of the paying party one could consider reasonable, irrespective of how matters might lie as between the solicitors and their client, the claimant.

52. The total solicitor time at the hourly rates, to which I have said there is no proper objection in relation to work on documents, comes to just over £95,000 out of the headline total that I have said I started with. It does seem to me that a material reduction of that part of the summary costs schedule should be notionally built into any overall summary assessment figure that I settle. I take into account in deciding the level of that reduction the fair point raised by Mr Allen KC, and to which I have already referred, namely that to, I am sure, a very real extent the amount of work on this case has been aggravated from the costs perspective by the defendant’s decision after initial apparent willingness to engage, and do so through English solicitors, thereafter, as I put it in the discussion, rather to put its head in the sand in the hope that this might all go away.

53. The truth of course is that this was never going to go away, and litigants taking that attitude, particularly litigants based outside the jurisdiction taking that attitude, tend by doing only to increase the amount of work that the claimant’s legal advisors need to put into the case, which ultimately merely increases their own -- that is the defendant’s -- liability, if they are liable on the substantive claim, when it comes to costs. So I do bear that in mind as likely to have been a significant reason explaining why the overall figure ends up quite as high as it does, even if it does not draw fully the sting of my concern that nonetheless the hours spent were just unreasonably many.

54. In the circumstances, I would apply at 100%, as it were, an initial downward adjustment of £25,000 on the work done on documents element of the bill, but bearing in mind that I am then assessing costs overall in the range of 85% or so of the total claimed, that should be reflected in a reduction in the recovery of £20,000, leaving me with a summarily assessed total of £160,000. -------------------------------------------- Digital Transcription by Marten Walsh Cherer Ltd 2 nd Floor, Quality House, 6-9 Quality Court, Chancery Lane, London WC2A 1HP Telephone No: 020 7067 2900 DX: 410 LDE Email: [email protected] Web: www.martenwalshcherer.com